| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: SDGM Name of Work: Type Testing of BHEL KAVACH Panels & its accessories Contract No: 278561 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )Notes: 1. Rates of Below mentioned items referred in BOQ is firm. Refer Annexure 1 of BHEL Technical Specification EN-TS-04-52-505-K-003. 2. CONTRACTOR SHOULD QUOTE PERCENTAGE (%) ABOVE/BELOW (OR) AT PAR WITH RESPECT TO TOTAL AMOUNT.3. QUOTED PERCENTAGE (%) IS APPLICABLE ON ALL ITEM RATES UNIFORMLY.4. GST Extra applicable (on Total Quoted Price/Rate). NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Test Category/Type Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Developmental Tests (As per Sl No 3.00- 1,2,3,4,5,6) |
| 3 | Environmental/Climatic Test |
| 4 | Dry heat test (Operation)For functional trials: Temp.70 ⁰C, Duration: 16 hrs.As per IS: 9000 Pt.III Section: V |
| 5 | Dry heat test (Storage)Temp. 75 ⁰C,Duration: 16 hrs.As per IS: 9000 Pt.III Section: V |
| 6 | Cold Test(Operation)Temp. -10 ⁰C ± 3 ⁰C, Duration:2 hrs.As per IS: 9000, Pt.II |
| 7 | Rapid Variation Temperature Test/ Change of Temp Test'-10 ±3 ⁰C to +70 ⁰C±2 ⁰C, Duration:7 hrs at each temperature.Rate of change: 1⁰C perMinute.No. of cycle: 03As per IS: 9000 Pt.XIVSection: II |
| 8 | Damp heat test(steady state storage)RH 93% (+2 %, -3%) @40 ⁰C±2 ⁰CDuration = 4 days, As per IS: 9000 Pt.IV |
| 9 | Damp heat test(Cyclic)RH 95% (+1 %, -5%) @40 ⁰C ±2 ⁰C (high), 25 ⁰C (low)Duration: 12 + 12 = 24 hrs.cyclicNo. of cycles = 6(Fully functional during one hour period toward end of each cycle. Stablisation shall be done at 25º± 3ºC).As per IS: 9000 Pt.VSection-II |
| 10 | Bump Test(Package)Peak acceleration 400 m/s2 or 40g, 1000bumps per axisDuration: 6 millisecondsNo. of axes: 03, As per IS: 9000 Pt.VIISection II |
| 11 | MechanicalShockPeak acceleration: 20gPulse Duration: 11 millisec(Half sine pulse).Total No. of shocks: 18No. of axes: 3 shocks in eachdirectionEquipment in unpacked conditionshall be subjected MechanicalShock. In addition tophysical checks, the assemblyshall be subjected to performancetest.As per IS: 9000 Pt.VII , Section-I orIEC 60068-2-27 -2008 |
| 12 | MechanicalShockPeak acceleration: 40 g.Duration of the pulse: 11m.sec.No. of shocks: 18Velocity change : Half sinepulse, As per IS 9000Part VIISec. 1Clause 9 |
| 13 | Vibration testFreq. Range: 5 Hz to 350 HzAcceleration: 2 gNo. Of Axis: 3No. Of Sweep cycles: 20Total Duration: 105 min/axisIf resonance is observed: 10 minutes at each resonant frequency.As per IS: 9001 Pt.XIII |
| 14 | Vibration testFreq. Range: 5 Hz to 150 HzAcceleration: 3 g.No. Of Axis: 3No. of Sweep cycles: 20Total Duration: 105 min/axisIf resonance is observed: 10 minutes at each resonant frequency.As per IS: 9001 Pt.XIII |
| 15 | Salt Mist Test-On Board (insidecab) & IndoorProcedure 3: Salt Duration:2hrs, MistDuration =22 hours35º± 3⁰C, RH: 93% (+2, -3%) No. of cycles: 03As per IS: 9000 Pt.XI |
| 16 | Salt Mist Test- On Board (outsidecab) & Outdoor (OnTrack /Track side)Procedure 2: Salt Duration:2hrs, Mist:Duration=7 days35º ± 3⁰C, RH: 93% (+2, -3%)No. of cycles: 04As per IS: 9000 Pt.XI |
| 17 | Dust test1 hour onlyAs per IS: 9000 Pt.XII |
| 18 | Water Immersion TestHead of water 1 m Duration 24 hours Condition After this test, electrical parameters shall be monitored in addition to physical checks (Ingress ofwater). As per Annexure F & RDSO/SPN/144/2006 Rev 02 :Clause 9.3 - 8/ IS 9000Part XVSect. 7 |
| 19 | Driving Rain testWater spray for 1 hourAs per IS 9000Part XVITestcondition ‘c’ |
| 20 | Insulation Resistance (IR) Test after completion of each Climatic ClauseThis test shall be conducted between the equipment power supply line terminals and the earth. Clause no. 23.4.1 (b) of RDSO/SPN/196/2020 SRS Ver.-4.0, Ref.- 9.5 (c) of RDSO/SPN/144/2014 |
| 21 | EMI/EMC |
| 22 | Variation and interruption of voltage supply1. Voltage fluctuations lying between 0.6 Un and 1.4 Un and not exceeding 0.1s (100msec) shall not cause deviation of function.Note : Un is Nominal voltageOnboard KAVACH: 72 VDC Nominal voltage0.6 Un = 43.2V, 1.4 Un = 100.8 VDC(Input voltage variation from 43.2 VDC to 100.8 VDC)Onboard KAVACH: 110VDC Nominal voltage0.6 Un = 66.0V, 1.4 Un = 154.0 VDC(Input voltage variation from 66.0 VDC to 154.0 VDC)2. Interruption of voltage supply: system input power supply ON/OFF Interruptions up to 10ms. This shall not cause any equipment failure. As per (Class: S2) to equipment tests as per clause 5.1.1.2 and 5.1.1.3 of IEC 60571 -2012 in accordance with IEC-61000-4.29 or relevant clause of latest amendment/issue. |
| 23 | Supply Overvoltage1. Supply over-voltage (as per below Table)i. Voltage level (minimum) 1.4 UnNote : Un is Nominal voltageOnboard KAVACH:72V Nominal Voltage: 100.8V DC110V Nominal voltage : 154.0V DCii. Duration d(max) raise time, fall time : 0.1Seciii. Duration D (maximum) stable state : 1.0 SecAs per clauses 5.2 & 12.2.7 of IEC 60571 -2012 in accordance with IEC-61000-4.29 or relevant clause of the latest amendment/issue. Electrostatic discharge tests shall be carried out as per Clause 9.4.1 of RDSO/SPN/144/2006 or the relevant clause of the latest amendment. |
| 24 | Surge TestsSurges (as per below Table)Apply between the system voltage potential return and equipment earth terminal.Voltage level (Tolerance +/-3 %) : 1800 VRaise time (10% to 90% voltage level): 5 μs and Raise time 50% to 100%, fall time 100% to 50% : 50 μs.As per clauses 5.2 & 12.2.7 of IEC 60571 -2012 in accordance with IEC-61000-4.29 or relevant clause of the latest amendment/issue. Electrostatic discharge tests shall be carried out as per Clause 9.4.1 of RDSO/SPN/144/2006 or the relevant clause of the latest amendment. |
| 25 | 7 KV discharge test1. Chassis of the equipment shall be firmly grounded.2. A charged capacitor of 7 KV should be discharged by touching the chassis by testing probe through 330Ω resistance and 150pF capacitor.3. The above discharge test should be repeated minimum 3 times.As per RDSO/SPN/144/2006:Clause 9.4.1. |
| 26 | Transient Burst & Susceptibility TestIncluding Electrical Fast transient and Radiated susceptibility, Conducted Susceptibility. As per clause 5.5 of IEC 60571-2012 in accordance with IEC-62236-3-2 or relevant clause of latest amendment/issue |
| 27 | Radio Interference TestIncluding conducted Emission, Radiated emissionAs per clause 5.5 & 12.2.8 of IEC 60571-2012 in accordance with IEC-62236-3-2 or relevant clause of latest amendment/issue. Total in Figures 3550287.5 3550287.5 INR Thirty Five Lakh Fifty Thousand Two Hundred & Eighty Seven and Paise Fifty Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |