| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres as per MORT&H Specification No. 202, Sl. No. 2.4 |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MORT&H Specification No. 304, Sl. No. 15.01 |
| 3 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification. as per MORT&H Specification No. 304 S.l No. 15.03 |
| 4 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC grade M 15) (Case-II: Using concrete Mixer (as per MoRT&H Specification No. 1500, 1700 & 2100) Sl. No. 15.11 A |
| 5 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC grade M 20) (Case-I: Using concrete Mixer (as per MoRT&H Specification No. 1500, 1700 & 2100) Sl. No. 15.11 B |
| 6 | Plain/Reinforced Cement Concrete for wall and slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M35) (as per drawing and Technical specification MORT&H no. 1500, 1600 & 1700 Sl. No. 15.12D) |
| 7 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. MORT&H no. 1600 Sl. No. 15.13) |
| 8 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications No. 1400 & 2200 Sl. No. 15.10 |
| 9 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification MORT&H no. 2504 Sl. No. 16.05) |
| 10 | Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications MORT&H no. 1300 & 2200 Sl. No. 15.08) |
| 11 | Dewatering of foundation by 5HP Diesel Engine Pump |
| 12 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications Clauses 2706 & 2200 Sl. No. 15.14 |
| 13 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MoRT&H Specification No. 305 (Sl. No. 3.16) |
| 14 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 as per MoRT&H Specification No. 401 (Sl. No. 4.01) |
| 15 | Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . |
| 16 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications No. 2504 Sl. No. 16.04 |
| 17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Sl. No. 4.14) |
| 18 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (ETA) specification including premixing the Material with water at OMC (with 1% OPC & 3.5% SS-1 emulsion) in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Sl. No. 4.14) |
| 19 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Sl. No. 5.2) |
| 20 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Sl. No. 5.4) |
| 21 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Sl. No. 5.5) |
| 22 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Sl. No. 3.18) |
| 23 | TRAFFIC SIGNS - HAZARD MARKER (LEFT/RIGHT) Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting vide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x75 mm x6 mm firmly fixed to th ground by means of properly dsignd foundation with M-15 grade cment conc. 45 cm x 45 cm x 60 cm, 60 cm below ground lvel as per approved drawing |
| 24 | Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming toIRC-79 and the drawings. MORTH-805(8.150) |
| 25 | Providing and erecting a \\"W\\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post 150x75x5 mm spaced 2m center to center, 1.8 m high with 1.1 m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fittings to conform to IS:1367 and IS:1384, metal beam rail to be fixed on the vertical post with spacer of channel section 150x75x5 mm, 300 mm long complete as per clause 810. (MoRTH-810 (8.23) Sl. No. 27 Please Enable Macros to View BoQ information |