| 1 | Safe Carriage of following Materials from ESC Store Centre Unnao to work dump site/dump site to ESC Store along with loading unloading & proper stocking as per requirement. |
| 2 | PCC/STP Pole |
| 3 | HT XLPE Cable 3x70 sq mm / 3X120 sq mm 11 KV |
| 4 | ACSR Weasel/ Rabit Conductor |
| 5 | Arial bunch Conductor 1X16 / 3X50 / 3X95 sq mm |
| 6 | Distribution Transformer 25 KVA/ 63KVA/ 100 KVA 11/0.4 KV |
| 7 | 11 KV Pilfer proof metering cubical and CT/PT unit |
| 8 | Loose line material. |
| 9 | Erection of PCC/ STP Double Pole Structure including digging of pit and fitting of all accessories complete. |
| 10 | Erection of PCC/ STP Pole including digging of pits, fitting of all accessories with its cartage dump site as per RESPO norms. |
| 11 | Making of H.T./L.T. Section points for line tapping, by brackets, clamps & Making of T-off arrangement for including fabrication and fitting of all accessories. |
| 12 | Grouting OF PCC Pole as per RESSPO norms with grouting materials. |
| 13 | Earthing of PCC/ STP Pole as per RESSPO norms. |
| 14 | Digging of pits, fixing, nuzzling and grouting of stay rods as per RESSPO norms with grouting materials. |
| 15 | Fabrication/ Modifications of MS Items,for macking Sub Station/HT/LT Line for 25/63/100 KVA Distribution Transformer, Nuts & Bolts as per requirement of site conditions. |
| 16 | Dismantling for line shifting of single pole/ Double Pole , Conductor, AB Cable per spon and X-arms,brackets, Insulators, Channels and all hardware fittings. |
| 17 | Dismantling for Shifting Distribution Transformer on pole / plinth, Earthing and all related fittings. |
| 18 | Placement of 11/0.433 KV Distribution Transformer newly constructed T/F on Duble Pole Installation and commissioning of 25/63/100 KVA Transformer including lugs, Jumpering & connecting Earthing of body & neutral as per required. |
| 19 | Providing and Fixing of following materials |
| 20 | Holding clamps for PCC/STP with Nuts & Bolts. |
| 21 | Stay clamps for PCC/STP with Nuts & Bolts. |
| 22 | LT clamps for PCC/STP with Nuts & Bolts. |
| 23 | F-clamps for PCC/STP with Nuts & Bolts. |
| 24 | LT shacale Insulator with Nuts & Bolts. |
| 25 | Laying of 11 KV cable size 3x70 sq mm/120 sq mm, dragging of trench 1050 mm, deep 520 wide, including all materials etc. /overhead on pole as required on site. |
| 26 | Making of cable box for 11 KV 3x70 to 3x120 mm cable jointing kit/cable box. |
| 27 | Laying Stringing & sagging of HT line by ACSR Weasel Conductor including all related work as joints /jumpers and binding on Insulators as required. |
| 28 | Laying, stringing Aerial Bunched Cable 1x16 / 3x50/ 3x95 sq mm including all related work as joints /jumpers and binding on Insulators as required. |
| 29 | Installation testing and commissining New 11 KV Pilfer proof metering cubical in Metering Room and CT/PT unit on pole and Cable terimanison, connecting earthing etc. |
| 30 | Installation and commissioning of H.T. D.O. Fuse Set with Dropper Channel on new double pole as per RESPO norms. |
| 31 | Cable Hosting at Pole with GI Pipe & Clamps as per norms (GI pipe provid by Contractor.) |
| 32 | Laying, stringing, tensioning & final sagging Guarding of Earth wire/G.I. wire including of cross lacing (minimum 10 no. in each span) |
| 33 | Chopping of tree branches lying in the route of making new 11 KV / LT line. |
| 34 | Resived back dismantling mattrial from work dump site/dump site to ESC Store along with loading unloading & proper stocking as per requirement. |
| 35 | Distribution Transformer 25 KVA/ 63KVA/ 100 KVA 11/0.4 KV |
| 36 | Iron Scrap |
| 37 | Old & used / damaged Cable/ Conductor Please Enable Macros to View BoQ information |