| 1 | Supply and Fabrication of vertical lift sliding Gate leaf consisting of Wall liner- 3000X 140X 8mm- 2nos,Wall liner- 3000X 100X 8mm- 4nos,Sill beam- 1500X 1/2 CUT MB 200 - 1nos,Side seal SS seat- 3000X 60X 6mm- 2nos,Sill beam SS seat- 1400X 60X 6mm- 1nos1st stage embedments Ø16 Studs, bolts, nuts, washers etc.-10kg with all accessories including machinery, fixtures, labour, cutting, drilling & boring, alligning, welding, cleaning, finishing all complete as per specification and approved drawings with all lead and lifts (excluding bought out items).as per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 2 | Supply and Fabrication of vertical lift sliding Gate leaf consisting of Skin plate- 1400X 1500X 8mm- 1nos,End V girder- 1500X 65X 10mm- 2nos,Hor. Girder- 1380X ISA 65 x 65x 6- 3nos,diaphrgm-1- 1450X 50X 8mm- 4nos,Side seal mounting - 1500X 40X 8mm- 2nos,Side seal clamp plate- 1500X 35X 8mm- 2nos,Pad base- 80X 30X 25mm- 4nos,Bronze pad- 80X 30X 12mm- 4nos,Btm. Seal (10mm thick)- 1.4 m long, C/s Area(m²) - 1nos,Btm. Seal clamp pl- 1400X 50X 8mm- 1nos,Ø25 Side Seal- 1.5 m long, C/s Area(m²) 2nos,Lifting bracket- 600X 115X 12mm- 2nos,Lifting Pin- 130X Dia 30mm- 1nosC/s Screw, bolt/nut etc.-10kg with all accessories including machinery, fixtures, labour, cutting, drilling & boring, alligning, welding, cleaning, finishing all complete as per specification and approved drawings with all lead and lifts (excluding bought out items) as per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 3 | Supply and Fabrication of Steel hoist bridge of Left and right HR Scouring Sluice gate size(1400mmx1500mm) consisting for single stem Nut type screw gear box hoist consisting of Base plate -400X 200X 8mm- 4nos,CI gear box base plate -400X 300X 16mm- 1nos,Supporting beam -2000X ISMB 150- 2nos,Anchor bar -350X Dia 20mm- 16nos,Chequered plate -1700X 400X 6mm- 1noswith all accessories including machinery, fixtures, consumables, labour, cutting, alligning, welding, cleaning, finishing all complete as per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 4 | Supply Bought out materials for Screw hoist gear box LTB-1 Bronze pad of size 80mm x 30mm x 12mm (including cost of material, machining & countersunk holes)- 4 Nos, Bottom Seal ( Plate75 x 10mm)- 1.4m- 1nos,Side Seal ( Ф25-70 x 10mm)- 1.5m- 2nos,1st stage embedments, Ø16 Studs, bolts, nuts, washers etc.- 20kg,Nut type Screw Gear box assembly suitably square threaded for 63mm dia screw rod - 1nos Anchor bars-16nos,Lifting pin- 1nos,Screw rod 63 mm Dia suitable square threaded to M62x9 including cost of material, straightening and machining.- 1.7m-1nos,63 mm dia round plane Rod- 1.45m- 1nos,Lubricant like grease & mobil-2kg,Gate Lifting Handle - 1kg all inclusive of material, machining as required & as specified in drawi- 4Nos as per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 5 | Erection, positioning, alligning, fixing, trial and commissioning including unloading and shifting upto location of all componentsof 1st stage and 2nd stage Embedded parts (consisting of sill beam, wall liners, track plates etc), Vertical Gate leaf (complete assembly with fixing of bronze pad, rubber seals), Steel hoist bridge assembly (consisting of hoist platform, Screw rod, lifting gear box, supporting beams, base plates, anchor bolts etc) with all accessories including machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing total 564.99kg for 3 nos left scouring gate and 03 nos right scouring gate including consumables all complete as per direction of Engineer in charge. The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 6 | Painting cost of Embeded part (With one coat Zinc primer & 3 coats of Coal tar epoxy paint),Painting of Gate Leaf (With one coat Zinc primer & 3 coats of Coal tar epoxy paint) and Painting of Hoisting Platform (With one coat Zinc primer & 3 coats of Aluminium paint) including all cost of labour ,consumbale ,hire charge of machinary etc @ Rs.441.92/Sqm.as per direction of Engineer in charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 7 | Labour charges for vent cleaning, Helper 2 Nos for one day -2 Man/ day,Construction of coffer dam by sand bag @ Rs30/- and dismantling after completion of work including cost of labour and sand bag- 40 Nos and Pump with 10HP diesel engine for dewatering of entrapped water- 2 Hrs, 2nd stage Concrete cutting- 0.92 Cum and 2nd stage concreting- 0.63 cum as per direction of Engineer- in-charge..The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 8 | Transportation charges (Truck & Tractor) of bought out material from shop to work site (170 km) including cost of loading & unloading 1 trip. (Rs 30.95/Km/10 tonne, Ref. Page no. 6 of SR for Mech. Works 2018). The cost is inclusive of contractor profit @7.5% and labour cess @1%. Please Enable Macros to View BoQ information |