| 1 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.DSR 2023.13.91 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.DSR 2023.15.3 |
| 3 | Repairs to plaster With cement mortar 1:4 (1 cement : 4 Coarse sand) of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR2023.14.1.2 |
| 4 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. with approved quality material of Berger/J.K./ Birla or similar. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.13.80 |
| 5 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's old work (two or more coats) Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2021.13.108.1 |
| 6 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm)on existing cement paint surface Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.13.111.1 |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. paint to be used should confirem the ISI No. 103-1950 . DSR 2023.13.99.1 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.3 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform.Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.9.3 |
| 10 | Steel reinforcement Mild steel and Medium Tensile steel bars for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Above plinth level. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.DSR 2023.5.22.1 |
| 11 | Providing and fixing of 25 mm thick WPC panel for false ceiling including fixing of GI channel base with fastners and leveling of ceiling etc complete Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. |
| 12 | Supply and fixing of 10\\" dia 22 watt , Indoor recess/ surface mounting LED round Fitting for Armstrong Ceiling Powder quoted CRCA housing body diffuser of Special Polycarbonate meterial and driver set complete in all respect.Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. |
| 13 | S/F of 1200 ceiling Fan approved make complete in all respect.. As approved & directed by Engineer in Charge.Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. |
| 14 | W/P for Light with (modular)1.5 sq mm FRLSH PVC insulated multistrand single core copper condector cable in PVC conduit partly concealed in wall & partly laied in slabe alongwith the rainforcement befor concreting complete with 1.5sq mm FRLS PVC insulated multistrand single core copper conductor cable as earth wire drawn inside the coduit modular type switch and sealing rose/angle/batten holder on 3 mm thick phenolic laminated backalite sheet etc. complete in all recpects as directed including matching colour wash.Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. |
| 15 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.(c)third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d)fourth and final layer of brick tiling with cement mortar (which will be paid for separately.For the purpose of measurement the entire treated surface will be measured.Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.DSR 2023.22.6 |
| 16 | Providing and laying With common burnt clay F.P.S. (non modular) brick tiles of class designation 10 brick tiles over mumty roofs, grouted with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement, over 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat:Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR2023. 12.19.1 |
| 17 | Providing gola 75x75 mm deep chase in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design :Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR2023.12.21.1 Please Enable Macros to View BoQ information |