| 1 | Making of Island in river stream for providing of a dry working area including cost of balli piling, shoring, GI sheets, EC Bags, earth work etc as required and directed by EIC. Including all labour, material, T&P etc complete but excluding GST. |
| 2 | Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification. Including all labour, material, T&P etc complete but excluding GST. |
| 3 | Plain/Reinforced Cement Concrete, M 25 Grade in Well Foundation in well curb complete as per Drawing and Technical Specification.Including all labour, material, T&P etc complete but excluding GST. |
| 4 | Plain/Reinforced Cement Concrete M 30 Grade, in Well Foundation in well Steining complete as per Drawing and Technical Specification. Including all labour, material, T&P etc complete but excluding GST. |
| 5 | Providing sleeves nuts of approved design and length in well steining bars including threading of bars and nuts and their fixing as directed by E.I.C. Including all labour, material, T&P etc complete but excluding GST. |
| 6 | Sinking of 4.5 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. (1) 0.00 meter to 3.00 meter Including all labour, material, T&P etc complete but excluding GST. |
| 7 | Sinking of 4.5 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. (2) 3.0 meter to 10.00 meter. Including all labour, material, T&P etc complete but excluding GST. |
| 8 | Sinking of 4.5 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. (3) 10.00 meter to 20.00 meter. Including all labour, material, T&P etc complete but excluding GST. |
| 9 | Plain/Reinforced Cement Concrete, M 25 Grade in Well Foundation in Plugging the Bottom of well complete as per Drawing and Technical Specification.Including all labour, material, T&P etc complete but excluding GST. |
| 10 | Plain/Reinforced Cement Concrete M 25 Grade , in Well Foundation in Plugging the Top of well complete as per Drawing and Technical Specification.Including all labour, material, T&P etc complete but excluding GST. |
| 11 | Plain/Reinforced Cement Concrete M 30 Grade , in Well Foundation in Well Caps complete as per Drawing and Technical Specification.Including all labour, material, T&P etc complete but excluding GST. |
| 12 | Reinforced Cement Concrete M 30 Grade , in Substructure of bridge complete as per Drawing and Technical Specification.excluding GST. |
| 13 | Furnishing and Placing Reinforced Cement concrete M 35 in RCC slab super-structure including staging and formwork as per drawing and Technical Specification Including all labour, material, T&P etc complete but excluding GST. |
| 14 | Providing and laying cement concrete wearing coat M-35 grade including reinforcement complete as per drawing and technical specifications. Including all labour, material, T&P etc complete but excluding GST. |
| 15 | Supplying, fitting and placing HYSD bar reinforcement complete in foundation as per drawing and technical specification Including all labour, material, T&P etc complete but excluding GST. |
| 16 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications Including all labour, material, T&P etc complete but excluding GST. |
| 17 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications Including all labour, material, T&P etc complete but excluding GST. |
| 18 | Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation. Including all labour, material, T&P etc complete but excluding GST. |
| 19 | Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and MoRT&H item Sr no. 13.14 Including all labour, material, T&P etc complete but excluding GST. |
| 20 | Drainage Spouts complete as per drawing and Technical specification Including all labour, material, T&P etc complete but excluding GST. |
| 21 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. Including all labour, material, T&P etc complete but excluding GST. |
| 22 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Including all labour, material, T&P etc complete but excluding GST. |
| 23 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. Including all labour, material, T&P etc complete but excluding GST. |
| 24 | Providing & laying of inverted filter of sand gravel placed underneath boulder pitching including all material, labour, T&P, etc. required for proper complation of work as per direction of Engineer- in- charge. Including all labour, material, T&P etc complete but excluding GST. |
| 25 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Including all labour, material, T&P etc complete but excluding GST. |
| 26 | Providing and laying of wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each Including all labour, material, T&P etc complete but excluding GST. |
| 27 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including all labour, material, T&P etc complete but excluding GST. |
| 28 | Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4 Including all labour, material, T&P etc complete but excluding GST. |
| 29 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 Including all labour, material, T&P etc complete but excluding GST. |
| 30 | Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Including all labour, material, T&P etc complete but excluding GST. |
| 31 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method, with rotavator at O.M.C. and compacting with smooth wheeld roller to achieve the desired density with 2% Cement, complete as per Technical Specification clause 401. Including all labour, material, T&P etc complete but excluding GST. |
| 32 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstics of coarse aggregate, watering and compacting to the required dencity .Grading 3 as per technical specification clause 405 including 4% cement (OPC) & its mixing with Rotavater. Including all labour, material, T&P etc complete but excluding GST. |
| 33 | Providing and applying Tack coat with bitumen VG-10 using Bitumen pressure distributer @ 0.30 kg. per sqm on the prepared dry and hungry granular surface cleaned with Hydraulic broom as per Technical specification Clause 503. Including all labour, material, T&P etc complete but excluding GST. |
| 34 | Providing, laying and rolling of open graded P.C. of 20mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing course on a previously prepared base i/c mixing in a suitable plant, laying and rolling with a three wheeld 80-100 kN static roller capacity, finished to required level and gredes to be followed by seal coat Type C as per Technical Specification Clause 508 Including all labour, material, T&P etc complete but excluding GST. |
| 35 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including all labour, material, T&P etc complete but excluding GST. |
| 36 | Construction of Granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and with 2 percent cement compacting with vibratory roller to achieve the desired density, complete as per clause 401 Including all labour, material, T&P etc complete but excluding GST. |
| 37 | Bricks (S.O.B) on edge pavement on patries laid and dry, joints filled with local sand including preparation of base to proper slope & its ramming. Spreading layer of 1 cm (3/8\\") depth of local sand over the sub-grade and including supply of all materials labour and T&P etc. required for proper completion of the work. S.I. No. 763 but excluding GST. |
| 38 | Supply and fixing of 1000 mm dia hume pipe. Including all labour, material, T&P etc complete but excluding GST. Please Enable Macros to View BoQ information |