| 1 | Earthing with G.I. earth pipe 4.5 meter long, 40 mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. |
| 2 | Providing and fixing 25 mm X 5 mm G.I. strip on surface or in recess for connections etc. as required. |
| 3 | Providing and fixing 6 SWG dia G.I. wire on surface or in recess for loop earthing as required. |
| 4 | Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. direct in ground, providing boring by trenchless technology with no dig method by making bore hole in horizontal direction across the road as per direction of Engineer-in-charge or his representative with moling equipment i/c jointing cleaning, rodding of pipe providing suitable covers on mouth of pipes, excavation of pits of required size at a following depth i/c refilling etc. complete as reqd. upto 2.5 Mtr. depth. |
| 5 | 63 mm dia (OD-63 mm & ID-51 mm nominal) |
| 6 | Supplying and laying of following PVC insulated and PVC sheathed /XPLE armounrd Aluminum Conductor power cable of 1.1 KV grade of following size in the existing RCC/ HUME/DWC/METAL pipe as required. |
| 7 | 4 X 25 Sq. mm armounrd Aluminum conductor power cable (Colour of XLPE Cable should Skyblue colour with ‘PWD’ embossed /marked on it at every meter.) |
| 8 | 4 X 16 Sq. mm armounrd Aluminum conductor power cable (Colour of XLPE Cable should Skyblue colour with ‘PWD’ embossed /marked on it at every meter.) |
| 9 | 3.50 X 50 Sq. mm armounrd Aluminum conductor power cable |
| 10 | 3 X 4 Sq. mm Unarmounrd Aluminum conductor cable |
| 11 | Fabrication, supplying & fixing triple/single/double galvanized arm bracket of suitable length and dia as required on site i/c tightening bolts etc. as reqd. |
| 12 | Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required. |
| 13 | 3½ X 50 sq. mm (35mm) |
| 14 | LED Street light fixture, powder coated pressure die cast aluminium body (System lumen efficacy ≥120 <135 lm/Watt)Supplying, installation, Testing & Commissioning of Street light LED fixture powder coated pressure die cast aluminium body with driver as per the requirement with Driver efficiency >85%, Input voltage: 140-270 Volt AC, frequency 50/60 hz, Operating temp range -5 0C to 50 0C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%,THD < 10% as per IEC 61000-3-2, P. F.≥0.95, IP-66,IK-10, CRI >70, under voltage and over voltage protection, EMIEMC As per CISPR 15 , lenses for beam angle as per IESNA type I/II/III as per the width of the road and the project requirement., suitable to fit in up to 65mm dia pipe, life time (LED, Driver & electrical circuitry) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin), SDCM(Standard Deviation Colour Matching) <5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. system lumen efficacy ≥120 <135 lm/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). |
| 15 | 150 Watt |
| 16 | 200 Watt |
| 17 | SITC of DWC/HDPE pipe for covering the street light pole of dia upto 200 mm and height minimum 2 Mtr. including cutting jointing etc. with the help of hydra/Tower wagon, pipe must be fixed to the pole from above side to the bottom by removing the arm bracket and fixed the bracket as previous for the protection due to electrocution. (colour of pipe is decide by engineer -in -charge or his representative. |
| 18 | SITC of (SMC)Sheet molded compound Octagonal Pole Cover of minimum 2mm thickness Fire retardant dust proof, rust proof, termite proof, shock proof, vermin proof , anti-corrosive, anti acid, durable, strong, heavy duty, safe for operating lineman, Maintenance free, self-extinguishing properly, resistant to heat, Ultra violet stabilized, FVO - UL 94, weather proof, pilfer resistant suitable for following required height of existing pole. |
| 19 | Supply, installation, testing & commissioning of factory assembled outdoor type hut shaped double door Timer Panel dust & vermin proof powder coated with degree of protection of IP 54 self supported suitable for 3 phase 4 wire, 415 volt AC supply approximate dimension 1350 mm (H), 2200 mm (W) and 300 mm (D) fabricated out of 2mm thick CRCA sheet with locking arrangement i/c 3 mm thick sheet in bottom for gland plates, supplying & fixing following accessories as mentioned below i/c 400 AMP Aluminum bus bars inter connection, arrangement for cable entry/support/ termination 2 Nos. earthing stud inter connection with 25mm x 5mmm Copper strip (externally) 50mm x 50mm x 6mm MS angle iron base frame duly welded 100cm long welded with 4 Nos legs for grouting in foundation i/c painting, Pdg. of 1:3:6 (1 Cement : 3 Coarse sand : 6 Aggregate stone 20mm nominal size) foundation (600mm below the ground level and 400mm above the ground level) it should be covered with Aprin plate (400mm above the ground) not less than 3 mm thick etc. complete with Smart Field Device (SFD) having Processor, Electrical Parameters Measurement of entire lighting system, Fault Detection, Feeder point Switching, Analog and Digital Inputs/Outputs, Electrical Metering, Battery backup with Battery Management System for SFD system, Power Module, Live Supervision and control of feeder capability etc., with system protection accessories and communication system to connect to cloud computing based secured data Centre having following (a) Smart Field Device with inbuilt RTC, Relay modules and SIM - 1 Set.............................Cont............................. |
| 20 | (b) Multi functional 3-phase digital Energy Meter (measure voltage, current, power factor, active/reactive power, energy consumption etc.)- 5 Set (c) Transformer based power supply with 2KV isolation surge protection input side, 12V surge protection output side - 1 Set(d) SP/DP Control MCBs, Surge protection Device, Battery Management System, Battery Backup with Lithium Battery, Over Voltage and Under Voltage Protection, Door Tamper Sensor, 4G SIM, Cloud charger and software & Cloud Maintenance for 1 Year- 1 Jobi/c dismantling and credit of old defective feeder pillar disconnection of all connected cables and buyback for the same complete with dressing of cables and cutting of unused cables complete as per direction of engineer in charge or his representative as required.INCOMING:- 250 Amps, 35/36KA 4 Pole TM MCCB with Ics=100%Icu -01 Nos. Red, Yellow & blue LED for Phase and LEDs for ON, OFF and Trip Indicating lamps with protection MCBs -01 Nos. OUTGOING:- 125 Amps, 35/36KA 4 Pole TM MCCB with Ics=100%Icu -05 Nos. 130 A FP AC-1 Duty Power Contactor-05 Nos. ON, OFF and Trip Indicating lamps with protection MCBs -05 Nos. Danger notice plate -01 Nos. Please Enable Macros to View BoQ information |