| 1 | De-Watering:-Suplying all materials, labours, T&P, 5.00 HP Diesel etc. |
| 2 | De-Silting:- Supplying all materials labour T&P, Excavation of any available etc. |
| 3 | Labour for Cleaning of pond area vegetation and removing unwanted materials away from worksite. |
| 4 | Dismantling old brick or stone masonary under 10 mt height and removal of etc. |
| 5 | Dismantling of cc and removal of debris within 50 m lead etc. |
| 6 | Earth work in excavation of foundation in hard soil of within initial lead and lift. |
| 7 | Earth work in slushy soil (in water up to 0.6 M depth requiring the aid of pans and etc. |
| 8 | Supplying all matail, labour T & P and spreading of iron Ore slag including Ramming or etc. |
| 9 | Filling sand in foundation and plinth well waterd and rammed etc. |
| 10 | CC-(1:4:8) using 40mm size H.G Metal with all cost, conveyancy and royalities etc. all complete. |
| 11 | C.C (1;2:4) using 12mm size stone chips with all cost, conveyancy including rigid smooth etc. |
| 12 | R.C.C M-20 with 12mm and 20mm size stone chips including all cost, conveyancy and royalities etc. |
| 13 | Supplying, providing and fixing of M.S Reinforcement for R.C.C Works etc. |
| 14 | Disposal of excavated earth upto 5 km lead etc. |
| 15 | Rigid smooth centring and shuttering........etc. all complete. |
| 16 | Rigid smooth centring and shuttering for beams,columns.........etc. all complete. |
| 17 | Fly Ash brick masonry in cm(1:6) for foundation & Plinth etc. |
| 18 | Providing, fitting of M.S Grill, gate, window etc. all complete. |
| 19 | Supplying, fitting and fixing of 300 mmx300 mm chequered tiles of approved quality laid on 25 etc. |
| 20 | providing 12mm thick c.p. over column including cost, tax all etc complete. |
| 21 | providing weather coats of 2coats over primimng including cost, tax all etc |
| 22 | same as above |
| 23 | painting over wall with artitechtural design all etc complete. |
| 24 | Provision for dewatering |
| 25 | Dry R.R h.g stone masonary in F& P including all cost,tax etc. complete. |
| 26 | Display board |
| 27 | Rigid & smooth centering & shuttering for RCC works including false works and dismentling after casting including cost of materials complete. Please Enable Macros to View BoQ information |