Name of Work:- Construction of Link Road Erzanak to Moti Das Chulichan (From RD 1317- 1900 Mtrs) (Under Dist. Capex)
Sl. No.
Item Description
1
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2
All Kind of soil @10%
3
Soft Rock @15%
4
Hard Rock(R.B) @40%
5
Hard Rock(B.P) @35%
6
Earth work in excavation by manual means in trenches for foundation, drains, Pipes, cables etc.(not exceeding 1.5 mtr in width ) and for shafts, wells .cesspits and the like not exceeding 10sqm on plan
7
All Kind of soil @10%
8
Ordinary Rock @15%
9
Hard Rock(R.B ) @40%
10
Hard Rock(B.P) @35%
11
Disposal of Excavated earth rock, soil etc. by mechanical means for lead of 1 km
12
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand). (Quarry stone). excluding Cost of stone and 200 mtr by H/L.
13
Random rubble masonry with hard stone laid dry in foundation, plinth & walls, Laid with bond stone and 200 mtr by H/L.
14
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
15
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
16
Dumping or filling of stone /earth excluding carriage up to site complete job
17
Stone 60%
18
Earth 40%
19
Dowel bar: Providing and fixing reinforcing steel in position HYSD reinforcement of grade Fe-500 for dowel bar in drilled hole in rock with cement slurry 450 mm deep in rock and 900 feet above the surafce with lateral bars 12mm in criss cross including fabrication, including cost of drilling of hole in the rocks
20
Centering and shuttering including strutting, propping etc. complete and removal of form for:
21
Foundation, footing,bases of Coulmns etc for mass concrete. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.