| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts.D6 |
| 2 | Providing and laying cement concrete 1:6:12 (1 cement: 6 fine sand : 12 graded brick aggregate 40 mm. Nominal size) including supply of all materials, labour and T & P etc. required for propercompletion of the work and curring complete, also including cost of form work in foundation and floors. SOR-273 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | Providing and laying of Rubber moulded (Read clour)concrete bolck Interlocing pavements having thickness 80mm including leveling and dressing of surface to required level and slope, spreading and moisting 30 m thick local sand etc. for proper completion of the work as per drawing and technical specification clause 1504 SI NS page 50 sl no 03 |
| 5 | M-150 brick work in 1:4 cement and sand of 1.25 FM mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of work SI 305. |
| 6 | 12 mm thick plaster with cement mortar in proportion of 1:3 cement and sand of 1.25 FM Over brick work minimum thickness not to be less then 10 mm including supply of all materials labour and T&P etc. required for proper completion of work. SI 582 |
| 7 | Cost of reinforced cement concrete in the propotion 1: 2:4 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B. W.G.G.I. binding wire including the cost of binding wire, moulds and all other materials, labour and T & P etc. required for proper complection of the work. SOR 284 |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications |
| 9 | Providing and laying in cement concrete 4: 2 :1 of not less than strength of M 150 stone ballast (40 mm. Nominal size) Zapproved coarse sand : 1 cement including supply of all materials, labour and T & P etc. required for proper completion of the work and curing complete including cost of form work in foundation and floors |
| 10 | p\l 450mm rcc hum pipe np3 with coller and spigot |
| 11 | con . Man hole 0.60x0.60x1.20 site with all compt work. |
| 12 | S/L chainal gurder at site with all compt work etc. |
| 13 | Supply and fixing of inauguration board at side with all compt. Work. |
| 14 | Add GST 18% of above cost etc. Please Enable Macros to View BoQ information |