| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and crosssections, including disposal of surplus material with all lift and leadupto 1000 metre as per MoRT&H specification clause 301. In all type of soil |
| 2 | Dismantling of existing structures like culverts, bridges, retainingwalls, CC road and other structure comprising of masonry, cementconcrete, wood work, steel work, including T&P and scaffoldingwherever necessary, sorting the dismantled material, disposal ofunserviceable material and stacking the serviceable material with alllifts and lead of 50 metres as directed by Engineer. Lime Concrete, cement concrete grade M-10 (1:5:10) and below |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cementconcrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement cocrete grade M-15 and above and PCC block |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal siz |
| 5 | Providing and laying un-reinforced, plain cement concrete mix with Concrete Mixer & vibrator pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed as per approved mix design, laid, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints etc including all material, labour, machinery, lighting, guarding and maintenance of diversion. PCC M-25 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 8 | Neat cement punning |
| 9 | Cement plastering including T&P, scaffolding, material and completelabpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix :1:6 (1 cement : 6 fine/ coarse sand) |
| 10 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Hot rolled deformed bars |
| 11 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar M-20 Grade Concrete (1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) -As per design mix) |
| 12 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 13 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth upto 3km Please Enable Macros to View BoQ information |