|
| 1 | Attending leakage complaint/maintenance from TF to Appliance (Gas Stove) of PNG connection (GI installation) |
| 2 | Attending Gas Leakage complaint from TF to Appliance (Gas Stove) with all tools, tackles and consumbales. Scope includes checking of leakage at joints with Soap Solution/Gas Detector, attending leakage, painting touch up work, Prepration of report as per format provided by IOAGPL.Sufficient crew/Manpower shall be available at site and should attend the leakage within 30 minutes of complaint reporting time.Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe/fittings etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be bidder scope. Consumables shall include but not limited to GI powder coated clamps, Teflon Tape, \\"O\\" ring, etc. |
| 3 | MDPE damage recification/repair & maintenance work (upto 63 mm Dia) |
| 4 | Scope inculdes attending MDPE leakage complaint (Up to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor |
| 5 | MDPE damage recification/repair & maintenance work (above 63 mm Dia) |
| 6 | Scope inculdes attending MDPE leakage complaint (above to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor |
| 7 | MDPE Valve Chamber Cleaning, Maintenance, etc. |
| 8 | Scope include deployment of manpower with all Tools, Tackles, Machinery, etc. (i.e. Mud Motor, Generator, etc) for cleaning of MDPE Valve Chambers, prepration of report as per format provided by IOAGPL. Works shall be executed as per instruction and satisfaction of EIC/SIC. |
| 9 | Steel Valve Chamber Cleaning, Greasing, Painting, etc. |
| 10 | Scope include deployment of manpower with all Tools, Tackles, Machinery, Applying Grease, R95 Painting as per requirement, etc. (i.e. Mud Motor, Generator, etc) for cleaning of Steel Valve Chambers, prepration of report as per format provided by IOAGPL. Works shall be executed as per instruction and satisfaction of EIC/SIC. |
| 11 | Attending Service Regulator leakage complaint, Repair, Maintenance, etc. |
| 12 | Scope Include attending SR box leakage complaint, Reapair, Replacement, etc. within 30 min of complaint report time with all the tools, tackles and consumables, rectification of leakage, prepration of reprot as per format provided by IOAGPL. Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe, Fittings, Regulator, etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be contractor scope.Works shall be executed as per instruction and satisfaction of EIC/SIC. |
| 13 | Patrolling of Steel & MDPE Network |
| 14 | Scope Include: • To carry out emergency patrol, for the section / network vulnerable to damage due to sudden development of activities by other utilities.• To wear PPEs like safety shoes, cotton dress and reflective jacket• To carry out patrolling by driving the vehicle along the pipeline route, as per, as-built drawing, markers and valve chamber position, observing activities on pipeline as per check list, like excavation, construction, encroachment,• To coordinate and monitor with external agencies working on charged network of IOAGPL as per permissions issued on pipeline route.• To understand their work, extent of excavation and its potential hazard to underground gas pipeline• To explain them, about the gas pipeline network / route and precautions to be taken to prevent damage to gas pipelines.• To provide / update them with contact number and other details of IOAGPL authorised EIC for assistance.• To collect details of their supervisor like contact number, address etc for further coordination• To prepare report in standard format• Report immediately any unusual developments or occurrences along a pipeline route which may have some effect on the normal operation or maintenance of the pipeline |
| 15 | LPT of Network |
| 16 | LPT of MDPE Network (per KM) - Upstream of Service Regulator |
| 17 | LPT of LP Network (per SR/section) - Downstream of Service Regulator |
| 18 | LDT of Network |
| 19 | LDT of MDPE Network (per KM) - Upstream of Service Regulator |
| 20 | LDT of LP Network (per SR/section) - Downstream of Service Regulator |
| 21 | REPLACE, METER, GAS, DOMESTIC |
| 22 | Scope Include Dismantling of Existing Meter : Safe removal of existing domestic gas meter from customer premises, Isolation of gas supply prior to dismantling using appropriate valves.Installation of New Meter: Fixing of meter in proper position with required alignment and support.Leak testing of joints using soap solution / approved leak detection method.Functional testing of meter for proper operation.Ensuring no pressure drop or flow restriction post installation. Report preparation with Old meter reading and final reading, New meter initial reading, Meter serial numbers (old & new), in IOAGPL prescribed Format.Safe handling and return of dismantled meters to designated store/location. Proper tagging and documentation of removed meters. |
| 23 | LAY, PIPELINE, MDPE LP line Shifting Line text:LP line Shifting |
| 24 | Scope include MDPE pipeline laying in all kind of terrain in normal soil with all type of surface by open trench methodology of laying by maintaining minimum clear cover of minimum 1.5 m from the top of lowest datum available in the vicinity of the pipeline. |
| 25 | LAY, PIPELINE, MDPE MP line Shifting Line text:MP line Shifting |
| 26 | Scope Include MDPE pipeline laying in all kind of terrain in normal soil with all type of surface by open trench methodology of laying by maintaining minimum clear cover of minimum 1.5 m from the top of lowest datum available in the vicinity of the pipeline. |
| 27 | SUPPLY, INSTALL, ROUTE MARKER, PIPELINE RCC route marker installation |
| 28 | Scope Include Fabrication and installation of pipeline RCC route markers as per the scope of work, specification & PNGRB T4S along the route/ boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, application of approved color and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per scope of work, specification, PNGRB T4S and instructions of EIC/ SIC. |
| 29 | CHARGES, DISCONNECTION & RECONNECTION TD / PD |
| 30 | Scope include Disconnection & Re-connection of Domestic / Commercial customer as per instructions of IOAGPL EIC / SIC Please Enable Macros to View BoQ information |