| 1 | SECTION A SUPPY OF MANPOWER & ERV |
| 2 | Supply of PE Technician - MDPE work โ Damage repair, LPT, LDT etc.Third Party Damages & Emergency HandlingMDPE Valve operation & maintenanceAOMP Execution as per EIC instructionPost sales, customer complain, TD, PD etc. as per EIC |
| 3 | Supply of Plumber - GI work, repairing, reroutingDomestic complaints & Emergency handlingAOMP Execution as per EIC instructionPost sales, customer complain, TD, PD etc. as per EIC |
| 4 | Supply of skilled Technician - Cathodic Protection Readings / TRUDRS / MRS / I&C Skid preventive maintenance & complaintsMetering ComplaintsAOMP Execution as per EIC instructionPost sales, customer complain, TD, PD etc. as per EIC |
| 5 | Supply of labour |
| 6 | Emergency 4 wheeler vehicle operation:(Four wheeler 24 X 7 including Driver, fuel, insurance, RTO, PE PNG Tools and tackles as per the list, consumables and maintenance ) vehicle shall not be older than 2 years at the time of deploy. Vehicle should preferbly be a five seater Mahindra Bolero-Considering the monthly running of 3000 Km per month.Patroling to be carried out by ERV. |
| 7 | Extra KM |
| 8 | Management Fee/Contractor's Profit: Subjected to providing timely payment to Skilled manpower, Helper for O&M Services and pass on the same wages to workers as paid by IOAGPL.Vendor to submit monthly salary slip, Bank Statement to IOAGPLalong with monthly RA Bills. |
| 9 | Section-B SOR-Supply & Service |
| 10 | Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouping with concrete, clearing, supply and numbers, direction, change etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Engineer-in-Charge |
| 11 | Supply and installation of Route marker /KM as per drawing ( as per IOAGPL requirement / standard drawing) |
| 12 | Supply and installation of Warning markers with Post & foundations |
| 13 | Supply and installation of Warning Plate (Square/Rectangle) markers without Post & foundations |
| 14 | Supply and installation of RCC pipeline route marker |
| 15 | Dewatering pump of capacity 20KL |
| 16 | Hydra of lifting capacity 5MT |
| 17 | Hydra of lifting capacity 10MT |
| 18 | Crane of capacity 20MT |
| 19 | Crane of capacity 75MT |
| 20 | 15KVA DG set: |
| 21 | Sand Padding |
| 22 | Supply of Sand : Padding & bedding as per the requirements and approved procedure |
| 23 | Section C - MDPE line laying and other activities during rerouting, modification, post emergency site resotation |
| 24 | PE pipeline shifting and lowering including Installation of Electrofusion fitting if any |
| 25 | Installation of PE pipelineReceiving, handling, loading, transportation and unloading including owner supplied PE pipes and Electro fusion Fittings from owner's designated stock yards. Proper storing, stacking, identification, providing security, and insurance cover for the materials. Liasoning with Landowning agencies / statutory authorities, , temporary restoration of the abandoned trial pits as required (excavation to depth as per specification ) to original condition. barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / site- incharge. Trenching to the required depth in all types of terrain, uncoiling / stringing of pipes, damping, jointing of the pipe ends/ fittings/ valves by qualified personnel, using bar coded electro fusion techniques as per specification.Rates includes excavation as per tender specification and all contractor supplied material other than IOAGPL free issue material as mentioned in tender document in all types of terrain excuding rocky terrain. |
| 26 | Inst, Test, Com of 90 mm, 110mm & 125mm ODXSDR 17.6 |
| 27 | Inst, Test, Com of 32 mm & 63mm OD, SDR 11 & 17.6 |
| 28 | Inst, Test, Com of 20 mm ODXSDR 9 |
| 29 | Hook up of PE with DRS/CPRS/DPRC/IMS feeder |
| 30 | Hook up of PE with DRS/CPRS/DPRC/IMS feeder |
| 31 | Reinstatement of PE pipeline to its original condition & Supply & filling of fine sand for bedding & covering, supply & Installation of warning tape with complete restoration and water compaction |
| 32 | PE pipe per meter |
| 33 | PE Pipe Line Testing & Flushing including supply of N2 (Applicable if water enters intoPE Pipe Line Section due to Third Party Damage), Rock & RCC Breaking, Boring - Manually & HDD, Ins. Of EF Fittings |
| 34 | Flushing & Testing of PE Pipe Line - 32 MM to 63 MM |
| 35 | Flushing & Testing of PE Pipe Line - 90 MM to 160 MM |
| 36 | Excavation, Removal out of PE Pipeline |
| 37 | Rock Breaking |
| 38 | Breaking of PCC |
| 39 | Breaking of RCC |
| 40 | Construction of Valve Chamber all Sizes (MDPE) including materials |
| 41 | Providing, mixing and laying binding layer of PCC nominal mix |
| 42 | a) PCC 1:5:10 |
| 43 | b) PCC 1:3:6 |
| 44 | c) PCC 1: 4: 8 |
| 45 | Section-D SCOPE FOR USING OF 2 Wheeler |
| 46 | Using of 2 wheeler vehicle operation:(Two wheeler for 24 hours including fuel, insurance, RTO, consumables and maintenance ). Bike shall be operated by the team during emergency, as per EIC instruction and EIC shall be informed for the same. EIC shall certify the usage periodically |
| 47 | Section-E Incentive for Handling and control of emergency (pipeline damage, gas escape) during night (10 PM to 6 AM) (Specific incedent and GA head approval) |
| 48 | Emergency handling and control during third party damage of Steel, PE network and IOAGPL asset. |
| 49 | Incentive for Handling of emergency (pipeline damage, gas escape) during night (10 PM to 6 AM) Please Enable Macros to View BoQ information |