| 1 | Repair & maintenance of 400mm NB ash slurry pipelines & 500mm NB AWRS pipeline from Barrier gate of Plant to Morcha Nala, Belvadah. | Repair & maintenance of 400mm NB ash slurry pipelines & 500mm NB AWRS pipeline from Barrier gate of Plant to Morcha Nala, Belvadah. |
| 2 | Gas cutting of ash pipe /AWRS Pipe/clamp/collar etc. | Gas cutting of ash pipe /AWRS Pipe/clamp/collar etc. |
| 3 | Attending leakage/ maintenance of disposal line by replacing/refitting sleeve coupling and rubber gaskets. | Attending leakage/ maintenance of disposal line by replacing/refitting sleeve coupling and rubber gaskets. |
| 4 | Fabrication and erection of new steel structure / support / platform using M.S. angle / channel / plates / tubes or any type of steel section. | Fabrication and erection of new steel structure / support / platform using M.S. angle / channel / plates / tubes or any type of steel section. |
| 5 | Fabrication of 400mm NB/500NB M.S. Bend of required angle. | Fabrication of 400mm NB/500NB M.S. Bend of required angle. |
| 6 | Replacement/refitting and alignment of 400 mm NB/500mm NB bend, installed in ash slurry pipelines/AWRS pipeline. | Replacement/refitting and alignment of 400 mm NB/500mm NB bend, installed in ash slurry pipelines/AWRS pipeline. |
| 7 | Providing generator for maintenance work of pipelines. | Providing generator for maintenance work of pipelines. |
| 8 | Repairing of worn out and damaged 400 mm NB flange/ sleeve coupling by cutting, welding, and grinding/ machining. | Repairing of worn out and damaged 400 mm NB flange/ sleeve coupling by cutting, welding, and grinding/ machining. |
| 9 | Removal of choking of ash slurry disposal pipelines. | Removal of choking of ash slurry disposal pipelines. |
| 10 | Digging of earth/ash deposited on ash slurry pipeline and adjoining area due to leakage/bursting of ash disposal pipeline. | Digging of earth/ash deposited on ash slurry pipeline and adjoining area due to leakage/bursting of ash disposal pipeline. |
| 11 | Removal/Uprooting of grass, wild bushes, and plant around and in between the gap of pipelines. | Removal/Uprooting of grass, wild bushes, and plant around and in between the gap of pipelines. |
| 12 | Marking and turning of 400 NB ash slurry disposal Pipeline. | Marking and turning of 400 NB ash slurry disposal Pipeline. |
| 13 | Dismantling of existing 400 NB ash slurry disposal pipeline. | Dismantling of existing 400 NB ash slurry disposal pipeline. |
| 14 | Erection/placement of 400 NB ash slurry disposal pipeline. | Erection/placement of 400 NB ash slurry disposal pipeline. |
| 15 | Providing hydra for maintenance work of pipelines. | Providing hydra for maintenance work of pipelines. |
| 16 | Providing half stiffener over 400 NB MS pipe | Providing half stiffener over 400 NB MS pipe |
| 17 | Hiring of JCB on hourly basis | Hiring of JCB on hourly basis |
| 18 | Hiring of Tractor with hydraulic trolly | Hiring of Tractor with hydraulic trolly |