| 1 | Waterproofing membrane: Providing and appying water proofing treatment using primer coat of SS Con Guard followed by 2 coats of SS Flex Proof PU One component Elastomeric sandwiched with fiber reinforced mat in between the coats, Ready to use Membrane Forming Polyurethane waterproof coating,All the works to be carried out as per manufacturers specification/recommended method and a sdireced by design architect/CMC with suitable air curing to be done before proceeding with protective screed and plaster for slab and walls respectively |
| 2 | Supply and Inject Eco friendly, solvent free, CFC, VOC, Halogens and also Phthalate-free, Mountain Grout Soil Stabilizer/Gelfoam/Flexible/Ultra is a very low viscosity hydrophobic polyurethane formulation designed for stabilization and waterproofing loose, granular soils. The product reacts with moisture in the soils, fills small voids and binds the soil particles to create a strong solid mass. The physical properties of the composite are a function of the soil type, degree of saturation, compaction, and moisture content to fill the cavities and stop water till the firm rejection from the packers as directed by Engineer-In-Charge- OR Supply of super flex soil stabilizer polyurethane mountain grout to the work spot including transportationand storing with contractors’ materials, manpower etc with all lead &lifts and as directed by Engineer-In-Charge |
| 3 | Supply and fix injection packers in the cracks/junction of tiles after carefully drilling in the junctions with special drilling machine to fill the cracks on slope |
| 4 | Application of Epoxy putty |
| 5 | Supplying and sealing the window joints after carefully removing and opening the joints of cement and seal it carefully with transparent P U sealant |
| 6 | Dismantling of the Tiles, Mortar, and Laterite Soling with proper breaking machinery and Skilled labour for a 25m Height Dome structure with Skilled labour to ensure safe and efficient removal, adhering to proper safety protocols due to the height and Carefully breaking and removing existing tiles from the dome surface. Also removing the mortar bedding and any adhesive materials used for the existing tiles, and safely handling debris at a height with Harnessing, scaffolding, safety nets, and other safety gear required for completion of the work with perfection. |
| 7 | Expansion Joint treatment : - Removal of old material from the existing joint to ensure a clean, smooth surface for Carefully removal of old expansion joint materials and debris. and Inserting PU Rod (Polyurethane Rod) of the correct size to maintain joint depth and provide expansion-contraction facility. After that using PU Packing material for packing it with the PU rod ensuring flexibility and durability. and Sealing it with Fast Plug Cement Mortar to Seal the joint for making it stronger, watertight, and protected.- This process Allows structures to expand and contract with temperature changes.- This process Provides seismic protection and flexibility during earthquakes.- This process Handle different loads and stresses.- This process Enhances the structure durability and lifespan by preventing cracks and damage. - This process ensures structures remain safe, durable, and functional under various conditions. |
| 8 | Supplying laying Glass Mosaic Tiles on a 25m Height Dome:- Supplying and fixing glass mosaic tiles on the dome surface at a height of 25 meters, involving:- safety arrangements for height work.- Surface preparation (ensuring clean, even substrate).Applying adhesive (like epoxy-based) suitable for glass tiles. Fixing glass mosaic tiles with proper alignment and spacing. Grouting with appropriate material (often epoxy-based grout for glass |
| 9 | FALSE CEILING:-;Providing & fixing False Ceiling Yashashri make or equivalent made out of 2†x 1†M.S sq tube frame support structure & 20mm x 155mm x 1.2mm multi-cavity upvc section 30mm x 40mm x 2mm Upvc multi-cavity section with hidden screwing system. The average weight of False Ceiling is 8.50 kg per sq mtr. These Upvc sections are tested by using BS 2782 & DIN 53459 test methods. |
| 10 | Applying one coat of distemper primer of approved brand and manufacture on wall surface. |
| 11 | Wall painting (one or more coats) with plastic emulsion paint of approved brand and manufacture on old work to give an even shade. |
| 12 | Metallic scaffolding for a required height of typically refers to a temporary structure made of metal tubes and fittings, designed to support workers and materials during construction, maintenance and repair work . The scaffolding is likely to be a 'tube and coupler' or 'system scaffolding' type, which is commonly used for high-rise structures. consists of vertical standards (uprights), horizontal ledgers, transoms, and diagonal bracings, all connected using couplers or fittings. The scaffolding is made of metal, usually steel or aluminum, which provides strength, durability, and resistance to corrosion. The scaffolding is designed to reach a required height of which requires careful planning, engineering, and erection to ensure stability and safety. Safety features: The scaffolding will likely include safety features such as guardrails, toe boards, and access ladders or stairs to prevent falls and ensure safe working conditions. |
| 13 | Supplying applying silica sand above PU Coated surface on the sloping roof of dome for better mechanical key action before tiling |
| 14 | Supplying and Applying Crystaline coating on external wall by 2K crystalline |
| 15 | Steel work in built up tubular (round square or rectangular hollow tubes etc.) (Square Hollow Section (SHS) IS4923 /Rectangular Hollow Section (RHS) IS4923/ Circular Hollow Section (CHS) IS1161 closed Structural Steel of (SAIL TATA. VIZAG JSW APOLLO Steel Ltd.) make (Min Yeild Stress 310 Mpa)) trusses etc. including cutting hoisting fixing in position and applying a priming coat of approved steel primer including welding and bolted with special shaped washers etc. complete. |
| 16 | Applying priming coat with ready mixed primer of approved brand and manufacture on steel work. |
| 17 | Painting two or more coats (excluding priming coat) with superior quality ready mixed paint for steel work of approved brand & manufacture in all shades on new work to give an even shade. |
| 18 | Design supply & installation of suspended Spider Glazing system (Frameless glass structural glazing) designed to withstand the wind pressure as pr IS 875 (Part-III). The Suspended System held with Spider Fittings of SS-316 Grade Steel of approved manufacturer with glass panel having 12 mm thick clear toughened glass held together with SS- 316 Grade Stainless steel Spider & bolt assembly with laminated glass fins 21mm thick. The Glass fins and glass panel assembly shall be connected to Slab/beams by means of SS- 316 Grade stainless steel brackets & Anchor bolts and at the bottom using SS channel of 50x25x2mm using fastener & anchor bolts non staining weather sealants of approved make Teflon/ nylon bushes and separators to prevent bi-metallic contacts all complete to perform as per specification and approved drawings. The complete system to be designed to accommodate thermal expansion & seismic movements etc Please Enable Macros to View BoQ information |