| 1 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI NO. 692 |
| 2 | deduction of brick bats |
| 3 | deduction of old brick |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M. and lead upto 30 M. and including filling watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches.(SOR UP PWD SI - 251A) |
| 5 | Disposal of west malba from site upto 5.0km i/c all complete of work ANALYSIS RATE |
| 6 | Cement Concrete in proportion of 8:4:1 with 4cm guage approved stone ballast, Coarse sand & cement in the materials, labour Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 281) |
| 7 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5;3 in lintels of door & windows excluding supply of reinforcement and its bending,but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.slabs In 1:1.5:3. SI NO 284A |
| 8 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work Including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire,SI NO. 504/AR |
| 9 | M.S. or iron work @50 KG/ Sqm |
| 10 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts,spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. DSR NO.16.78 |
| 11 | Cement concrete with 2cmgauge approved stone grit, coarse sand& cement in proportion of 1:1.50:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture / Plantofnot less then 0.2cum capacity & appropriate weight batcher using approvedmix design, laid Inapproved fixed formwork (steel) channel) layingand fixingof 125micron thick polythene film, wedges, steel plates including leveling the formwork spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including has sioncloth for curringof concrete pavements for not less then 14days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plantsetc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc .SOR SI NO. CH.20 NEW ITEM NO.9 |
| 12 | Painting or varnishing work in small areas or new wood work with one coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used ISI marked.641+642 |
| 13 | supply & fixing of inograition 1*1 stone with all complet… |
| 14 | Add 18%GST Please Enable Macros to View BoQ information |