| 1 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge with in a distance of 60 meter (200 feet). |
| 2 | (a) Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move ) |
| 3 | Extra rate for earth work exucted under water & liqued mud |
| 4 | Disposal of waste malba from site upto 5.0 km i/c all comp of work |
| 5 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 6 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 7 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. |
| 8 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. |
| 9 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work |
| 10 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. |
| 11 | M.S.or iron work of small sizes and section such as holding down bolts, hold fast, tierods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work. |
| 12 | Deduction cost of old brick |
| 13 | Deduction cost of old brick bat |
| 14 | Painting roofs or other iron work in large areas with one coat priming and one coat of approved (above one Sq. Metre) paint (British antesol or equivalent) including supply of all materials, labour, Tools&plants etc. required for proper completion of the work. Paint to be used ISIMarked. |
| 15 | Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. |
| 16 | Add 18%GST Please Enable Macros to View BoQ information |