| 1 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI NO. 692 |
| 2 | deduction of brick bats |
| 3 | deduction of old brick |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches.(SOR UP PWD SI - 251A) |
| 5 | Cemant concrete with 4cm Gauge stone Ballast Fine sand of 1.25 FM and cemant in Proportion of 12:6:1 in Founfation including supply of all matrial labour and tools and plant for proper complition of work (S.I.No. 273) |
| 6 | M-150 class brick work in 1:4 cement and fine sand mortar in all complete(S.I. No. 305) |
| 7 | 12MM Thickb 1:4 cement finesand & mortar SI NO. 584 |
| 8 | Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work SI NO. 279A |
| 9 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5;3 in lintels of door & windows excluding supply of reinforcement and its bending,but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.slabs in 1:1.5:3. SI NO 284A |
| 10 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.SI NO. 504/AR |
| 11 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from Including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work. Same as in Item 502 above but in M.S. Grills / Stair case railing / gates/ trusher / racks etc. (SOR UP PWD SI - 279A) for fabriction jali lum sum @50 KG/ Sqm |
| 12 | MAKING OF BANDHA IN DRAIN BY FILLING SAND GUNNY BAGS |
| 13 | DEWATERING OF SLUDGE WATERING BY DIESEL PUMP SET, 8HRS IN DAY |
| 14 | DISPOSAL OF MALBA |
| 15 | SITE OF CLEARANCE |
| 16 | supply and laying of gsb 22.5 to 53 mm stone / GSB STONE including labour t&p etc AR. |
| 17 | Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.50:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete ....mixture /Plant of not less then 0.2 cum capacity & appropriate material etcl & concrete etc. SI NO. CH20 NEW ITEM NO. 09 |
| 18 | Painting or varnishing work in small areas or new wood work with one coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used ISI marked.641+642 |
| 19 | Finishing wall with one coat of water proof cement paint of approved quality on previously old treated surface with this paint to give an even shade including supply of all materials, labour,Tools& plant etc. required for proper completion of the work.Same aas item 660 but for weather coat.SOR NO- 662 |
| 20 | Add 18%GST Please Enable Macros to View BoQ information |