| 1 | Cleaning Jungle including up rooting of rank. Vegetation grass, push, wood trees and sampling of grith upto 30 cms measured at a Height of 1 M Above ground level and Removal of Rubbish up to a Distance of 50M. Out side the Periphery of Area Cleared. |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm |
| 4 | Earth work in excavation by Mecanical means ( Hydraulic Excavator ) Manual means over Areas Exclooding 30cm in Depth , 1.5m in With as well as 10 Sqm on Plan including getting out and disposal of Excavated earth load upto 50 m and Lift upto 1.5m as direction by engineer in Charge . The Contractor has defect different utilities like Sever line, water supply line, electric cable , Telephone Cable , Gas Pipe line Etc. using Utility Detecting Machine Before Start of Excavation and Shall atart Excavated only After Getting Permission on E/I. |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-III) : 8 graded stoneaggregate 20 mm nominal size) |
| 7 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically treated bars of Grade Fe-500D or More |
| 11 | Earth work in Embankment in Ordinary soil Embankment to be in 20cm layers including ramming Dressing the Surface to requiredlevels with Half tonne steel or Wooden rammer and Rolling Every third and top most layers in Roller 8 to 10 tonne Capacity and Including 1.50 mtr Lift and all lead ( earth shall be Brought From a place which including Cartage to Earth by Mecanical transport and T & P labour Etc, Required for Proper Complition Earth shall br Arranged by the Contractor at his Own Cost. |
| 12 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 |
| 13 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 10.0 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 14 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 15 | 12 mm cement plaster :1:4 (1 cement : 4 coarse sand) |
| 16 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone.Red sand stone |
| 17 | Painting or Varnishing with Valsper or other Approved High Grade enamel or Super par synthetic clean varnish Complete one Coat over previously painted surface including supply of all material,labour,Tools & plants etc. required for proper Completion of the work. paint to be used should Confirm ISI no.105/106/133-1950 . As in Item (647) above but for Every Subsequent Coat on previously treated Surface. (937.00+24.00=61.00 per Sqm) |
| 18 | Providing wall putty on Old Surface with Approved Quality Material of Berger/ J.K / Birla or Similar Make 2 Coats. |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand andmanufacture |
| 20 | Neat cement punning |
| 21 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 22 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 23 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 24 | Providing and placing in position 100 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 100 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edgeswith MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |