| 1 | Disconnecting all electric / water supply connection from the monoblock / cenrtifugal pump set electric driven AC 3 phase, 415 Volts, transporting to workshop dismantling, removing the burnt out windings, cleaning the starter slots and rewinding with super enamelled copper wire of suitable gauge, insulating, proper heat varnishing, re-transportation and re-installation at same position including commissioning and testing complete for the following capacity :- |
| 2 | Motor of capacity 2HP/3HP. |
| 3 | Motor of capacity 5/7.5 HP |
| 4 | Motor of capacity 10 HP |
| 5 | Motor of capacity 15 HP |
| 6 | Motor of capacity 60/75 HP |
| 7 | Motor of capacity 90/100 HP |
| 8 | Supply asnd fix as in replacement bearing for AC 3 phase 415 Volts induction motor / monoblock pump set of the following capacities, as directed by the Engineer-in-Charge :- Make : Make shall be provided as per existing one |
| 9 | Ball Bearing for motor of capacity 2HP/3HP. |
| 10 | Ball bearing for motor of capacity 5/7.5 HP |
| 11 | Ball Bearing for motor of capacity 10 HP |
| 12 | Ball Bearing for motor of capacity 15 HP |
| 13 | Ball Bearing for motor of capacity 60/75 HP |
| 14 | Ball Bearing for motor of capacity 90/100 HP |
| 15 | Roller Bearing for motor of capacity 90/100 HP. |
| 16 | Dismantling and taking out of the following capacity pump sets of any type (monoblock/centrifugal) complete of any make from any installation , transporting to workshop and re-installation in same position after replacement of worn out spare parts and painting with one coat of synthetic enamell paint to pump only including commissioning and testing on completion all as directed by the Engr-in-Charge. Note : Spares parts will be measured and paid separately under relevent item |
| 17 | Motor of capacity 2HP/3HP. |
| 18 | Motor of capacity 5/7.5 HP |
| 19 | Motor of capacity 10 HP |
| 20 | Motor of capacity 15 HP |
| 21 | Motor of capacity 60/72 HP |
| 22 | Motor of capacity 90/100 HP |
| 23 | Disconnecting of all electric connection, taking out 3 phase, 415 Volts induction electric motor from any installation of any make (other than, as catered under Item No. 1 & 3 here-in-before), transporting to workshop, dismantling, overhauling with proper heat varnishing, (for proper insulation), re-metalling, machine polishing of rotor shaft, terminal box and applying one coat synthetic enanel paint, transporting back to work-site for reinstallation of the same including testing complete for the following capacities :- |
| 24 | Motor of capacity 2HP/3HP. |
| 25 | Motor of capacity 5/7.5 HP |
| 26 | Motor of capacity 10 HP |
| 27 | Motor of capacity 15 HP |
| 28 | Motor of capacity 60/72 HP |
| 29 | Motor of capacity 90/100 HP |
| 30 | Taking out exisiting open well submersible pumping sets, of capacity 1/1.5 HP, Single phase dismantling the pump sets from motor and removing all burnt/worn out coils cleaning the slots and rewinding with super enamelled copper wire of existing size including varnishing two coats, drying and reassembling the electric motor re-transporting, re-installation and testing complete all as specified and as directed by Engr in Charge. |
| 31 | All as per Item No.05 here-in-before but of capacity 2.0/3.0 HP & 01 Phase . |
| 32 | All as per Item No.05 here-in-before but of capacity 5.0 /7.5 HP, Three phase. |
| 33 | All as per Item No.05 here-in-before but of capacity 10.0 / 12.5 HP, Three phase. |
| 34 | Supply and fix stainless steel filter net suitable for 5.0 HP/ 10.0 HP submersible pump complete all as directed by Engineer-In-Charge. |
| 35 | Supply only cast iron impeller, suitable for 2/3 HP capacity monoblock pump as directed by the Engineer-in-Charge. |
| 36 | All as item serial No 10 but suitable for 5.0/7.5 HP |
| 37 | All as item serial No 10 but suitable for 10HP |
| 38 | All as item serial No 10 but suitable upto 15 HP |
| 39 | All as item serial No 10 but suitable upto 90-100 HP |
| 40 | Re-metaling, grinding and re polishing of damaged CI impeller cover of pump capacity 5 HP to 15 HP monoblock pump complete as directed by Eng-in-charge. |
| 41 | Re-metalling, grinding and re polishing of damage CI impeller of pump capacity 90 / 100 HP, completed as directed by the Engineer-in-Charge. |
| 42 | Supply and fix as in repair gun metal gland bush including graphite gland packing for induction / monoblock pump set of capacity 5 HP to 15 HP, complete all as directed. |
| 43 | Supply and fix as in repair gun metal gland bush including graphite gland packing for induction / monoblock pump set of capacity 90/100 HP, as in replacement complete all as directed. |
| 44 | Supply and fix as in repair MS studs with nut as per exsiting size & shape of size 1/4\\" to 5/8\\" as directed by Engineer-In-Charge. |
| 45 | Supply and fix as in repair Impeller key suitable for any type of pump , complete all as directed by Engineer-In-Charge |
| 46 | Supply and fix as in repair Check nut (suitable for any type of pump), complete all as directed by Engineer-In-Charge |
| 47 | Cutting and removing of old unserviceable nut bolt and washer of size 3/8\\" to 5/8\\" from the pump set and base frame and Supply and fix as in repair MS nut bolt and washer of same size fixed in same position, complete as directed by the Engineer-in-Charge. |
| 48 | Re-metalling and re-shaping of impeller key slot, for pumps complete as directed by the Engineer-in-Charge. |
| 49 | Removing the existing foot valve/check valve of any type carefully by disconnecting water supply pipes of size 40mm to 80mm dia and opening, cleaning including replacement of new gasket (Flap) bolt, nut, washers of suitable size and refixing the same after repairs complete as directed by the Engineer-in-Charge. |
| 50 | All as per item Ser No 24 here in before but of pipe size 100 mm to 200 mm. |
| 51 | Material and labour Checking and balancing of old shaft for monoblock / centrifugal pump of any capacity / type including re-metalling and polishing, and re fixing complete as directed by the Engineer-in-Charge. |
| 52 | Material and labour Framed Work such as brackets of angles or tees with web and flanges cut to shape, drilled and countersunk for screw, including bending and welding angles as necessary, gusset plates, riveting, etc. conforming to Fe-290, Gde-E-165, complete all as specified and as directed. |
| 53 | Demolition Cement Concrete (un-reinforced) in Ground Floors and Pavings not exc. 150mm thickness (above or below Ground Level), complete all as directed by Engineer-In-Charge |
| 54 | Material and labour Plain Cement Concrete type B1 (1:2:4) using 20 mm stone aggregate as in Foundation of monoblock pump/centrifugal pump, Filling and Mass Concrete, complete all as specified |
| 55 | Material and labour Greasing for bearing (of centrifugal pumps / Monoblock pumps) of 2 to 7.5HP pump sets any make complete all as directed by Engr-in-Charge. |
| 56 | Material and labour Greasing for bearing (of centrifugal pumps / Monoblock pumps) of 10 to 15 HP pump sets complete all as directed by Engr-in-Charge. |
| 57 | All as per item No 31 for 60 to 100 HP centrifugal pump set. |
| 58 | Disconnecting of all electric / water supply connection from the panel/water line, taking out submersible pump set including column pipe (motor and pump) of 15/20.0 HP capacity by using tripod & chain pully from site and transporting to workshop, dismantling the pump part by part, after stripping off the pump and motor, segregating the unserviceable and serviceable parts, cleaning, slot cutting, re-metalling and machine polishing of outer cover, threading of all parts as required, re-assembling including replacement of worn out spares and painting with one coat of synthetic enamel paint, re-transporting to work-site lowering the pump set including column pipe and re-connection of electrical and mechanical joint, testing of pump set at Malse Dam complete all as directed by Engr- in- Charge.Note : Column pipe, New spares, nuts, bolts, gasket & painting of column pipes shall be measured and paid separately |
| 59 | Supply and fix as in repair Motor cooling fan suitable for 5 HP to 10 HP induction motor as in repair complete all as directed by Engineer-In-Charge |
| 60 | All as per item No 34 but for 15 to 40 HP induction motor. |
| 61 | All as per item No 34 but for 60 to 100 HP induction motor. |
| 62 | Material and labour for rewinding of submersible motor of capacity 15/ 20 HP of any make and any type with super enamelled copper wire of suitable gauge, insulated and including re-assembling the motor, jointing with insulated materials etc,. including testing complete all as directed by Engr-in-Charge. |
| 63 | Supply and fix as in repair PVC insulated flat industrial copper cable, of cross-sectional area 10 sq mm x 3 core, suitable for submersible pump, including necessary incoming and outgoing electric connections, copper lugs, water proofing compound etc., connected to starter / motor as in repair complete all as directed by Engineer-In-Charge |
| 64 | Supply and fix as in replacement MCCB, adjustable type thermal magnetic release type,4 poles, 415 Volts, Adjustable overload setting 0.8-1.0 x in and adjustable short circuit setting 5-10 x in, Lcu = 36 KA breaking capacity, rating 400 Amps including all fixing accessories with both ends spreader links |
| 65 | Supply and fix as in replacement MCCB, adjustable type thermal magnetic release type,4 poles, 415 Volts, Adjustable overload setting 0.8-1.0 x in and adjustable short circuit setting 5-10 x in, Lcu = 36 KA breaking capacity, rating 250 Amps including all fixing accessories with both ends spreader links |
| 66 | Supply and fix as in replacement MCCB, adjustable type thermal magnetic release type,4 poles, 415 Volts, Adjustable overload setting 0.8-1.0 x in and adjustable short circuit setting 5-10 x in, Lcu = 36 KA breaking capacity, rating 200 Amps including all fixing accessories with both ends spreader links |
| 67 | Supply and fix Fe-410-W(Gde E-250 qualityA Plates (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes, without any attachment complete all as specified. |
| 68 | Taking down Non return valve assembly size 100mm to 150mm by opening the nut, bolts and washers, cleaning the valve replace with new rubber gasket, balls and refix the same after completion, complete all as directed by Engineer-in-Charge. |
| 69 | Supply and fix as in repair Mild steel bore well cap for 8\\" x 12\\" tube well in two parts 10mm thick with cable/column pipe entry system and locking arrangements and welding work as in repair complete all as directed by Engineer-In-Charge |
| 70 | Supply and fix as in repair MS nut and bolt with MS washer of any size for jointing of MS column pipes / pump mounting bolts / valves etc. as in repair , complete all as directed by Engineer-In-Charge |
| 71 | Supply and fix as in repair MS star/round coupling with star rubber bush / Rubber round coupling with MS plate incl necessary nut, bolt & washers complete of centrifugal pumps 5 HP to 15 HP capacity complete all as directed by Engineer-In-Charge |
| 72 | Welding work in exc 6mm but n. exc 9mm running pipe line / MS frame in any length and thickness not exceeding 9 mm in any position complete all as directed by Engr-in-Charge. |
| 73 | Supply and fix as in repair Fully automatic star delta starter in Sheet-Steel Enclosure Type MN 16 F FASD (Motor Rating AC-3 Duty, 415V, 50Hz, 3Ph) incl necessary incoming & outgoing elect connections, copper lugs, etc., as directed. |
| 74 | Supply and fix as in repair DOL starter single phase in sheet steel enclosure MF G1 for motor rating of 1.0/2.0 HP, 6.5 to 20 Amps with Voltmeter and ammeter including all necessary electric connections and fixing arrangement as per site requirement all as directed by Engr-in-charge. |
| 75 | Supply and fix as in repair DOL starter three phase in sheet steel enclosure MUG6 for motor rating of 5.0 HP, 6.0 to 10.0 Amps with Voltmeter and ammeter including all necessary electric connections and fixing arrangement as per site requirement all as directed by Engr-in-charge. |
| 76 | Supply and fix as in repair star delta starter fully automatic in sheetmetal enclosure type MN with SPP features suitable for operation of pumping set connected with induction motor 50 to 75 HP capacity three phase 415 Volts 50 Hz AC supply all as directed by Engr-in-charge. |
| 77 | Supply and fix as in repair star delta starter fully automatic in sheetmetal enclosure type MN with SPP features suitable for operation of pumping set connected with induction motor 90 to 120 HP capacity three phase 415 Volts 50 Hz AC supply all as directed by Engr-in-charge. |
| 78 | Supply and fix as in repair star delta starter fully automatic in sheetmetal enclosure type MN with SPP features suitable for operation of pumping set connected with induction motor 10 to 20 HP capacity three phase 415 Volts 50 Hz AC supply all as directed by Engr-in-charge. |
| 79 | Supply and fix as in repair Push button Actuator switch of any colour including necssary connections complete all as directed by Engineer-In-Charge |
| 80 | Supply and fix as in repair Indication lamp set LED type complete all as directed by Engineer-In-Charge |
| 81 | Supply and fix as in repair in Repairs selector actuator - 03 position complete all as specified nd as directed by Engr-in-Charge.Make: As per existing one |
| 82 | Supply and fix as in repair ML bi-metal overload relays, ranging from 10 Amp to 16 Amp, including necessary incoming and outgoing elect connections, copper lugs, etc., as in repair complete all as directed by Engineer-In-ChargeMake : L&T/ Siemens/ Schneider/ ABB. |
| 83 | Supply and fix as in repair MN (MN 05)overload relays, ranging from 66 Amp to 110 Amp, including necessary incoming and outgoing elect connections, copper lugs, etc., as in repair complete all as directed by Engineer-In-ChargeMake : L&T/ Siemens/ Schneider/ ABB. |
| 84 | Supply and fix as in repair ML bi-metal overload relays, ranging from 20 Amp to 32 Amp, including necessary incoming and outgoing elect connections, copper lugs, etc., as in repair complete all as directed by Engineer-In-ChargeMake : L&T/ Siemens/ Schneider/ ABB. |
| 85 | Supply and fix as in repair AC electronicl timer ST 100 3 phase electronic timer ranging from 3 - 30 sec including necessary incoming and outgoing elect connections, copper lugs, etc., as in repair complete all as directed by Engineer-In-Charge |
| 86 | Material and labour Painting to existing cast iron / mild steel (Inlet, Outlet, Wash out, Over flow) pipe lines of any size fixed with pump house building, or fixed to wall / floor of overhead tank (approx 7.5 m to 22 m height) including motor starter panel board with one coat of synthetic enamel paint (as per standard colour code), complete all as directed by Engineer-In-Charge |
| 87 | Taking down suction pipe of 80 mm with defective GM foot valve of 80mm for replacement of the foot valve(ISI) marked including necessary including cutting threading of GI pipe and lowering in the sump complete all as specified and directed by Engineer-in-Charge. |
| 88 | Taking down suction pipe of 40mm with defective GM foot valve of 40mm for replacement of the foot valve(ISI) marked including necessary including cutting threading of GI pipe and lowering in the sump complete all as specified and directed by Engineer-in-Charge. |
| 89 | Supply and fix as in repair PVC insulated single core solid copper conductor of cross sectional area 50.0 sq mm for inter-connection as in repair complete all as directed by the Engr-in-Charge. Make:KEI/Finolex/Havells/Nicco/RR Cable |
| 90 | Ditto all as per item No:64 but of cable size 10 Sqmm. |
| 91 | Ditto all as per item No:64 but of cable size 6 Sqmm. |
| 92 | Ditto all as per item No:64 but of cable size 2.5 Sqmm. |
| 93 | Supply and fix as in repair Add on block 1NO + 1NC including necessary electric connections complete all as directed by the Engr-in-Charge. |
| 94 | Supply and fix as in repair Add on block 2 NO + 2 NC complete all as directed by the Engr-in-Charge. |
| 95 | Supply and fix as in repair Single phase preventor (auto re-set, 40 Volts unbalance), as in repair complete all as directed by the Engr-in-Charge. |
| 96 | Material and labour Stripping off existing starter panel and replace of single phase preventor matching with motor of type VSP-3 and re-assembling of the panel including rectification of fault and safety device, adjustment of time etc complete as directed by the Engr-in-Charge. Please Enable Macros to View BoQ information |
| 97 | Material and labour Stripping off existing starter panel and replace of single phase preventor matching with motor of type VSP-3 and re-assembling of the panel including rectification of fault and safety device, adjustment of time etc complete as directed by the Engr-in-Charge. Please Enable Macros to View BoQ information |