| 1 | . Earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, walls, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth 1 mtr from cutting edge. All kinds of soil. |
| 2 | Providing and laying of dry-stone soling hand packed tightly including cost of stones, carriage of materials from source to site of work, head loads if any involved all complete. (50–200mm nallah boulders) |
| 3 | Providing and laying in position Cement Concrete of specified grade including cost of required centring, shuttering, carriages of materials from source upto site of work, head loads if involved all complete. Cement Concrete 1:4:8 mix with 40mm nominal aggregate. |
| 4 | . Providing laying in position cement concrete of specified grade including curing but excluding the cost of centering shuttering all work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 5 | Providing laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). |
| 6 | . Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 up to plinth level and curing complete with cement mortar 1:6 (1 Cement : 6 coarse Sand) including carriage of materials from source upto site of work, head loads if any involved all complete. Nallah stones. |
| 7 | Dry random rubble masonry with hard stone in foundation and plinth nallah stone. |
| 8 | Supply & Filling of Sand/earth in E.C bags, sewing of bags after filling, placing the earth/sand filled bags in position including cost of E.C. bags, earth/sand, all carriages by Mechanical Transport and Headloads whatsoever involved complete job. |
| 9 | Hire Charges of Hydraulic Excavator Tyre Mounted (JCB) including P.O.L and operator complete. |
| 10 | Supply Unskilled Labourers (Mazdoors, Bhishti, Helper and the like). |
| 11 | . Supply and Laying of HDPE Pipes at Site including all carriages by Mechanical Transport whatsoever involved complete. 200mm Dia. |
| 12 | Supply and Laying of HDPE Pipes at Site including all carriages by Mechanical Transport whatsoever involved complete. 150mm Dia. |
| 13 | Centering and shuttering including strutting, propping etc and removal of form work for foundation footing base for columns. |
| 14 | Supplying and filling of stone into wire crates including cost and carriages of stone wire crates by HT/HL etc complete job. |
| 15 | Laying and fitting of 250 mm dia MS pipe by flanges 16 mm thick including cost of MS flanges, nuts bolts, rubber insulator and all carriage of material upto site of work by mechanical means whatsoever involved including cost of welding charges, carriages of welding plate to the site etc complete job. |
| 16 | Carriage of sand / aggregate average lead 10 kms. |
| 17 | Carriage of stone average lead 10 kms. Please Enable Macros to View BoQ information |