|
| 1 | Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge. |
| 2 | Dismantling Wash Basins of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge. |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in harge: 1:4:8 or leaner mix (i/c equivalent design mix |
| 4 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar |
| 5 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm |
| 6 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead Of area beyond 3 sqm. |
| 7 | Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviceable materials within 50 meters lead. |
| 8 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge : 15 mm to 40 mm nominal bore |
| 9 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. |
| 10 | Dismantling aluminum / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable surplus material and stacking of serviceable material within 50 meters lead as directed by Engineer-in-charge. |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 12 | Half brick masonry with common burnt clay (non-modular) bricks of class designation7.5 above plinth including curing upto floor V Level in Cement mortar 1:4 ( 1 cement : 4 coarse sand) |
| 13 | 15mm Cement plaster on the rough side of single or half brick wall of mix: ( 1 cement : 4 coarse sand) |
| 14 | Providing and laying vetrified tiles in floor (thickness not less than 10 mm), of approved make, in all colours, shades of any size not less than 600 mm X 1200 mm as approved by Engineer- in-Charge, in floor and steps over 20 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing with epoxy grout mixed with pigment of matching shade complete along with spacers. Basic rate of tile shall not be less than Rs. 80 per sft. |
| 15 | Providing and fixing Ist quality ceramic glazed wall tiles (thickness not less than 10 mm), of approved make, in all colours, shades of any size not less than 600 mm X 1200 mm as approved by Engineer- in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing with epoxy grout mixed with pigment of matching shade complete along with spacers. Basic rate of tile shall not be less than Rs. 80 per sft. |
| 16 | Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS:277 and consisting of angle cleats of size 25 mm widex1.6mm thick with flanges of 27mm and 37 mm, at 1200 mm centre to all as per manufacturers’ specification and also including the cost of making openings for light fittings, grills diffusers, cutouts made with frame of perimeter channels suitably fixed all complete as per drawing and specification and direcentre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x40mm long with 6 mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.5mm of required length with nuts & bolts of required size and other end of angle hanger fixed with G.I. channels 45x15x0.9 mm running at the spacing of 1200 centre to centre, to which the ceiling section 0.5mm thick bottom wedge of 80mm with tapered flanges of 26 mm each having clips of 10.5 mm at 450mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64mm diaX230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5mm thick 27mm high having flanges of 20mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre to centre, with 25mm long drive-all screws @ 230 mm interval ,including fixing of gypsum board/calcium silicate board to ceiling section and perimeterchannel with the help of dry wall screws of size 3.5x25mm at 230mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the gypsum board with recommended jointing compound, jointing tapes, finishing with jointing compound in 3 layers covering upto 150mm on both sides of joint and two coats of primer suitable for board, |
| 17 | 12.5 mm thick tapered edge gypsum moisture resistant board |
| 18 | Providing and applying Plaster of Paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete |
| 19 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 13.88.1 1 mm thick |
| 20 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. |
| 21 | Finishing walls with 100% Premium acrylic emulsion paint havingVOCless than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives. New work (Two or more coats applied @ 1.43 litre/10 sqm. Over & including priming coat of exterior primer applied @ 0.90 litre/10 sqm. |
| 22 | Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253kg/ sqm. This layer will be allowed to air cure for 4 hours.(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm . This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours.The rate includes preparation of surface, treatment and sealing of alljoints, corners, junctions of pipes and masonry with polymer mixed slurry. |
| 23 | Removal of malba collected from guest house by mechanical means and disposal of same beyond municipal limits. |
| 24 | Providing wood work in frames of doors, windows, clerestory windows andother frames, wrought framed and fixed in position with hold fast lugs or withdash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class teak wood |
| 25 | Providing and fixing ISI marked flush door shutters conforming to IS: 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well atched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 9.21.1 With ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws. 35 mm thick |
| 26 | Extra for providing lipping with 2nd class teak wood battens 25 mm minimum depth on all edges of flush door shutters (over all area of door shutter to be measured) |
| 27 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-charge. Internal work-exposed on wall, including fixing the pipe |
| 28 | 50mm nominal outer dia pipes. |
| 29 | Internal work Concealed fixing the pipe with clamps at 1.00 meter spacing including cutting chases and making good the wall etc. |
| 30 | 20mm nominal outer dia pipes. |
| 31 | 15mm nominal outer dia pipes. |
| 32 | Providing and fixing PVC pipes including all fittings .supreme , prakash or equivalent(external work) |
| 33 | 110mm nominal bore (medium) |
| 34 | PVC Tee 4\\" |
| 35 | PVC Door bend 4\\" |
| 36 | PVC Socket 4\\" |
| 37 | PVC Elbow 4\\" |
| 38 | PVC P-trap 4\\" |
| 39 | PVC Cowl 4\\" |
| 40 | PVC Clamp 4\\" |
| 41 | 75mm dia nominal bore(medium) |
| 42 | PVC Elbow 3\\" |
| 43 | PVC Door bend 3\\" |
| 44 | PVC Tee 3\\" |
| 45 | PVC Socket 3\\" |
| 46 | PVC trap 3\\" |
| 47 | PVC Cowl 3\\" |
| 48 | PVC Clamp 3\\" |
| 49 | Supply and Installation of Following sanitary fittings, fixtures door window hardware and fixtures. |
| 50 | Washbasin jaquar |
| 51 | Providing and fixing floor mounted, white vitreous china single piece, double traps syphonic water closet of approved brand/make, shape, size and pattern including integrated white vitreous china cistern of capacity 10 litres with dual flushing system, including all fittings and fixtures with seat cover, cistern fittings, nuts, bolts and gasket etc including making connection with the existing P/S trap, complete in all respect as per directions of Engineer-in-Charge. |
| 52 | Angle Valve jaquar |
| 53 | Health Faucett with chain jaquar |
| 54 | Basin Mixer single lever jaquar |
| 55 | Towel Ring jaquar |
| 56 | Soap dishnjaquar |
| 57 | Soap Dispenser |
| 58 | Mirror |
| 59 | Connection Pipe 24 \\" |
| 60 | bottle trap jaquar |
| 61 | CP Jali |
| 62 | Toilet Paper Holder jaquar |
| 63 | Tower Bolt |
| 64 | Handle |
| 65 | Cylindrical Lock |
| 66 | Door closer |
| 67 | 5 \\" Hinges |
| 68 | ball Valve 20 mm nominal bore |
| 69 | Shower 10'' dia with arm Jaquar |
| 70 | Single lever Divertor with face plate Jaquar |
| 71 | Spout Jaquar |
| 72 | Towel Rack Jaquar |
| 73 | corner shelf jaquar |
| 74 | Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 nos.2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs. 3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface is further allowed to dry for 12 hrs. 4. On this, 1st coat of melamine polish is applied with spray gun using melamine clear polish and melamine thinner in required proportion. This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final melamine polish is applied with compressor pressure spray gun using melamine clear polish and melamine thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.) |
| 75 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorophriphos / Lindane emulsifiable concentrate of 20% |
| 76 | Treatment of existing masonry using chemical emulsion (Chlorophriphos / Lindane E.C. 20% with 1% concentration)@ one litre per hole at 300 mm interval including drilling holes at 45 degree and plugging them with cement mortar 1:2 (1 cement :2 coarse sand) to the full depth of hole: |
| 77 | Treatment of points of contact of wood work with chemical emulsion Chlorophriphos /Lindane E.C. 20% with 1% concentration (in oil or kerosene based solution) @ 0.5 litres per hole by drilling 6 mm dia holes at downward angle of 45 degree at 150 mm centre to centre and sealing the same |
| 78 | Providing fixing of Vanity Unit/ counter made up of 18mm thick HDHMR Board for all horizontal & vertical members. All the exposed plywood surfaces to be finished with 1mm thick laminate of approved shade & quality . Size(36\\" L x 18\\" W x 30\\" H.). the front shall have openable shutters.All the internal surfaces shall be lined with laminate of .8 mm thick, the top surface shall be lined with 18 mm thick Engineered Stone prepolished and pre moulded edges. The job excludes Melamine polishing of veneer surfaces complete as per specifications. The cabinet below shall have shutters for using the cabin inside. |
| 79 | Carriage of Materials |
| 80 | Stone Aggregate |
| 81 | Coarse Sand lead of 59 KM |
| 82 | Supply of labour for shifting of materials and loose furniture from room and washroom. Please Enable Macros to View BoQ information |