| 1 | Providing, laying spreading and compaction wet mix macadam (W.M.M) specifications including premixing the material with water at OMC in mechanical mix plant, carriage of mixed materials by tipper to site laying in uniform layers with paver in sub-base /base cours on well preparsd surface and compacting with vibratory roller to achieve the desired density as per MORTH specification clause 406 Complete in all respects. (A.R) |
| 2 | Providing and applying Premer Coat with bitumen 80/100 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per MoRTH specification clause No. 502 complete in all respects. (A.R) |
| 3 | Providing and applying tack Coat 0.30 kg/sqm with bitumen 80/100 using emulsion pressure on the prepared bituminous/granular surface cleaned with mechanical broom as per MoRTH specification clause No. 503 complete in all respects. (A.R) |
| 4 | Providing & laying dence graded bituminous macadam (D.G.B.M.) with 100-120 T/H batch type hot mix plant producing on average out put of 75 T/H using crushed aggregated of specified grading 1premixed with 60/70 bituminous binder @ 4.25% by weight of tatal mix and hydrated time filter @ 2% of total weight of aggragates, transperting the hot mix plant material to work site laying with a hydrostatic paver finisher with a sensor control to the required grade, label and alignment rolling with smoth wheeled (8-10T) roller vibrating roller (8T) for inter mediater rolling and finish with tender roller )6-8T) to achieve the desired compaction including supply of all material, labour T&P etc. required for proper completion of the work as MORT & H specification clause 507. (A.R.) |
| 5 | Providing and laying 40mm. Thick bituminous concrete with 100-120 TPH (Tonnes per hour) batch type HMP (Hot Mix plant) producing an average output of 75 tonne per hour using crushed aggregates of grading I,(13 mm nominal size) premixed with bituminous binder of 60/70 @ 5% of weight of mix and hydrated lime filler @ 2% of weight of aggregate, transporting the hot mix to work site, laying with a hydrostatic power finisher with sensor control to the required grade, level and alignment, rolling with smoth wheeled roller 8-10 tonne for initial break down rolling, vibrator roller 8 tonne for intermediate rolling and finish folling with 608 tonne smooth wheeled tandom roller to achieve the desired compaction and including supply of all material, labour T&P etc. required for proper completion of the work as per clause 508 of MORT & H specification and as per direction of Engineer-in-charge (A.R.) Specification clause 5096. |
| 6 | Providing and applying 2.5 mm thick road marking strips (retroreflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour ,T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. DSR 16.62/2014 |
| 7 | P/F of prismatic cat eyes as per norms including supply of all material lab. T&p etc PWD SOR2025 |
| 8 | Providing and fixing semi barrier type Kerb Stone (machine made) of with & m-20 grade concrete, size of Kerb Stone will be 0.4 x 0.3 x 0.13 cm and including outer surface finished with 1 : 3 cement and coarse sand, including supply of all materials labour T & P etc. required per peroer completion of work.(A.R.) sanctioned rate |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth level in 1:4(cement and coarse) DSR/2023/6.1.1 +3% |
| 10 | 12 mm cement plaster of mix:1:4 (1 cement: 4 coarse sand) etc all complete DSR 2023/13.4.1+3% |
| 11 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR 2023/13.80 +3% |
| 12 | Finishing walls with Acrylic Smooth exterior paint of required shade:Old work (Two or more coat applied @ 1.67 Itr/10 sqm) on existing cement paint surface 13.111.1+3% |
| 13 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR no- 2023/4.1.3 +3% |
| 14 | Clearing jungle including uprooting of vegetation grass, bush, wood, trees and sapling of girth up to 30cm. Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area.PWD SOR2022/259 |
| 15 | Banking excavated earth by mechenical/manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embanmments for roads, flood banks, and guide banks. etc. lead upto 50 m and for all lift: all kinds of soil DSR 2023 ITEM NO- 2.3.1 +3% |
| 16 | Carage of earth from 8 km including loading unloading (SOR-2022) Please Enable Macros to View BoQ information |