| 1 | Supplying and installation of horizontal split casing centrifugal pump having discharge of 14300 G.P.H clear water against a total head of 40 meters (131.2 feet) Make- Kirloskar/Mather and Platt/ jyoti / Wilo with a suitable squirrel cage induction motor 3 ph, 415 V ± 10% ,1480 r.p.m, Make- Kirloskar/ jyoti/ crompton /ABB coupled by means of tyre coupling on a common base plate with N.R valve, sluice valve rating PN- 1, ISI marked , foot valve, pressure gauge etc. all complete. |
| 2 | Cost towards supply and fitting 25 H.P fully automatic air break star delta starter , Make- L&T /Havell’s/ Siemens / Schneider / BCH |
| 3 | Cost towards replacement of damaged parts of panel by new supply and fitting 100 amp T.P.N DTH MCCB-1no incoming feeder and 63 amp T.P.N DTH MCCB-3 nos. outgoing ,0 to500v voltmeter - 2 nos., 0to 100 amp ammeter-2 nos. with selector switch ,indicating lamp 3 Nos., making internal connection with copper wire etc. |
| 4 | Cost towards dismantling 2 no. 10 H.P C/F pump set with all accessories such as suction and delivery pipe line ,foot valve ,sluice & N.R valve, base plate etc ,including demolish old foundation -2 nos. for installation of new pump set, including keeping pump set in store or as per direction of E/I and throwing broken foundation outside the pump house including cost of labors , tools, tackles. |
| 5 | Cost towards making new P.C.C foundation with supplying stone chips, sand, cement, in the ratio 3:2:1 respectively about 5’x4’x3’for above pump sets including foundation bolts with nut and washer and curing plastering of foundation ,all complete . |
| 6 | Supplying and laying of 35 mm sq. 1.1 K.V grade,3.5 core P.V.C insulated and sheathed armored Al. cable , make – polycab, havell’s /,KEI, ISI marked, |
| 7 | Cost towards doing cable socketing with Al lugs 35 mm sq. Al. cable |
| 8 | Cost of supply & laying, commissioning of 3 core 16 mm² copper conductor cable 1.1 KV grade PVC insulated and PVC sheathed unarmored from panel to starter and starter to motor with lugs socketing, |
| 9 | Cost towards making chemical earthing as per I:E Rules ,etc. all complete. |
| 10 | Cost towards making suction & delivery pipe line with supply of 100 m.m dia. heavy duty M.S pipe 40 feet , 100 m.m dia. M.S flange- 6 nos. , 100 m.m dia. heavy duty M.S bend -2 nos., 75 m.m dia. heavy duty M.S pipe -10 ft., 75 m.m dia. heavy duty M.S flange -6 nos. 75 m.m dia. heavy duty M.S bend -2 nos including cutting welding , required nut bolts, washer, rubber insertion, testing on load , all complete . |
| 11 | Cost towards making earthing connection from earth pit to change over , stabilizer ,panel, starter, motor with 6 SWG G.I wire. |
| 12 | Supply and fitting 100 amp switch fuse unit-1 no before stabilizer on the wall, including required materials such as clamp, nut, bolts, etc, for the job , make – L&T, Havell’s, any Reputed make ISI Marked. |
| 13 | Supply, fitting & commissioning of lighting arrangement at pump hose and outside of pump house such as tube light 20 W complete set 2 no and 70 W LED lamp complete set 1 nos. and making wiring, light point, fan point etc. as required. Please Enable Macros to View BoQ information |