| 1 | Dismantling of Reinforced Cement As Per S.I No 694 . as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 2 | 7 Cell 5.00x5.00 Mtr. R.C.C. Box CulvertExcavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 3 | Providing & laying concrete for plain/reinforced concrete 1:3:6 of nomind mix in foundation with crushed stone aggregate 40 mm nominal size mechanical mix placed in foundation and compacted by vibration including curing for 14 days (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 4 | Providing and laying reinforced cement concrete M-25 in subperstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 5 | Providing and fixing of weep 110 mm dia P.V.C pipe Including supply of all materials labour tool and plants etc. complete work of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 6 | Supplying fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications Clauses 1000 and 1202 of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 7 | Back Filling Behind Abutment , with granular sub-base Wing Wall and Return Wall complete as per drawing and Specification of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 8 | Dewatering with pumping set including etc all completion. of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 9 | Boaring and Loaring of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 10 | Construction of DiversionEarthwork in embankment for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.( 30 Mt Lead and 150 M Lift) S.I. No 251 Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 11 | Laying First Class brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling.as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 12 | Protction WorkProviding and laying granular filter material underneath pitching in slopes complete as per drawing and technical specification clause 1302 (MORTH Specification2504) Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 13 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification MoRTH Specification 2503 S.No. 15.1Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 14 | Construction of Approach RoadConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 15 | Providing and laying grade -1 granular sub-base with well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 16 | Providing and laying spreading and compacting stone aggregates of specific sizes 45-63 mm to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required density grading -2 as per technical specification clause 405 as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 17 | Providing and laying spreading and compacting stone aggregates of specific sizes 22.4-53 mm to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 18 | Brick edging on both sides of the road of first class bricks 8 cm (3'') wide and 12 cm. ( 4.5\\") deep laid with mud mortar including labour & supply of bricks finish to the required template and in proper alignment and also including dressing ramming the excavated earth as directed by Engineer-in-charge. as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 19 | Providing and applying Primer coat with bitumen emulsion on prepared (SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. As per technical specification clause 502 as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 20 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous granular surface cleaned with mechanical broom. as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 21 | Providing, laying and rolling of open-grade premix carpet of 20 mm thickness composed of 13.2mm & 11.2mm using VG-10 bituminous binder @ 1.46 kg/Sqm. H.P.C./I.O.C. make complying with IRC:SP 53 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C including cost of all materials, labour, T&P etc. required for proper completion as per Technical Specification Clause 508 of MORD specification. as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). |
| 22 | Providing and applying seal coat type \\"C\\" comprising of a layer of bituminous binder 6.50 Kg Per 10 Sqm followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kN Static roller and finishing to required level and grades as per Technical Specification Clause 510 Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) |
| 23 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) Please Enable Macros to View BoQ information |