|
| 1 | De-sludging, Cleaning and dewatering of sludge(solid/liquid) from septic tank/manholes through pumping set or other mechanical means including cleaning of sludge/grass/bushes and disposing off sludge to a distance not exc 100m in the excavated pit of appropriate size as directed by Engineer-in-Charge including spreading bleaching powder and filling of pit by earth complete as specified and as directed by Engineer-in-Charge.Note :- (i) Earth to be filled over the pit shall be filled after sufficient absorption of liquid and size of pit shall be made accordingly. (ii) To avoid any health hazard or spreading of any foul gas, bleaching powder shall be spreaded as directed by the Engineer-in-charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc shall be deemed to be included in the rate quoted under this item. |
| 2 | Cleaning of sewage drain pipe of stone ware pipe, RCC Hume pipe , cast iron pipe of 75 mm bore by rodding with sectional sewer rod/flexible sewer rod/bucket etc thoroughly from inspection chamber to man hole or from one manhole to another manhole of any depth and size and well flushing with water after cleaning including removal of sludge and other materials obtained from cleaning the drain pipe and manhole garbage to a pit made for this purpose and filling up the earth complete as specified and as directed. Note :-(i) Cleaning of sewage line to be started from down stream side in this operation for which some pipe line gets cleaned automatically which needs to be cleaned by rodding only and hence the same shall not be measured (ii) The unit rate of the items shall be deemed to be included for the cost of removal of sludge/waste and water accumulated in manhole/inspection chamber due to cleaning of drain by rodding etc. (iii) The sludge obtained shall be deposited in an excavated pit and filled up with earth in layers of 30cm thick as directed by Engineer-in-Charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc. shall be included in the rate quoted under this item. (iv) To avoid any health hazard or spreading of any foul gas bleaching powder shall be spread over each earth layers as directed by Engr-in-Charge. |
| 3 | All as per item No. 2.00 above but bore of pipe 100mm |
| 4 | All as per item No 2.00 above but bore of pipe 150mm |
| 5 | All as per item No. 2.00 above but bore of pipe 200mm |
| 6 | Cleaning of WC, urinal, gully/floor trap and inspection chamber manually or by rodding including flushing with water or pumping air, removal of sludge and other foreign materials as described in item No. 1 above complete all as directed. |
| 7 | Cleaning of manhole any size and any depth manually or by rodding including flushing with water , removal of sludge and other foreign materials as described in item No. 1 above complete all as directed. |
| 8 | Excavation in trenches n.exc 1.5 m wide and n.exc 1.5m depth for for foundations, pipes, manholes, etc etc, or for shafts, wells, cesspits, manholes, pier holes, etc and not exceeding 10 square meter on plan for manholes etc and getting out in soft/loose soil complete as specified and as directed. |
| 9 | Returning, filling in foundation including spreading levelling, watering and well ramming in layers not exceeding 25 cm depth complete as specified and as directed. |
| 10 | Removal of surplus soil to a distance not exceeding 60m and depositing where directed at a level n.exc 1.5m above the starting point complete as specified and as directed. |
| 11 | Demolition and breaking up drain pipes 300 mm (Salt glazed stone ware, AC or reinforced concrete) set in cement mortar and removing from site of work to a distance n.exc 100 meter complete as specified and as directed. |
| 12 | All as per above item no 11.00 but 200 mm bore pipes |
| 13 | All as per above item no 11.00 but 150 mm bore pipes |
| 14 | All as per above item no 11.00 but 100 mm bore pipes |
| 15 | Material and labour for PCC (1:4:8) type D2 (using 40mm graded crushed stone aggregate) as in bed for drain pipes including packing under and haunching against the sides of pipes after they are laid and tested for 300 mm bore pipe complete as specified and as directed. |
| 16 | All as per above item no 15.00 but for 200 mm bore pipe. |
| 17 | All as per above item no 15.00 but for 150 mm bore pipe. |
| 18 | All as per above item no 15.00 but for 100 mm bore pipe. |
| 19 | Material and labour for 300 mm nominal dia DWCPE pipe (SN-8) pipes ISI marked laid in trenches and joined complete all as specified and directed |
| 20 | All as per above item no 19 but 200 mm bore. |
| 21 | All as per above item no 19 but 150 mm bore. |
| 22 | All as per above item no 19 but 100 mm bore. |
| 23 | Materials and Labour for plain cement concrete (1:3:6) type C-1, using 20mm graded stone aggregate as in surface channel and drain surface to be finished even and smooth without using extra cement complete all as specified and as directed. |
| 24 | Materials and Labour for extra for forming fair finished drain or channel 30 cm inner girth in cement concrete, using extra cement, including forms, moulds, mitred/stopped ends etc. all as specified and as directed. |
| 25 | Material and labour for 75 mm thick PCC 1:3:6 type C-2 (using 40mm graded mechanically crushed stone aggregate) as in plinth protection/footpath, surface to be finished even and smooth without using extra cement laid in alternate bays and joint to be filled with bitumen filler complete all as spd. |
| 26 | Demolition of brick work built in cement mortar including all quoins arches, pillars etc but excluding ashlars facings, dressed stone work & precast concrete articles, removing unserviceable portion/debrish from site complete as specified and as directed. |
| 27 | Materials and labour for brick work with sub class 'B' burnt clay bricks straight or curved on plan exc. 6mtr mean radius, built in cement mortar 1:4, complete all as specified and directed. |
| 28 | Materials and labour for brick work with sub class 'B' burnt clay bricks straight or curved on plan to any radius in one and half brick thick honey comb walls built in cement mortar 1:4 complete all as specified and as directed. |
| 29 | Materials and labour for rendering 15mm thick in cement mortar (1:6) on fair faces of brick work or concrete surfaces, finished even and smooth without using extra cement, complete all as specified and directed. |
| 30 | Materials and labour for rendering 20mm thick in two layers of 10 mm thick each in cement mortar (1:4) on fair faces of brick work or concrete surfaces,WPC shall be mixed with morter of top layer, finished even and fair, complete all as specified and directed. (Note: WPC shall be measured and paid separately as supply only) |
| 31 | Supply only liquid Water Proofing Compound of approved make. |
| 32 | Material and labour for precast RCC 1:2:4, type B1 (using 20 mm graded crushed stone aggregate) as in cover slab and set in cm 1:6 including necessary form work and moulds complete as specified and as directed. |
| 33 | Materials and Labour for formwork to soffits of suspended slabs such as roof slab, floor slabs, landings and similer works, for rough finished flat surfaces of concrete, thickness of slab not exc 200 mm, complete all as specified and directed |
| 34 | Materials and Labour for reinforced cement concrete (1:1.5:3) type A1 (nominal mix) using 20 mm graded stone aggregate as in slabs and shelves supported on walls, beams and columns in floors, roofs and landings etc, any thickness complete all as specified and directed. (Note: Steel reinforcement shall be measured & paid separately) |
| 35 | Materials and Labour for TMT bars 6 to 8 mm dia , as reinforcement for concrete cut to length, bent to shape required including cranking, bending, spirally hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.90mm dia, complete all as specified and directed. |
| 36 | Supply and fixing 110 mm bore PVC (SWR) Soil, waste and vent pipes single socketed in any length with rubber ring joints laid in trenches or in floors complete all as specified & directed. |
| 37 | Supply and fixing 110 mm bore PVC (SWR) Soil, waste and vent pipes single socketed in any length with rubber ring joints fixed to walls complete all as specified & directed. |
| 38 | Supply and fixing 110 mm bore PVC (SWR) bends with/without door of any radius complete all as specified & directed. |
| 39 | Supply and fixing 110 mm bore PVC (SWR) junction single,(Single T) equal or unequal with access door complete all as specified & directed. |
| 40 | Supply and fixing 110 mm bore PVC (SWR) branch piece branch piece, single (Single Y) equal or unequal with access door complete all as specified & directed. |
| 41 | Supply and fixing 75 mm bore PVC (SWR) Soil, waste and vent pipes single socketed in any length with rubber ring joints laid in trenches or in floors complete all as specified & directed. |
| 42 | Supply and fixing 75 mm bore PVC (SWR) Soil, waste and vent pipes single socketed in any length with rubber ring joints fixed to walls complete all as specified & directed. |
| 43 | Supply and fixing 75 mm bore PVC (SWR) bends of any radius complete all as specified & directed. |
| 44 | Supply and fixing 75 mm bore PVC (SWR) junction single,(Single T) equal or unequal with access door complete all as specified & directed. |
| 45 | Supply and fixing 75 mm bore PVC (SWR) branch piece branch piece, single (Single Y) equal or unequal with access door complete all as specified & directed. |
| 46 | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons etc. laid, bedded pointed in any mortar and removing rubbish off the premises etc complete all as specified and directed |
| 47 | Material and labour for PCC 1:4:8 type D-2 (using 40mm graded mechanically crushed stone aggregate) as sub base of flooring 75mm thick all as specified. |
| 48 | Material and labour chequered cement concrete tiles 30cmx30cmx25mm thick with grey cement and pigment set jointed and pointed in neat cement slurry in floors over and including 15 mm thick cement mortar screed bed in CM 1:6 complete all as specified and directed. |
| 49 | Materials and labour for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and as directed |
| 50 | Demolition of cement concrete in ground floors and paving n.exc 15 cm thick (below or above ground level) unreinforced complete all as specified and directed |
| 51 | Materials and Labour for plain cement concrete (1:4:8) type D-2, using 40mm graded stone aggregate as in foundations, filling and mass concrete complete all as specified and as directed. |
| 52 | Material and labour hardcore of broken stone or boulders of gauge not exceeding 63 mm deposited, spread and levelled in layers not exceeding 15cm thick, watered and rammed to a true surface complete all as specified and directed. |
| 53 | Material and labour Machine pressed precast concrete interlocking paver block with grey cement and pigment of any shape and size conforming to IS-15658-2006 of 60mm thick, M-35 Grade complete all as specified and directed |
| 54 | Material and labour for Sand cushioning under floors or interlocking paver block including watering and consolidation complete all as specified and directed. Please Enable Macros to View BoQ information |