| 1 | Laying and Jointing PVC Pipe. Heading Item No. 1 -Providing and fixing information board of size 1.50x1.20 m prepated on 16.BW G.M.S sheet 25x25x3 mm . Angle iron frame including painting lettering as directed including providing and fixing 50x50x5mm Angle iron post including conveying and fixing in C.C. 1:4:8 block etc. complete. |
| 2 | Item No.2 -Labour charges for removing, disassembling, assembling and re-erection of pumps --- etc. complete. |
| 3 | Items No .3:-Supplying & erecting automatic control panel for 3 Ph, 415 volt, A.C. Submersible/centrifugal pump set up to 20 HP consisting of Star Delta starter having relay range 28-42 Amp, S.P.P., Combined ammeter/ voltmeter, phase indicating lamp enclosed in CRCA powder coated Vibration proof enclosure with IP 54 protection. Control Panel should offer single phasing, phase reversal, phase imbalance etc . |
| 4 | Item No. 4 - Providing, erecting and giving test of submersible pump set conforming to IS 8034 and motor conforming to IS 9283, with water proof winding. Pump shall be suitable for various delivery head and discharge with stainless steel shaft. Motor suitable for working on 415 V ± 10%, 3 Ph,50 Hz A.C. Supply, with cable guard, thrust carbon/fiber bearing to withstand entire hydraulic thrust. The pump set shall be suitable for direct coupling, with suitable suction strainer. Pump should have suitable discharge out let as per manufacturer's design. Antithrust stream lined non return valve shall be provided with the pump. 3 m submersible copper conductor cable in single / double run and 2 pairs of suitable size erection clamp 10mm thick shall be provided with each pump. Submersible Pump 200 mm dia (with Bronze /Stainless steel (CF8M) mpeller)up to 8 stages of category A & B Rate anyalysis) HP-20 ( Head- 110.00m, Discharge-30 Cum/hour) |
| 5 | Item no. 5 :- Providing double flange sluice valve confirmingfor IS-14846 includingworngear arrangements as per testpressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied byGOI &GOM in all respect etc. complete. (1)200 mm. Dia.- Sluice Valve |
| 6 | 2)150 mm dia NVR valve.-PN-1.6 |
| 7 | 2)100 mm. dia.NVR valve.-PN-1.6 |
| 8 | 3)80 mm. dia.NVR valve.-PN-1.6 |
| 9 | Item No.6 - Providing, fabricating, erecting, M.S.Flanges sleep on type (all tables) of required size and thickness with both side machined. PW 10-1 P.No.18 |
| 10 | Item No. 7- Supplying and erecting, Flat flexible submersible cable with, Copper Conductor, PVC insulated, and PVC sheathed. 3 core 10sq. mm. Copper |
| 11 | Item No. 8- Supplying, erecting, testing and commissioning of flat flexible 3 core 2.5 sq.mm PVC sheathedsubmersible type copper cable suitably clamped at fixed intervalswith column pipe assembly complete. 12-4-8 P.No 175 141+5% |
| 12 | Item No.9 - Submersible monoblock Pump set (with Bronze / Stainless steel(CF8M) Impeller)Horizontal /Verticalup to 3 stagesCW-PLB/GP. 5.00 HP |
| 13 | Items No .10:- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) |
| 14 | Items No .11:-Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(Bd-A-3/259) |
| 15 | Items No .12:--Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-4/259) |
| 16 | Items No.13:-Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc.complete. |
| 17 | Items No.14:-Supply, install andcommission Electromagnetic Flow Meter (EMF) As Per ISO4064, for Raw/Pure water with accuracy +/ 0.5% of measured value & protection as per given specifications for size 100mm1000mm includingsensor ,transmitter surgearrestor, cable GI duct if suitable size for 25 mtrsbuilt inGSM/GPRS (with Simcard and it scharges ,validfor 36months) including the pipe 36months) including the pipe cutting, levelingand installation of flowmeter in the pipelines with necessary tool tackles, cranes including 36 months guarantee etc complete, asmay be requiredat site&basedon technical specifications |
| 18 | Item No .15:- Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. SECTION-I(IX)PIPES (123) 90 mm dia |
| 19 | Item No.16:- Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. completeasperIS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in ratesbelow 100 MM Dia GI Pipe |
| 20 | Item No .17:-Supplying, erecting, testing & commisioning 100 kVAr, 440 V, 3 phase, 50 Hz., APFC Panel with contactor logic with intelligent microprocessor relay, consisting of 2,3,5,10,20.20,20,20 or suitable steps of APP/MPP type capacitor units with detuned (harmonic filter) reactors of suitable rating, APFC panel shall be compliance to IEC 61439 and power quality IEC 61921 standard as per specification no. CP-ED/APFC. IT No 6-9-8 Rs 298571 |
| 21 | Item No.18:-Supplying Erecting and giving test of centrifugal coupled pump with base plate coupling and foundation bolts, etc. on provided concrete foundation / RSJ with accurate levelling with shims and proper alignment. ( Head- 65.00m, Discharge-260.00 Cum/hour) 100 HP RPM -1440 |
| 22 | ItemsNo.19:-Lowering,LayingandJointingH.D.P.E./ M.D.P.E. pipes inproper position including all specials by compression fitting/electrofusionand butt fusion jointing procedureasper relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusionweldingmachinewithhydraulic jack, top loadingclampetc. andall labours as directedbyengineer inchargeasperIS-7634Part II Fora 90mm dia HDPE Pipe Please Enable Macros to View BoQ information |