| 1 | Providing ISI standard lengthRCC Pipe in standerd lengths of following class and diameter suitable for either collar joints or rubber ring joints excluding GST levied by GOI & GOM in all repect including inspection charges transport to departmental stores /site ,unliading and stacking etc.complete.as per IS-458/1988 300 mm dia. RCC NP2 |
| 2 | 450 mm dia. RCC NP2 |
| 3 | 600 mm dia. RCC NP2 |
| 4 | Excavation for foundation / pipeline trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50m and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding back filling etc. complete.(Bd-A-1/259) |
| 5 | Excavation for foundation / pipeline trenches in hard murum including removing the excavated material upto a distance of 50m and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding back filling etc. complete.(Bd-A-2/259) |
| 6 | Excavation for foundation / pipeline trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50m and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding back filling etc. complete.(Bd-A-4/259) |
| 7 | Excavation for foundation / pipeline trenches in hard rock by controlled blasting including trimming and levelling the bed by chiesling where mecessary removing the excavated material upto a distance of 50m and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding back filling etc. complete.(Bd-A-5/259) |
| 8 | Filling in plinth floors murum bedding in trenches with approved murum from excavated material from foundation 15 to 20 cm layers including watering and compaction etc.complete.(Bd-A-10/263) |
| 9 | Lowering laying and jointing in proper grade and alignment RCC pipes with collar joints in CM 1:1 proportion or socketed RCC pipes with rubber joints including cost of conveyance from stores to site of work ,cost of jointing materials ,labour etc.comp. (For all classes of pipe.)as per IS-783-1985 300 mm dia. RCC NP2 |
| 10 | 450 mm dia RCC NP2 |
| 11 | 600 mm dia RCC NP2 |
| 12 | Providing and constructing on sewer ,B.B.masonry circular manhole with concentric cone 1.20 m dia at bottom and 0.50m . at top and upto a depth of 2.00m eith 23 cm brick workin CM 1:4 -etc.complete. a) Lift upto 0.50 m |
| 13 | b) Lift upto 1.00 m |
| 14 | b) Lift upto 1.50 m |
| 15 | Refilling the trenches with available excavated stuff with soft material first over pipe line and then hard material in 15 cm layers with all leads and lits including consolidation,surcharging etc.compelte. |
| 16 | Providing and fixing Board displaying information such as name of the work, tender cost, name of contractor, work completion and liability period etc. having rectangular shape of 1.20 m.X 0.90 m. size made out of 18 Please Enable Macros to View BoQ information |