| 1 | PART ADismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth, watering and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 2 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm |
| 5 | Providing 6mm cement plaster (1:4) in ceiling with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 6 | Providing 12mm cement plaster (1:3) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 7 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 8 | Taking down old door and window shutters including stacking serviceable materials within 15M,. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 9 | Taking down chaukhats in doors including stacking serviceable materials within 15M,. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 10 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 11 | Providing two coats of plastic emulsion paint of approved shade and make over a coat of cement primer over new surface including preparing plastered surface by rubbing smooth with pumice stone or fine sand paper, applying putty wherever required, scaffolding washing of floor and taxes all complete as per building specification and direction of E/l. |
| 12 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade :New work (Two or more coats applied @ 1.43 ltr/ 10 sqm overand including priming coat of exterior primer applied @ 2.20kg/ 10 sqm) |
| 13 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 14 | Providing and laying Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). |
| 15 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinthlevel :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate20 mm nominal size) |
| 16 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) |
| 17 | Providing and fixing mineral fibre false ceiling tiles at all heights of size595X595mm of approved texture, design and pattern. The tiles shouldhave Humidity Resistance (RH) of 99%, Light Reflectance ? 85%,Thermal Conductivity k = 0.052 - 0.057 w/m K, Fire Performance asper (BS 476 pt - 6 &7)in true horizontal level suspended on interlockingT-Grid of hot dipped all round galvanized iron section of 0.33 mm thick(galvanized @120 gsm) comprising of main T runners of 15x32 mm oflength 3000 mm, cross T of size 15x32mm of length 1200 mm andsecondary intermediate cross T of size 15x32 mm of length 600 mmto form grid module of size 600x600 mm suspended from ceiling usinggalvanized mild steel item (galvanised@80gsm) 50 mm long 8mmouter diameter M-6 dash fasteners, 6 mm diameter fully threadedhanger rod up to 1000 mm length and L-shape level adjuster of size85x25x2 mm, spaced at 1200 mm centre to centre along main ‘T’.The system should rest on periphery walls /partitions with the help ofGI perimeter wall angle of size24x24X3000 mm made of 0.40 mmthick sheet, to be fixed to the wall with help of plastic rawl plug at 450mm centre to centre & 40 mm long dry wall S.S. screws. The exposedbottom portion of all T-sections used in false ceiling support systemshall be pre-painted with polyester baked paint, for all heights. Thework shall be carried out as per specifications, drawings and as perdirections of the engineer-in-charge |
| 18 | Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approveddrawing & direction of Engineer-in-Charge. (Single / double glass panes,wire mesh and silicon sealent shall be paid separately). Variation inprofile dimension in higher side shall be accepted but no extra paymenton this account shall be made.Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable. |
| 19 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermalexpansion, (i) Single socketed pipes. |
| 20 | Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion.Coupler 110 mm |
| 21 | 110 mm Bend 87.5° |
| 22 | Shoe (Plain) 110 mm |
| 23 | Providing and fixing CPVC pipes do----do all com job. 20 mm dia |
| 24 | 25 mm dia |
| 25 | Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50 mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete. |
| 26 | Carriage of Material(a) Sand lead = 15 km |
| 27 | (b) Stone Chipes lead = 22 km |
| 28 | (c) Bricks lead = 8 km |
| 29 | Wiring for light point/ fan point/exhaust fan point / call bell point with 1.5 sq.mm FR PVC Modular type GROUP - C |
| 30 | Wiring for light/power plug with 2x 4 sq.mm FR PVC insulated, copper conductor |
| 31 | Circuit/submain wiring in PVC conduit 2x1.5 Sqmm + 1x1.5 sq mm earth wire |
| 32 | 2X2.5 sq mm +1 x 2.5sq mm earth wire |
| 33 | 2X4sq mm +1 x 4sq mm earth wire . |
| 34 | 2x6 Sqmm + 1x6 sqmm earth wire (For essential TPN DB) |
| 35 | 4x10 Sqmm + 2x6 sqmm earth wire (For Normal TPN DB) |
| 36 | Supplying and fixing following size pvc conduit 20mm dia |
| 37 | 25 mm dia |
| 38 | Supplying and fixing of following way single pole & neutral, sheet steel , MCB distribution 12way SPN double door. |
| 39 | Supplying and fixing 5 amps to 32 amps, rating, 240 volts, 'B' series6/32amp Single pole |
| 40 | Supplying and fixing 5 amps to 32 amps, rating, 240 volts, 'C' series, maniature circuit 6/32amp SPN |
| 41 | Suppling and fixing 20amp SPN MCB industrial socket outlet with box and 20amp SP MCB. |
| 42 | Supplying and Fixing following size/modules, GI box along with 6 module G.I boxes,modular base & cover plate. |
| 43 | S.I.T.C. of following rating recess/surface mounted Led with all necessary accessories as required. 1'x1' LED Panel light |
| 44 | 450 mm (18\\") metal body wall fan with speed regulator suitable for single phase 220v, 50Hz AC supply |
| 45 | COPPER EARTH PLATE ELECTRODE:-Earthing with copper plate 600mmx 600mmx 3mm thick including acessories and providing masonary enclosure with cover plate having locking arrangement and watering pipe etc.(but without charcoal or cock and salt) complete etc. as required.(2 Nos. for Main Panel,2 Nos. For APFC Panel,3 Nos. for D.G Set, 3 Nos for transformer) |
| 46 | MV Cable Laying upto 35 Sq mm in ground:- Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc, as required. |
| 47 | PART BEGP. puff panels for O.T wall walls &ceilingSupply, installation, testing and commissioning of modular OT Walland corner panels with insulated prefabricated puff Panels. The OT wall shall be constructed using EGP puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of 0.80 mm thickness are firmly bonded together by sprayed -in insulating foam, which hardens during the process. The core consists of rigid polyurethane foam, which has been injected under high pressure, with a minimum density of 40kg/m3. The thickness of Puff shall be minimum 40 mm. The sheet panel shall be of indigenous reputed make and be provided with manufactures test certificate. The puff panel shall be fixed to the floor with bottom track of 1.5 mm thick steel U channel section having min size of 50mm X 50mm. The bottom shall be fixed in the floor of the OT with 10mm thicknessand min. 60 mm long fasteners which shall be fully threaded and power drilled. The Panels of walls and ceiling shall be tied together by suitable SS coving. The individual wall panels of wall and ceiling shall be tied together by suitable coving. The individual wall panels shall be welded together . All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the panel of the theatre shall be sufficient for the flush mounting of This gap shall be provided to accommodate the equipment at a latter date and to enable services, pipes conduits etc, to be run within the gap. All wall-mounted equipment shall be flush mounted and sealed in operation theatre. All the sharp edges and corners shall be in radius to avoid bacterial contamination. TProduct should have warranty of at least 10 years. The work should be executed as per the directions of Engineer in-Charge. |
| 48 | EGP puff panels for OT ceilingmodular OT ceiling panels with insulated prefabricated puff Panels. The OT ceiling shall be constructed using EGP/ GI puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of 0.80 mm thickness are firmly bonded together by sprayed -in insulating foam, which hardens during the process. The core consists of rigid polyurethane foam, which has been injected under high pressure, with a minimum density of 40kg/m3. The thickness of Puff shall be minimum 40 mm. The sheet panel shall be of indigenous reputed make and be provided with manufactures test certificate. The puff panel shall be fixed to the floor with bottom track of 1.5 mm thick steel U channel section having min size of 50mm X 50mm. The bottom shall be fixed in the floor of the OT with 10mm thicknessand min. 60 mm long SS fasteners which shall be fully threaded and power drilled. The Panels of walls and ceiling shall be tied together by suitable SS coving. The individual panels of wall and ceiling shall be tied together by suitable SS coving. The individual wall panels shall be welded together by SS. All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the panel of the theatre shall be sufficient for the flush mounting of This gap shall be provided to accommodate the equipment at a latter date and to enable services, pipes conduits etc, to be run within the gap. All wall-mounted equipment shall be flush mounted and sealed in operation theatre. All the sharp edges and corners shall be in radius to avoid bacterial contamination. The wall panel design shall be such that it enables the Provision of openings required for the installations shall not affect rigidity and strength of the panel. Access boxes shall be fitted to the rear of all wall mounted equipment to enable maintenance to be carried out from outside the operation theatre. Product should have warranty of at least 10 years. The work should be executed as per the directions of Engineer in-Charge. |
| 49 | Antibacterial / Antifungal Paint. Providing and establishing anti-bacterial & anti fungicidal sterile coating of liquid plastic paint on GI Puff/SS panel of modular OT. The paint should be seamless, easy to clean, should have vapor permeability which allows substrate moisture to escape and protects against growth of bacteria, mound and yeasts, moisture resistance, freeze / thaw resistance. Anti-bacterial anti microbial quality should remain active throughout the life of the product. Vapors permeable structure should allow damp substrates to dry out without causing blistering. It should tolerate cleaning with hospital chemical agents. Filling of all joints and cavities should be with metallic epoxy filler and sand casted flush to provide a joint-less finish. This should include all fittings, accessories, hardware, support structures, etc. required for installation. Anti-bacterial and anti-fungus sterile coating shall be applied on the finished walls & ceiling with at least 2-3 coats to achieve a thickness of minimum 200 micron. Before application of sterile wall coating an appropriate primer shall be applied. The primer shall be supplied along with the paint and should be of the same make as that of paint. and shall be applied prior to coating of anti-bacterial & anti- fungus sterile paint on walls & ceiling 2-3 coats shall be applied to achieve a thickness of 200 microns. Sterile coating and primer shall be applied on the surface by air-less spray gun. Sterile coating shall withstand against application of commonly used cleaners in the operation rooms and shall withstand against regular steam cleaning. Product should have warranty of at least 10 years. The work should be executed as per the directions of Engineer in-Charge. |
| 50 | SITC of Ceiling filtration system 2400x2400mm: The ceiling filtration system shall be 2.40 meters x 2.40 meters and will be integrated with the adjacent false ceiling. The ceiling shall be constructed with a plenum box supplied with conditioned air from the central system via 8 nos. HEPA filters (European Norm EN 1822:2009; Class H 14; DOP 99.97-99.9999% efficiency for 0.3 micron particles) with pressure drop of 300 Pascal’s at its nominal flow rates (supplied with the Plenum), mounted on the exit from the supply |
| 51 | Homogeneous Conductive PVC Vinyl Flooring in O.T.,Providing and fixing 2 mm thick homogeneous conductive PVC JEOFlor Electro + SD Roll acts as a Continous Conductive 10^6 |
| 52 | Homogeneous Conductive PVC Vinyl Flooring in O.T.,Providing, fixing, supply, Installation commissioning of flooring seamless with perfectly curved flash-covings resistance to mechanical stress and dynamic loads and having ESD / EMI protection characteristics, 2mm thick , washable all joints welded., JEOFLOR TRENDY+: Highly resistant 2 mm thick homogeneous product in rolls. Surface treatment with UV Protected PUR+Iodine Stain Free matt finish that does not require wax for life. Weight = 2800 g / m2, abrasion value according to EN 660.2 = 2.0 mm3, group T, binder type I, class load 34/43, residual indentation = 0.03mm. Fire classification Bfl-s1. TVOC after 28 days <10 ppm / m3 . REACH compliant.ISO717-2 Weighted improvement of impact sound insulation is +4db. Providing, fixing, supply, Installation commissioning of flooring seamless with perfectly curved flash-covings resistance to mechanical stress and dynamic loads and having ESD / EMI conductive protection characteristics, 2mm thick , washable all joints welded., |
| 53 | Providing and laying of 2-3 mm average thick layer of cementations smoothening compound of UZIN NC 149 sh or equivalent as recommended by the Vinyl sheet flooring manufacturer over and including a priming compound of UZIN PE 360 sh equivalent as recommended by the Vinyl sheet flooring manufacturer and insallation team on concrete surface to provide a smooth & homogenous surface for laying of Vinyl sheet flooring complete to the entire satisfaction of Engineer-in-charge. |
| 54 | Writing White Board.Supply & Installation of writing unit/white boardof size 900/600 mm having 1.60 mm thick white laminate board top, bonded to a 40 mm high density fiber board sheet for additional rigidity. The unit should open to create a wall mounted writing surface within the operating room. The work should be executed as per the direction of Engineer-in-Charge. |
| 55 | Storage Unit .Supply and installation of storage unit of SS 304of reputed make and having size 1665 x 865 x350 mm and having two or more glass shelves of toughened glass 10 mm thick, supported with D type bracket (SS 304 grade) with 10 mm thickness and rubber gasket of 2mm and mounted flush on wall. The work should be executed as per the directions of Engineer–in-Charge. |
| 56 | Pressure Release Damper.Supply, installation, testing & commissioning of SS Fabricated Cascade Pressure relief dampers: Suitably sized air pressure relief damper should be placed enabling differential room pressure to be maintained. Counter- weight balancing system should be provided in the PRD to maintain positive pressure inside the operation room. |
| 57 | Peripheral Lights (Dimmable).Supply Installation and Commissioning of 42W Bottom Opening Room fixture with IP 65, Led make should be Nichia/Seoul < 5 SDCM , Own make BIS certified Islocated Driver , Flicker Free , Class 2 SELV driver, Operating temperature: -10°C to +45°C, Operating voltage range: 140-270V, Surge protection >3.5 KV, High Efficiency driver: 80-85% ,Low Voltage Cut Off below 130V, Output short circuit protection , Fixture Made up of MS powder coated white after phosphochromate treatment provided as standard with sheet thickness of 1.2MM, Diffuser of High impact polycarbonate opal diffuser with thickness 1.5MM for glare free uniform light distribution, power coating : 60 Microns , Lamp Source :High efficiency long life LED package in integral module with lumen efficacy of >140 lm/W and viewing angle of 120° to ensure better uniformity,Average life L70B50: 50000 hours, THD<10%, PF>.95, System efficacy >95- 100 Lm/W, CRI>80 ,IP65, IK05 Impact rating, . Dimension Will Be 1240X330X115mm, Safety test as per IS:15885 Part 2/Sec 13. |
| 58 | AHU With Outdoor Unit AC11.5 Tr including Insttalation DOUBLE SKIN AIR HANDLING UNIT :Supply, installatio n, testing and commissioning of double skin constr uction AIR HANDLING UNITS. With inner Sheet SS 304 and Ouer sheet PPGI with 40 mm Panel Thickness with mixing box with FA,RA,SA dampers, fitted with 2 stage filteration arrangment completed with 10 micron filters 5 mico nfilter after fan section. suitable for outdoor in stallation with 45 mm thick panels with inner skin 0.6mm thick aluminium sheet, thermal breack and w eather proof.Motor Efficiency Factor - IE-2â– Mix ing box with manually operated fresh & return air AL dampers.â– Filter section with 50 mm thick box type pre-filter (MERV-8) & 305 mm thick rigid med ia type fine filter (MERV-10) mounted on a common filter frame & Viscous/ wasable synthetic type air pre-filterâ– Coil section with 8 Row deep DX coi l . Fin Material - Plain Aluminium Fin spacing - 1 1-13 FPI, Condensing tray - 22G SS304, Test Pressu re - 38Kg/Sq.cm. Insulation Material for Drain Tra y-13mm thick close cell Nitrile Rubber.â– UV Lamp |
| 59 | AHU Control Panel Wirh Controlling sytem of AHU , AC and safity System. |
| 60 | Aluminum Ductiing 22 Gaze Ducting : ( Al. sheet metal )Ducting:- Supply and fixing of site fabricatedAl sheet metal ducts in a ccordance with theapproved shop drawings and as re quired as per specifications.All necessary GI /MS supports using thread rods (as directed). Angle, f lat, and anchor bolts, food grade neoprene gaskets , food grade adhesive included in the scope. |
| 61 | Insulation UNDERDECK INSULATION :Supplying and fixing of unde rdeck roof insulation of 13 mm thickness of mat fi nish closed cell Antimicrobile nitrile rubber ( cl ass 'O' ) insulation on existing surface after app lying two coats of cold setting adhesive as requir ed. |
| 62 | Surgical Scrub (2 Bay).Supplying, fixing installation, testing andcommissioning of scrub sink with the following specifications:- Compact surgical scrub sink should be designed for use in OT complex for pre procedural scrub up. (Double sink combination size 1500 mm X 450mm X 1650 mm back height& 1200 mm and front heightas suitable) • Each fixture should be fabricated from heavy gauge type 304 stainless steel (minimum thickness1.5mm) and should be seamless welded construction, polished to a satin finish • The scrub sink should be provided with a front access panel which should be easily removed for access to the water controlled valve, waste connections, stoppers and strainers.• Hands free operation should include infra-red sensors with programmable adjustment.• Thermostatic mixing, valve control should be located behind the access panel and maintain constant water temperature.• Timing should be adjustable to meet individual application requirements.• Provided with infrared sensors, thermostatic control taps with feel safe temperature controls with foam flow attachments and provide with Betadine dispensers .• All units should have reduced anti- splash fronts. • Knee/foot operated switch should be provided additionally. The work should be executed as per the directions of Engineer–in-Charge. |
| 63 | Sliding Type Hermitically sealed OT Door (Autometic)Supply & fixing of sliding type OT door having high density particle board cores, high pressure laminate face on both sides, viewing window 300 x 300mm. With Hand Sensor and Foot SensorStandard Size: 1500 x 2100 mm (W x H) |
| 64 | Hinged Door HPLSupply & fixing of sliding type OT Corridor door having high density particle board cores, high pressure laminate face on both sides, viewing window 300 x 300mm. With Manuwal Operated, Standard Size: 1500 x 2100 mm (W x H) as per Site Customized. |
| 65 | Surgeon Control Panel.Supply, installation, testing & commissioning of multi colour coded Surgeon Control Membrane Touch Panel, flushed in the theatre wall comprising of the following features & as per technical specification attached:1. Display of Day Clock2. Display of Elapse Time Clock3. Dimmer for peripheral lights4. Medical Gas Alarm5. Hands free telephone6. Indicator for temperature & Humidity. |
| 66 | X-Ray View Screen.Supply, installation, testing & commissioning of Twin Plate X-Ray viewing screen designed to provide a high level of control luminance without Flickering & as per the technical specification attached.X-ray view screen (two screen) LEDOverall dimensions (LxHxT) 880 x 503 x 29mmView area (WxH) : 736 x 440 mmLight source : LEDPower consumption / input power : 30W / AC 100-240VIllumination intensity : 5,500 LUX approx. |
| 67 | Surgeon PendentProviding & fixing of Singale arm multi moveable surgeons pendant with load carrying capacity of 80Kg and rotational values of 330-340 degree with adjustable stopper. The pendent should be designed with service head to host, base, gas module, electric modular and shelves upto 8 gas outlets & 10 Electrical switches. Racks & Shelves should be provided to mount the equipments like monitor etc. The surgeon pendent should have two arms |
| 68 | Anaesthesia Pendant .Providing & fixing of single arm (900mm) anaesthesia pendant with load carrying capacity of 80Kg and rotational values of 330-340 degree with adjustable stopper. The pendent should be designed with service head to host, base, gas module, electric modular and shelves upto 8 gas outlets & 10 Electrical switches. Racks & Shelves should be provided to mount the equipments like monitor etc. The surgeon pendent should have two arms |
| 69 | Multi-purpose OT Table , \\"C\\" arm CompatiableThe Electro-Mechanical driving mechanism assures smoothand quiet movements of the Table Top. The Table Top is made of Radio-Translucent material forFluroscopic capability. Operating Positions including Height Adjustment,Trendelenberg, Reverse Trendelenberg, Lateral Tilt and BackSection can be controlled quickly and accurately with thehelp of lightweight Hand Control Unit. Interchangeable Head & Leg sections and manually operatedby the means of precise Ratchet System. Ortho-SurgeryOrthopaedic Leg Traction Device.Orthopaedic Hand Traction Device.Hip Nailing Support (Inner thigh rest with pad).Tibia Support (L-shaped knee rest with pad).Steinmein Pin.Radio-Translucent Hand Operating Table.Poplital Support |
| 70 | LED Operating Light Providing & installation of LED operating light having Maximum illuminance (1m): 160,000 + 160,000 Lux at 1m distance, Electrical power: 150 + 90 W, Power consumption: 2x 11 A, Fitting: Ceiling anchoring ring ceiling pendant with 2 brackets and 2 spring arms, Range of movement: 1x 360° / 1x 330°, Recommended room height: at least 2.45 m, Max. ceiling load: 2x 218 Nm / 650 N, Light body weight: 9.2 + 7.5Kgs, Light body depth: 1x 130 cm / 1x 140 cm, Air shielding surface: 2 x 330 cm2 Transformers: 2x 450VA/230V/26V, Brightness regulator: 2x 20 – 500 VA (primary voltage), Provided with 2 Sterilisable handles with each dome, Easy positioning by sterilisable handle, Focus adjustable by sterilisable handle, Life time of Bulbs : 45,000 hours etc as per technical specifications attached |
| 71 | MGPS Work In side Modular OTMGPS work with Medical Grade Copper Pipe , Fittings, 22mm Pipe for Vaccume and Other GasPipe Line 15 mm mm , |
| 72 | GEM Rate Anethesia workstation |
| 73 | Add GST 18 % |
| 74 | Add L.Cess 1 % Please Enable Macros to View BoQ information |