| 1 | Dismantling & Removing cement concrete including stacking theuseful material for reuse and removing the debris within 50m lead & cost of all labour,cess etc. all complete |
| 2 | Labour charges for removal of RCC drain cover slab & re- installing the same to orginal position carefully after cleaning the inside of drain as per direction of EIC |
| 3 | Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead of 50m clear from work site with laying in layer of 0.30m in depth,breaking the clod to maximum 5 to 7 cm in size & including cost of all labour cess etc.all complete . |
| 4 | Carriage of Excavated earth by mechanical means with in 5km lead including loading and unloading with all cost Conveyance T&P sun dries etc.complete as per direction of Enggineer-in-charge. |
| 5 | Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete |
| 6 | C.C. ( 1 : 4 : 8 ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete |
| 7 | Cleaning the existing granular base surface including removal of binding materials and other foreign materials with wire brushes and small picks sweeping with brooms or soft brushes and finally dusting with old gunny bags and or compressed air to receive bituminous. |
| 8 | RCC/PCC work in M- 20 Grade of concrete with 20 mm & down graded size CBHG chips including hoisting & laying & cost, conveyance to site , royalty , Cess DMF & EMF and additinol royalty etc. All taxes of all materials complete. |
| 9 | Rigid & smooth Centering & shuttering for RCC/PCC works including false work and dismentalling them after casting including cost & charges of all materials & cost of all labour complete . |
| 10 | Suplying , fitting & placing in position uncoated HYSD bar reinforcement for RCC work including cutting ,bending ,binding & placing in position including cost & conveyance to site etc. all taxes of MS/ TS Rod & binding wire 18to 20 gauge complete . |
| 11 | Providing and applying Tack coat with Straight run Bitumen on the prepared surface cleaned with mechanical broom as per Clause 503 of MoSRT&H Specification for Road & bridge works as per direction of Engineer- in- Charge |
| 12 | Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29,prepared by using mastic cooker and laid to required level and slope after clearing the surface including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size @ 0.005 cum pre 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 100 degree centigrade protruding 1 mm to 4 mm over mastic surface all complete as per clause 515 of MoSRT&H specification for road and bridge work (A/R P-186 Item-54) |
| 13 | Providing & Laying 80mm thick Factory made Chamfered edge Cement Concrete Paver Blocks of M-40 grade & required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete including cost of all materials, labour cess, etc.T & P required for the work complete in all respect as per direction of Engineer-in-charge. |
| 14 | Supplying all labour , T & P , etc. for preparation of Stainless Steel Board with ACP Sheet including writing charges & provision of photto graphs Pre, during & post etc. including cost of all materials & cost of all labour complete Please Enable Macros to View BoQ information |