| 1 | LAYING & CONSTRUCTION OF 4\\" NB STEEL PIPELINE LAYING & ASSOCIATED WORKS |
| 2 | PIPELINE LAYING IN NORMAL/ MIXED STRATA TERRAIN WITH NORMAL PCC&RCC / UNPREPARED SURFACE (KATCHA SURFACE) INCLUDING WELDING, RT, PREHYDRO, COATING, CLEANING, HYDROTESTING, SWABBING/DRYING, ALL WORK UPTO COMPLETION |
| 3 | 4\\" NB/ 6.4 MM (0.252\\")/ API 5L GR. B (ERW) |
| 4 | INSTALLATION/ CROSSING OF CARRIER PIPE BY HDD METHOD - NHAI CROSSING without casing Including utility survey, pre hydro testing etc. |
| 5 | 4\\" NB/ 6.4 MM (0.252\\")/ API 5L GR. B (ERW) |
| 6 | LIAISONING FOR LAYING WORKS AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES |
| 7 | Applying permission, follow-up, and getting permission from the statutory authorities, obtaining work permits/ NOC from various statutory authorities having jurisdiction before execution of the work and complying with all stipulations/ conditions/ recommendations of the said authorities. Only R.R. charges shall be paid by the Owner. This shall be applicable for any kind of permission/ approvals directly or indirectly required for execution of work. Local liasioning and work completion |
| 8 | ALL KIND OF PERMISSIONS (STEEL/ MDPE/ SV ETC…) |
| 9 | INSTALLATION OF CARRIER PIPE - CASED CROSSING NHAI |
| 10 | Cased Crossing by HDD 4 IN X 10 IN, Carrying out installation of 4\\" carrier pipe with 10inch casing at NHAI Raoad crossings at designated depths by HDD/jacking/augor boring (Including installation of casing pipes, casing pipe supply of material IS 3589 FE 410/ API 5L Gr. B or equivalent, all other consumables for welding,coating/painting, casing end closure and required material etc..)Note: Casing pipe to be supplied by contractor |
| 11 | PERMANENT ROUTE MARKERS |
| 12 | Permanent Markers supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint (powder coated), stencil letter cutting for numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner/Owner’s Representative |
| 13 | WARNING MARKER WITH POST (STEEL) |
| 14 | PIPELINE MARKER WITHOUT POST (CONCRETE/STONE) |
| 15 | TEMPORARY CATHODIC PROTECTION |
| 16 | 4\\" NB/ 6.4 MM (0.252\\")/ API 5L GR. B (ERW) |
| 17 | TLP installation on IJ as per requirements inclding supply TLP Box, 25mm&10mm cable, Zn anode 2nos, Spark gap arrester- 4\\" NB/ 6.4 MM (0.252\\")/ API 5L GR. B (ERW) |
| 18 | HOOK-UP with MDPE and steel cased crossing section |
| 19 | 4\\" NB/ 6.4 MM (0.252\\")/ API 5L GR. B (ERW) with MDPE TF 4\\"X90mm installation each section both side with end cap |
| 20 | RCC Works (M25) including shuttering & reinforcement steel (bar 12mm) or as per approved drawing |
| 21 | Brick Works with 12mm plaster both side (M 7.5) |
| 22 | PLAIN CEMENT CONCRETE (1:2:4) |
| 23 | STRUCTURAL WORKS (CASING VENT PIPE, SUPPORT, ETC..) Please Enable Macros to View BoQ information |