| 1 | Arrangement of Barricading of the site including all material, labour, etc. complete. |
| 2 | Making of roka in manhole including all required material like sand bags, safety equipments, labour, T&P etc. all complete. |
| 3 | Dismantling of C.C. road (10cm thick) including all Labours, T. & P., disposal of unserviceable material etc all complete. |
| 4 | Dismantling of C.C. road (25 cm thick) including all Labours, T. & P., disposal of unserviceable material etc all complete. |
| 5 | Excavation 0.0-1.5 mtr deep in soil mixed with moorum, shingle, kankar etc. |
| 6 | Excavation 1.5-3.0 mtr deep in soil mixed with moorum, shingle, kankar etc. |
| 7 | Excavation 3.0-4.5 mtr deep in soil mixed with moorum, shingle, kankar etc. |
| 8 | Dismantling of 300 mm dia RCC NP2 Hume Pipe Sewer |
| 9 | Bailing out or pump out subsoil water |
| 10 | Supply of 300 mm dia RCC NP3 hume pipe |
| 11 | Laying and jointing of 300 mm dia RCC NP3 hume pipe, |
| 12 | Laying and jointing of following dia RCC NP3 hume pipe 4 mtr deep. |
| 13 | Providing and Laying of cement concrete in 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 40mm nominal size) including supply of all material, labours and T&P etc. required for proper completion of the work |
| 14 | Class 150 (Non Modular) Brick Work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of work |
| 15 | Fixing C.I. footsteps in the walls. |
| 16 | 12mm thick plaster in 1:3 Cement and Coarse Sand in mortar including Supply of All Materials, Labours, T. & P. etc all complete |
| 17 | Providing and Laying of cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including supply of all material, labours and T&P etc. required for proper completion of the work. |
| 18 | Reinstatement of CC road surface (10cm) after laying of pipe line including 20 mm gauge approved stone ballast, coarse sand and cement in (4:2:1) over 100mm base concrete of 1:4:8 ( 1 Cement : 4 Fine Sand : 8 40mm stone Ballast), All Labours, T. & P. etc all complete. |
| 19 | Fixing of Manhole cover with CC in 1:2:4 including all supply of all material, labour, T&P etc complete. |
| 20 | Cleaning of site/ Disposal of malwa such as silt, garbage etc/ Photography of site. |
| 21 | Contigency for unseen work @ 2% |
| 22 | GST @ 18% Please Enable Macros to View BoQ information |