| 1 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) |
| 2 | In all type Soil AC/PVC/HDPE pipe |
| 3 | 50/63/75mm |
| 4 | 80/90mm |
| 5 | 100/110mm |
| 6 | 125/140mm |
| 7 | 150/160/180mm |
| 8 | 200/225mm |
| 9 | 250/280mm |
| 10 | 300/315mm |
| 11 | 350mm |
| 12 | 400mm |
| 13 | Add on above item no. 1 for B.T. Road = 5% |
| 14 | Add on above item no. 1 for C.C. Road = 10% |
| 15 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. = 20% |
| 16 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr.= 30% |
| 17 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 18 | In all type Soil |
| 19 | 100mm |
| 20 | 125mm |
| 21 | 150mm |
| 22 | 200mm |
| 23 | 250mm |
| 24 | 300mm |
| 25 | 350mm |
| 26 | 400mm |
| 27 | Add on above item no. 2 for B.T. Road = 5% |
| 28 | Add on above item no. 2 for C.C. Road = 10% |
| 29 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. = 20% |
| 30 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. = 30% |
| 31 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) |
| 32 | In all type Soil |
| 33 | 50/63/75mm |
| 34 | 80/90mm |
| 35 | 100/110mm |
| 36 | 125/140mm |
| 37 | 150/160/180mm |
| 38 | 200/225mm |
| 39 | 250/280mm |
| 40 | 300/315mm |
| 41 | 350mm |
| 42 | 400mm |
| 43 | Add on above item no. 3 for B.T. Road = 5% |
| 44 | Add on above item no. 3 for C.C. Road = 10% |
| 45 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. = 20% |
| 46 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. = 30% |
| 47 | Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) |
| 48 | In all type Soil |
| 49 | 80 mm |
| 50 | 100 mm |
| 51 | 125 mm |
| 52 | 150 mm |
| 53 | 200 mm |
| 54 | 250 mm |
| 55 | 300 mm |
| 56 | 350 mm |
| 57 | 400 mm |
| 58 | Add on above item no. 4 for B.T. Road = 5% |
| 59 | Add on above item no. 4 for CC Road = 10% |
| 60 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr = 20% |
| 61 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required = 20% |
| 62 | Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. |
| 63 | Add on above item no. 5 for B.T. Road = 5% |
| 64 | Add on above item no. 5 for CC Road = 10% |
| 65 | Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr = 20% |
| 66 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. |
| 67 | Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. Please Enable Macros to View BoQ information |