| 1 | Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. |
| 2 | In all type Soil |
| 3 | 75 MM |
| 4 | 90/80 mm |
| 5 | 110/100 mm |
| 6 | 140/125 mm |
| 7 | 180/160/150 MM |
| 8 | 225/ 200 MM |
| 9 | 250 MM |
| 10 | 300 MM |
| 11 | Add on above item no. 1 for B.T. Road = 5% |
| 12 | Add on above item no. 1 for CC Road = 10% |
| 13 | Add on above item no. 1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.= 20% |
| 14 | Add on above item no. 1 if depth of pipe line is above 3.0 mtr. = 30% |
| 15 | Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. |
| 16 | In all type Soil |
| 17 | 80 mm |
| 18 | 100 mm |
| 19 | 125 mm |
| 20 | 150 mm |
| 21 | 225/ 200 mm |
| 22 | 250 mm |
| 23 | 300 mm |
| 24 | Add on above item no. 2 for B.T. Road = 5% |
| 25 | Add on above item no. 2 for CC Road = 10% |
| 26 | Add on above item no. 2 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. = 20% |
| 27 | Add on above item no. 2 if depth of pipe line is above 3.0 mtr = 30% |
| 28 | Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 29 | In all type Soil |
| 30 | 80 mm dia pipe to 100mm |
| 31 | 125 mm dia pipe to 150mm |
| 32 | 200 mm dia pipe to 250mm |
| 33 | 300 mm dia pipe to 350mm |
| 34 | 400 mm |
| 35 | Add on above item no. 3 for B.T. Road = 5% |
| 36 | Add on above item no. 3 for CC Road = 10% |
| 37 | Add on above item no. 3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr = 20% |
| 38 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 39 | In all type Soil |
| 40 | 80 mm to 110 mm |
| 41 | 125 mm to 165 mm |
| 42 | 200 mm to 300 mm |
| 43 | Add on above item no. 4 for B.T. Road = 5% |
| 44 | Add on above item no. 4 for CC Road = 10% |
| 45 | Add on above item no.4 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr = 20% |
| 46 | Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 47 | In all type Soil |
| 48 | 80 mm to 100 mm |
| 49 | 125 mm to 150 mm |
| 50 | 200 mm to 300 mm |
| 51 | 350 mm to 450 mm |
| 52 | 500 mm to 600 mm |
| 53 | Add on above item no.5 for B.T. Road = 5% |
| 54 | Add on above item no.5 for CC Road = 10% |
| 55 | Add on above item no.5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr = 20% |
| 56 | Labour charges for removal of complaint of polluted water supply to the consumers |
| 57 | Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours |
| 58 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size |
| 59 | In all type Soil |
| 60 | 50 to 75 mm |
| 61 | 80-110 mm |
| 62 | 125 to 165 mm |
| 63 | 200 to 300 mm |
| 64 | 350 to 400 mm |
| 65 | Add on above item no.7.2 for B.T. Road = 5% |
| 66 | Add on above item no.7.2 for CC Road = 10% |
| 67 | Add on above item no. 7.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. = 20% |
| 68 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size |
| 69 | In all type Soil |
| 70 | 80-100 mm |
| 71 | 125 to 150 mm |
| 72 | 200 to 300 mm |
| 73 | 350 to 400 mm |
| 74 | Add on above item 8.3 for B.T. Road = 5% |
| 75 | Add on above item no. 8.3 for CC Road = 10% |
| 76 | Add on above item no.8.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.= 20% |
| 77 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. |
| 78 | Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. Please Enable Macros to View BoQ information |