| 1 | LABOUR |
| 2 | (1109) Erection of Anchor clamp / dead endclamp for LT ABC of any size |
| 3 | (1110) Erection of suspension clamp for LTABC of any size |
| 4 | (1105) Stringing of 1.1 kV Aerial bunchedcable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messengerthrough existing poles |
| 5 | (1119) Installation of Insulation piercingconnector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 6 | (1115) Installing One No. Insulation piercingconnector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 7 | (1142) Singe Phase Satellite connectors upto 4service main connections (25-95ABC/2.5-25 sqmm SM wire-2No) |
| 8 | (1126) Installation of Pre-insulated lugs for16sqmm |
| 9 | (1128) Installation of Pre-insulated lugs for50sqmm |
| 10 | (1129) Installation of Pre-insulated lugs for70sqmm |
| 11 | (1134) Providing End Caps |
| 12 | (1116) Installation of Insulation piercingconnector for main to service line main:16-95 sqmm, Tap : 4-35 sqmm |
| 13 | (702) Labour charges for loading HT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 14 | (706) Labour charges for loading LT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 15 | (726) Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4numbers of poles excluding loading& unloading charges. |
| 16 | (264) Insertion of one LT PSC pole in existingsingle phase OH line including digging& back filling pit in ordinary soil, fittingcross arm, insulator, binding etc.excluding transportation of poles. |
| 17 | (265) Insertion of one LT PSC pole in existingthree phase OH line including digging &back filling pit in ordinary soil, fittingcross arm, insulator, binding etc.excluding transportation of poles. |
| 18 | (204) Erecting one LT PSC Pole in positionincluding digging & back filling pit inordinary soil. |
| 19 | (205) Providing Stay for LT poles includingdigging & back filling pit in ordinarysoil. |
| 20 | (451) Disconnecting and lowering down thesingle phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 21 | (452) Disconnecting and lowering down thethree phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 22 | (407) Renewal of existing damaged/broken oldLT stay in existing stay rod. |
| 23 | (186) Insertion of one HT PSC pole in existingHT/LT line including digging & backfilling of pit in ordinary soil, fitting crossarm, insulator, binding etc. , drawingsufficient length of GI earth leads to theground for earthing (excluding provisionof earthing). |
| 24 | (119) Fitting and providing one HT Stay for11kV pole, including digging and backfilling pit in ordinary soil. |
| 25 | (206) Providing Strut using LT PSC poleincluding digging and back filling pit inordinary soil. |
| 26 | (402) Renewal of existing damaged/old LTPSC/RCC (single phase line) pole withnew PSC pole in place includingexcavation of pole pit, erection of newpole, backfilling pit and refitting of allitems except street light fitting etc. andconveyance of all materials except pole. |
| 27 | (404) Renewal of existing damaged/old LTPSC/RCC (three phase line) pole withnew PSC pole in place including excavation of pole pit, erection of newpole, backfilling pit and refitting of allitems except street light fitting etc. andconveyance of all materials except pole. |
| 28 | (565) Dismantling (without damage) one kmLT single phase 2 wire OH lineconductor by dismantling cross arms,insulators and stacking the conductors inrolls properly. |
| 29 | (566) Dismantling (without damage) one kmLT three phase 4 wire OH line conductorby dismantling cross arms, insulatorsand stacking the conductors in rollsproperly. |
| 30 | (567) Dismantling (without damage) one kmLT additional conductor line bydismantling cross arms, insulators andstacking the conductors in rolls properly. |
| 31 | Total of BoQ1 Please Enable Macros to View BoQ information |