Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | TENDER SUMMARY FOR INDORE METRO RAIL PROJECT |
| 2 | IN-E (Escalators)inclusive of all taxes and duties, except GST(brought from PriceBid) |
| 3 | IN-L (Lifts)inclusive of all taxes and duties, except GST(brought from PriceBid) |
| 4 | GST/IGST (brought from Annexure-A_Tax-Duty_Breakup) PREAMBLE FOR SUBMISSION OF PRICES ON E-TENDER PORTAL (www.etenders.gov.in/eprocure/app) SN PARTICULARS 1.0 The Bidder to quote bid price(s) in respective field(s) of 'Statement 2' of Lifts and Escalator separately. Price(s) quoted anywhere else other than in respective fields shall not be given cognizance and shall not be evaluated. 2.0 Currency of Quote shall be INR only. 3.0 The bid price for each equipment shall be for one unit price only (rounded off to zero decimal). 4.0 The bid price shall be inclusive of all Central / State / Local Taxes (except GST, which will be paid extra as applicable), duties, custom duty, levies, cess, and all other incidental charges required to fulfil the tender conditions including statutory deductions viz TDS towards Income Tax / GST / Labour cess and any other taxes etc. 5.0 The Bid price for other statements such as Statement 1, Statement 3, Statement 4 and Shatement 5, shall be automatically derived from the quoted price in Statement 2, based on predefined percentage. 6.0 The Bidder has to quote bid price(s) in respective field(s) of Statement 6A, 6B and 6C. However, prices stated in these statements shall not be considered for price bid evaluation. 7.0 The Bidder has to provide required details in Appendix-13A - Statement of Deviation. In case, there is no deviation, same should be incoporated in the statement. 8.0 The Bidder has to provide the tax details in Annexure-A. FINANCIAL BID: SCHEDULE OF RATES AND PRICES - TENDER TOTAL (TT) Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company: 0.0 SCHEDULE OF RATES AND PRICES SN Statement Schedule Description TOTAL QUOTED AMOUNT Quoted Amount In INR INR 1.0 Statement E1 General Requirement, Preliminary design and Definitive Design including Prototype & Type test of Escalators 0.0 2.0 Statement E2 GAD, Manufacture, Supply, Installation, Testing and Commissioning (Including Integrate Testing & Commissioning) of Escalator 0.0 3.0 Statement E3 Training, O&M documentation, As built drawings and Testing/Inspection Items for Escalator 0.0 4.0 Statement E4 Defect Liability Period for 2 years including DLP Maintenance Spares and Consumables for Escalator 0.0 5.0 Statement E5 Comprehensive Annual Maintenance Charges for 3 years beyond Defect Liability Period including Spares & consumables for Escalator 0.0 6.0 Statement L1 General Requirement, Preliminary design and Definitive Design including Prototype & Type test of Lifts 0.0 7.0 Statement L2 GAD, Manufacture, Supply, Installation, Testing and Commissioning (Including Integrate Testing & Commissioning) of Lifts 0.0 8.0 Statement L3 Training, O&M documentation, As built drawings and Testing/Inspection Items for Lifts 0.0 9.0 Statement L4 Defect Liability Period for 2 years including DLP Maintenance Spares and Consumables for Lifts 0.0 10.0 Statement L5 Comprehensive Annual Maintenance Charges for 3 years beyond Defect Liability Period including Spares & consumables for Lifts 0.0 TENDER TOTAL PRICE (Including all taxes and duties, except GST) 0.0 INR Zero Only Add GST@18% 0.0 TENDER TOTAL (Including all taxes and duties) 0.0 INR Zero Only IN-E: Grand Summary (Bid Price) Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company: 0.0 The Contract is Lump Sum price with price adjustment as per GCC/SCC - Volume II. S.No Statement of Price General Summary Total Amount (INR) 1.0 IN-E1Statement 1 General Requirement, Preliminary design and Definitive Design including Prototype & Type test of Escalators 0.0 2.0 IN-E2Statement 2 GAD, Manufacture, Supply, Installation, Testing and Commissioning (Including Integrate Testing & Commissioning) of Escalators 0.0 3.0 IN-E3Statement 3 Training, O&M documentation, As built drawings and Testing/Inspection Items for Escalators 0.0 4.0 IN-E4Statement 4- Defect Liability Period for 2 years including DLP Maintenance Spares and Consumables for Escalators 0.0 5.0 IN-E5Statement 5 Comprehensive Annual Maintenance Charges for 3 years beyond Defect Liability Period including Spares & consumables for Escalators 0.0 Total of Statement 1, 2, 3, 4, 5 (Including all taxes and duties, except GST) 0.0 Add GST@18% 0.0 Total of Statement 1, 2, 3, 4, 5 (Including all taxes and duties) 0.0 IN-E1: Statement of PriceStatement No.1: General Requirement, Preliminary design and Definitive Design including Prototype & Type test of Heavy Duty Escalators Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company: 0.0 Cost Center 1 (Statement 1) Description Unit Rate in figures (inclusive of all taxes and duties, except GST) In INR % out of total Escalators Grand sum bid price 1.0 General Requirements 0.0 0.03 2.0 Preliminary design 0.0 3.0 Complete Definitive Design including Prototype & Type test for Escalators 0.0 0.035 Total of IN Statement E1 carried forward to Grand Summary 0.0 0.065 NOTE 1.0 The amount of statement 1, is stated 6.5% of the Total Bidding Amount of IN E Sum, derived from quoted price of Statement 2. IN-E2: Statement of PriceStatement No. 2 GAD, Manufacture, Supply, Installation, Testing and Commissioning (Including Integrated Testing & Commissioning) of Heavy Duty Escalators Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company: 0.0 Cost Center 2 (Statement 2) Description Unit Quantity Unit Rate in figures (Including all taxes and duties, except GST) of respective items to be entered by Bidder In INR Amount (Including all taxes and duties, except GST) in INR A1 Escalators without IMS (Intermediate Support) 1.0 5.0 Meter Vertical Rise Stainless Steel Balustrade Nos. 1.0 0.0 2.0 6.0 Meter Vertical Rise Glass Balustrade Nos. 1.0 0.0 3.0 7.0 Meter Vertical Rise Glass Balustrade Nos. 1.0 0.0 TOTAL of A1 Escalators Nos. 3.0 0.0 A2 Escalators with IMS (Intermediate Support) 1.0 5.0 Meter Vertical Rise Stainless Steel Balustrade Nos. 1.0 0.0 2.0 6.0 Meter Vertical Rise Glass Balustrade Nos. 39.0 3.0 7.0 Meter Vertical Rise Glass Balustrade Nos. 3.0 0.0 4.0 8.0 Meter Vertical Rise Stainless Steel Balustrade Nos. 1.0 0.0 5.0 9.0 Meter Vertical Rise Stainless steel Balustrade Nos. 6.0 0.0 6.0 10.0 Meter Vertical Rise Stainless Steel Balustrade Nos. 7.0 0.0 7.0 10.0 Meter Vertical Rise Glass Balustrade Nos. 4.0 0.0 8.0 11.0 Meter Vertical Rise Stainless Steel Balustrade Nos. 3.0 0.0 9.0 12.0 Meter Vertical Rise Glass Balustrade Nos. 4.0 10.0 13.0 Meter Vertical Rise Glass Balustrade Nos. 4.0 0.0 TOTAL of A2 Escalators Nos. 72.0 0.0 TOTAL of Escalators (A1 + A2) 75.0 0.0 Total of IN Statement E2 (A1 + A2) to be carried forward to Grand Summary 0.0 NOTE: 1.0 The bidder has to quote against each item. This amount is 84% of the Total Bid Value and other E statements amount is derived from Total Bid Value of Statement 2 of EnM 2.0 5 meters of travel height means 4.50 < travel height ≤ 5.5 m and so on for other rises. 3.0 In case of any variation in rise of Escalator, the price shall be derived by formula mentioned in sub-clause 1.2.9 of Pricing Document. 4.0 Unit rates will not vary in case of increase/decrease in quantities subject to the maximum of ± 25% of the tendered quantities (Lift / Escalator). Please refer Clause 1.2.9. of Pricing Document. 5.0 The above rates also include port handling, custom clearance, Local Transportation, Insurance and other incidental services. 6.0 The payment shall be made as per the milestone stated in the Pricing Document. 7.0 The price offered shall include the cost of minor adjustment in the Escalator Design, shaft length, rise, IMS location, necessitated as per the actual site data/condition. IN-E3: Statement of PriceStatement No. 3: Training, O&M documentation, As built drawings and Testing/Inspection Items for Escalators Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company : 0.0 Cost Center 3 (Statement 3) Description Unit Qty Unit Rate in figures (Including all taxes and duties, except GST) In INR Amount (Including all taxes and duties, except GST) in INR % out of total EnM Grand Sum bid price 1.0 Training, Manual & As-built drawings a Training at manufacturers place for Design, Installation and testing practices of Escalators including Major functions, safety features, Operation and Monitoring of 10 Employer's staff for 10 trainer days inclusive of travel, boarding and lodging expenses. LS 1.0 0.0 0.0 0.0015 b Training at suitable site location for Escalators system, Operation and maintenance practices, Maintenance infrastructure, Emergency handling, Preventive Maintenance & Corrective Maintenance, CBM etc.,of 20 Employer's staff for 10 trainer days LS 1.0 0.0 0.0 0.0005 c Submission of Training Manuals, O & M Documents etc., to meet Employer's requirement. LS 1.0 0.0 0.0 0.001 d As-built drawings LS 1.0 0.0 0.0 0.002 0.005 2.0 Testing at Manufacture location to witness by Employer / Employer's Representative a Escalators Prototype Testing (Domestic or Abroad) for 6 Persons for 1 week shall be considered, inclusive of Visa, travel, boarding and lodging expenses. LS 1.0 0.0 0.0 0.005 b Escalators (Domestic) Factory Acceptance Testing, Type test for 2 Persons for 2 days shall be considered, inclusive of travel, boarding and lodging expenses. No of Trips 15.0 0.0 0.0 0.005 0.01 Total of IN Statement E 3 to be carried forward to Grand Summary 0.0 0.015 NOTE: 1.0 The amount of statement 3, is stated 1.50% of the Total Bidding Amount of IN E Sum, derived from quoted price of Statement 2. 2.0 In case fewer persons attend the Training/Testing or the number of trainer days is reduced, the cost shall be reduced proportionately, and vice versa. 3.0 If the VHTS equipment Type test/FAT test is conducted in Foreign country, all the expenditure incurred for Visa, travel, lodging & boarding will be borne by the Employer. IN-E4: Statement of PriceStatement No. 4: Defect Liability Period for 2 years including DLP Maintenance Spares and Consumables for Escalators Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company : 0.0 Cost Center 4(Statement 4) Period Quantity Period (Quarterly) Unit Rate in figures (Including all taxes and duties, except GST) In INR Total Price (Including all taxes and duties, except GST) in INR % out of total EnM Grand Sum bid price A Escalators 1.0 DLP for Escalators 75.0 8.0 0.0 0.0 0.02 Total for Two years 0.0 0.02 Total of IN Statement E 4 to be carried forward to Grand Summary 0.0 0.02 Note: 1.0 The amount of statement 4, is stated 2% of the Total Bidding Amount of IN E Sum derived from quoted price of Statement 2. 2.0 Payment for DLP will be made on quarterly basis upon receipt of inspection and maintenance reports endorsed by the Employer. 3.0 The maintenance cost shall include cost of labour, all consumable, spares materials and all other Contractor's obligations and responsibilities during the Maintenance for two years. 4.0 Scope of maintenance shall be as per Volume-III (Employer’s Requirements) & Volume-IV (Technical Specifications) and work shall be done as per approved maintenance manual. 5.0 The maintenance cost shall include the consumables including oil, lubricants, rubber parts, cleaning devices and cleaning agents, and scheduled replacement parts as per approved Maintenance manuals during preventive maintenance, etc. 6.0 This statement includes cost of all preventive and breakdown maintenance due to any reasons. The cost of parts to be scheduled replacement during preventive maintenance as per approved Maintenance manuals shall be included in this statement. 7.0 The Contractor shall bear the cost of spare parts required for breakdowns attributable to the Contractor. For breakdowns attributable to the Employer, the cost of spare parts shall be borne by the Employer on the basis of actual consumption. 8.0 This statement will be taken into account for the purpose of comparative evaluation. 9.0 The Contractor shall keep all spare parts at its own cost, throughout the DLP period to enable rapid replacement of any items. IN-E5: Statement of PriceStatement No. 5 Comprehensive Annual Maintenance Charges for 3 years beyond Defect Liability Period including Spares & consumables for Escalators Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company : 0.0 Cost Center 5(Statement 5) Period Quantity Period (Quarterly) Unit Rate in figures (Including all taxes and duties, except GST) In INR Amount (Including all taxes and duties, except GST) in INR % out of total Lifts Grand Sum bid price A Escalators 1.0 1st Year after DLP 75.0 4.0 0.0 0.0 0.02 2.0 2nd Year after DLP 75.0 4.0 0.0 0.0 0.02 3.0 3rd Year after DLP 75.0 4.0 0.0 0.0 0.02 Total for Three years 0.0 0.06 Total of IN Statement E 5 to be carried forward to Grand Summary 0.0 0.06 NOTE 1.0 Proposal for Maintenance team for the above CAMC period to be submitted by the Contractor in compliance to tender conditions. 2.0 The amount of statement 5, is stated 6 % of the Total Bidding Amount of IN E Sum, derived from quoted price of Statement 2. 3.0 Contract spares & consumables shall be in line with conditions defined in Employer's Requirements & Techincal Specifications. It shall be sufficient to cover the maintenance requirements during DLP and until the end of CAMC under normal operation & maintenance conditions. 4.0 Employer may award the CAMC to the successful tenderer for 3 years beyond DLP at these rates. 5.0 Payment for CAMC will be made on quarterly basis on completion of maintenance obligations by the Contractor. 6.0 Scope of maintenance shall be as per Volume-III (Employer’s Requirements) & Volume-IV (Technical Specifications) and work shall be done as per approved maintenance manual after completion of DLP. 7.0 The maintenance cost shall include cost of labour, all consumables, spares materials required and all other Contractor's obligations and responsibilities during the Annual Maintenance for three years. 8.0 The consumables shall include oil, lubricants, rubber parts, cleaning devices and cleaning agents, and scheduled replacement parts as per approved Maintenance manuals during preventive maintenance, etc. 9.0 This statement includes cost of all preventive, corrective and breakdown maintenance due to any reasons. The cost of the scheduled part replacement during preventive maintenance as per approved Maintenance manuals shall be included in this statement. 10.0 The Contractor shall keep all spare parts at its own cost, throughout the CAMC period to enable rapid replacement of any items. 11.0 The Contractor shall bear the cost of spare parts required for breakdowns attributable to the Contractor. For breakdowns attributable to the Employer, the cost of spare parts shall be borne by the Employer on the basis of actual consumption. IN-L: Grand Summary (Bid Price) Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company : 0.0 The Contract is Lump Sum price with price adjustment as per GCC/SCC - Volume II. SN Statement of Price General Summary Amount (Including all taxes and duties, except GST) in INR 1.0 IN-L1 Statement 1- General Requirement, Preliminary design and Definitive Design including Prototype & Type test of Lifts 0.0 2.0 IN-L2 Statement 2- GAD, Manufacture, Supply, Installation, Testing and Commissioning (Including Integrate Testing & Commissioning) of Lifts 0.0 3.0 IN-L3 Statement 3- Training, O&M documentation, As built drawings and Testing/Inspection Items for Lifts 0.0 4.0 IN-L4 Statement 4- Defect Liability Period for 2 years including DLP Maintenance Spares and Consumables for Lifts 0.0 5.0 IN-L5 Statement 5- Comprehensive Annual Maintenance Charges for 3 years beyond Defect Liability Period including Spares & consumables for Lifts 0.0 Total of Statement 1, 2, 3, 4, 5 (Including all taxes and duties, except GST) 0.0 Add GST@18% 0.0 Total of Statement 1, 2, 3, 4, 5 (Including all taxes and duties) 0.0 IN-L1: Statement of PriceStatement No.1: General Requirement, Preliminary design and Definitive Design including Prototype & Type test of Heavy-Duty Machine Room-Less & Gear-Less Lifts Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company: 0.0 Cost Center 1 (Statement 1) Description Unit Rate in figures (Including all taxes and duties, except GST) In INR % out of total Lifts Grand Sum bid price 1.0 General Requirements 0.0 0.015 2.0 Preliminary design 0.0 0.015 3.0 Complete Definitive Design including Prototype & Type test for Lifts 0.0 0.035 Total of Statement L1 to be carried forward to Grand Summary 0.0 0.065 NOTE 1.0 The amount of statement 1, is stated 6.50 % of the Total Bidding Amount of IN L Sum, derived from quoted price of Statement 2 IN-L2: Statement of Price Statement No. 2 GAD, Manufacture, Supply, Installation, Testing and Commissioning (Including Integrate Testing & Commissioning) of Heavy-Duty Machine Room-Less & Gear-Less Lifts Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company : 0.0 Cost Center 2 (Statement 2) Description Unit Quantity Unit Rate in figures (Including all taxes and duties, except GST) of respective items to be Entered by Bidder In INR Amount (Including all taxes and duties, except GST) in INR A 13 P/1000 Kg Lifts Door Type Centre Opening Power Door 1.0 Upto 7 metre Travelling Height, 2 stops, SS door (Hanging / Non Hanging) Nos. 9.0 0.0 2.0 From 8 metre to 12 metre Travelling Height, 2 stops, SS door (Hanging / Non Hanging) Nos. 15.0 0.0 3.0 From 8 metre to 12 metre Travelling Height, 2 stops, SS door (Hanging / Non Hanging) Through car Nos. 5.0 0.0 4.0 From 13 metre to 17 metre Travelling Height, 2 stops, SS door (Hanging / Non Hanging) Nos. 5.0 0.0 5.0 From 18 metre to 23 metre Travelling Height, 3 stops, SS door (Hanging / Non Hanging) Nos. 2.0 0.0 6.0 From 24 metre to 25 metre Travelling Height, 3 stops, SS door (Hanging / Non Hanging) Nos. 2.0 0.0 B 26 P/1800 Kg Lifts Doors - Centre Opening Power Door 1.0 From 7 metre to 11 metre Travelling Height, 2 stops, SS door (Hanging / Non Hanging) Nos. 1.0 0.0 2.0 From 18 metre to 23 metre Travelling Height - 2 stops, SS door (Hanging / Non Hanging) Nos. 1.0 0.0 TOTAL of A + B Nos. 40.0 0.0 C Additional landing - Stainless Steel door (2 Hr Fire rating) Includes Supply and Installation with all connected accessories. Nos. 10.0 0.0 Total of Statement L2 to be carried forward to Grand Summary 0.0 NOTE: 1.0 The amount that can be apportioned in Statement 2, shall be 84% of Escalator and Moving walk total grand sum (Bid Price). For Cost Break up, refer Volume-VII. 2.0 5 meters of travel height means 4.50 < travel height ≤ 5.5 m and so on for other rises. 3.0 In case of any variation in rise of Lifts, the price shall be derived by formula mentioned in sub-clause 1.2.9 of Pricing Document. 4.0 Unit rates will not vary in case of increase/decrease in quantities subject to the maximum of ± 25% of the tendered quantities (Lift / Escalator). Please refer Clause 1.2.9. of Pricing Document. 5.0 The above rates also includes port handling, custom clearance, Local Transportation, Insurance and other incidental services. 6.0 The payment shall be made as per the milestone achieved. 7.0 The price offered shall include the cost of minor adjustment in the Lift Design, vertical height, shaft dimension and necessitated as per the actual site data/condition. 8.0 For rise more than 11 m in between two level, emergency landing (if required according to relevant standard) shall be included in the above statement. 9.0 Rate of Additional Landing shall include all necessary Electrical safety locks /Switches, Harness, all components and associated sub-system required to provide complete landing door system with all operational, Control and Safety features. IN-L3: Statement of Price Statement No. 3: Training, O&M documentation, As built drawings and Testing/Inspection Items of Heavy-Duty Machine Room-Less & Gear-Less Lifts Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company : 0.0 Cost Center 3 (Statement 3) Description Unit Qty Unit Rate in figures (Including all taxes and duties, except GST) In INR Amount (Including all taxes and duties, except GST) in INR % out of total Lifts Grand Sum bid price 1.0 Training, Manual & As-built drawings a Training at manufacturers place for Design, Installation and testing practices of Lifts including Major functions, safety features, Operation and Monitoring of 10 Employer's staff for 10 trainer days inclusive of travel, boarding and lodging expenses. LS 1.0 0.0 0.0 0.0015 b Training at suitable site location Lifts system, Operation and maintenance practices, Maintenance infrastructure, Emergency handling, Preventive Maintenance & Corrective Maintenance, CBM etc.,of 20 Employer's staff for 10 trainer days LS 1.0 0.0 0.0 0.0005 c Submission of Training Manuals, O & M Documents etc., to meet Employer's requirement. LS 1.0 0.0 0.0 0.001 d As-built drawings LS 1.0 0.0 0.0 0.002 0.005 2.0 Testing at Manufacture location to witness by Employer / Employer's Representative a Lift Prototype Testing (Domestic or Abroad) for 6 Persons for 1 week shall be considered, inclusive of Visa, travel, boarding and lodging expenses. LS 1.0 0.0 0.0 0.003 b Lifts domestic Factory Acceptance Testing, Type test for 2 Persons for 2 days shall be considered, inclusive of travel, boarding and lodging expenses. No of Trips 8.0 0.0 0.0 0.007 0.01 Total of Statement L3 to be carried forward to Grand Summary 0.0 0.015 NOTE: 1.0 The amount of statement 3, is stated 1.50 % of the Total Bidding Amount of IN L Sum, derived from quoted price of Statement 2. 2.0 In case fewer persons attend the Training/Testing or the number of trainer days is reduced, the cost shall be reduced proportionately, and vice versa. 3.0 If the VHTS equipment Type test/FAT test is conducted in Foreign country, all the expenditure incurred for Visa, travel, lodging & boarding will be borne by the Employer. IN-L4: Statement of PriceStatement No. 4: Defect Liability Period for 2 years including DLP Maintenance Spares and Consumables for Lifts Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company : 0.0 Cost Center 4(Statement 4) Period Quantity Period (Quarterly) Unit Rate in figures (Including all taxes and duties, except GST) Amount (Including all taxes and duties, except GST) in INR % out of total Lifts Grand Sum bid price 1.0 DLP for Lifts 40.0 8.0 0.0 0.0 0.02 Total for Two years 0.0 0.02 Total of Statement L4 to be carried forward to Grand Summary 0.0 0.02 Note 1.0 The amount of statement 4, is stated 2 % of the Total Bidding Amount of IN L Sum derived from quoted price of Statement 2. 2.0 Payment for DLP will be made on quarterly basis upon receipt of inspection and maintenance reports endorsed by the Employer. 3.0 The maintenance cost shall include cost of labour, all consumable, spares materials and all other Contractor's obligations and responsibilities during the Maintenance for two years. 4.0 Scope of maintenance shall be as per Volume-III (Employer’s Requirements) & Volume-IV (Technical Specifications) and work shall be done as per approved maintenance manual. 5.0 The maintenance cost shall include the consumables including oil, lubricants, rubber parts, cleaning devices and cleaning agents, and scheduled replacement parts as per approved Maintenance manuals during preventive maintenance, etc. 6.0 This statement includes cost of all preventive and breakdown maintenance due to any reasons. The cost of parts to be scheduled replacement during preventive maintenance as per approved Maintenance manuals shall be included in this statement. 7.0 The Contractor shall bear the cost of spare parts required for breakdowns attributable to the Contractor. For breakdowns attributable to the Employer, the cost of spare parts shall be borne by the Employer on the basis of actual consumption. 8.0 This statement will be taken into account for the purpose of comparative evaluation. 9.0 The Contractor shall keep all spare parts at its own cost, throughout the DLP period to enable rapid replacement of any items. IN-L5: Statement of Price Statement No. 5 Comprehensive Annual Maintenance Charges for 3 years beyond Defect Liability Period including Spares & consumables of Lifts Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN 12 Name of the Bidder/ Bidding Firm / Company : 0.0 Cost Center 5(Statement 5) Period Quantity Period (Quarterly) Unit Rate in figures (Including all taxes and duties, except GST) Total Amount (Including all taxes and duties, except GST) in INR % out of total Lifts Grand Sum bid price Escalators 1.0 1st Year after DLP 40.0 4.0 0.0 0.0 0.02 2.0 2nd Year after DLP 40.0 4.0 0.0 0.0 0.02 3.0 3rd Year after DLP 40.0 4.0 0.0 0.0 0.02 Total for Three years 0.0 0.06 Total of Statement L5 to be carried forward to Grand Summary 0.0 0.06 NOTE 1.0 Proposal for Maintenance team for the above CAMC period to be submitted by the Contractor in compliance to tender conditions. 2.0 The amount of statement 5, is stated 6 % of the Total Bidding Amount of IN L Sum, derived from quoted price of Statement 2. 3.0 Contract spares & consumables shall be in line with conditions defined in Employer's Requirements & Techincal Specifications. It shall be sufficient to cover the maintenance requirements during DLP and until the end of CAMC under normal operation & maintenance conditions. 4.0 Employer may award the CAMC to the successful tenderer for 3 years beyond DLP at these rates. 5.0 Payment for CAMC will be made on quarterly basis on completion of maintenance obligations by the Contractor. 6.0 Scope of maintenance shall be as per Volume-III (Employer’s Requirements) & Vol-IV (Technical Specifications) and work shall be done as per approved maintenance manual after completion of DLP. 7.0 The maintenance cost shall include cost of labour, all consumable, spares materials required and all other Contractor's obligations and responsibilities during the Annual Maintenance for three years. 8.0 The consumables shall include oil, lubricants, rubber parts, cleaning devices and cleaning agents, and scheduled replacement parts as per approved Maintenance manuals during preventive maintenance, etc. 9.0 This statement includes cost of all preventive and breakdown maintenance due to any reasons. The cost of parts to be scheduled replacement during preventive maintenance as per approved Maintenance manuals shall be included in this statement. 10.0 The Contractor shall bear the cost of spare parts required for breakdowns attributable to the Contractor. For breakdowns attributable to the Employer, the cost of spare parts shall be borne by the Employer on the basis of actual consumption. IN-L6 : Statement of Price Statement No. 6 Differential Cost (plus/minus) for Doors - Includes Supply and Installation with all connected accessories of Lifts Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company : 0.0 Statement No.6A Differential Cost (plus/minus) for Through Door Arrangement Lifts- Includes Supply and Installation with all connected accessories. SN Additional Items Unit Qty. Unit Rate in figures (Including all taxes and duties, except GST) of respective items to be Entered by Bidder In INR Amount (Including all taxes and duties, except GST) in INR 1.0 Stainless steel Through-Door Honeycomb finish arrangement for 13- Passenger Lift (2 Hr Fire rating) No 1.0 0.0 2.0 Stainless steel Through-Door Honeycomb finish arrangement for 26- Passenger Lift (2 Hr Fire rating) No 1.0 0.0 3.0 Glass through Door with SS Honeycomb finish frames arrangement for 13-Passenger Lifts (1 Hr Fire rating) No 1.0 0.0 TOTAL 0.0 Statement No.6B Differential Cost (plus/minus) for Addition / Deletion of Landing Door- Includes Supply and Installation with all connected accessories. SN Additional Items Unit Qty. Unit Price(Including all taxes and duties, except GST) in INR Total Amount (Including all taxes and duties, except GST) in INR 1.0 Differential Cost (plus/minus) for Additional/Deletion of stop / landing - Glass door with SS Honeycomb finish frames (1 Hr Fire rating) for 13- Passenger Lift No 1.0 0.0 TOTAL 0.0 Statement No.6C Differential Cost (plus/minus) for change from Stainless Steel to Glass Door -Includes Supply and Installation with all connected accessories. SN Additional Items Unit Qty. Unit Price(Including all taxes and duties, except GST) in INR Total Amount (Including all taxes and duties, except GST) in INR 1.0 Stainless steel Landing Door to Glass Landing Door No 1.0 0.0 2.0 Stainless steel Car Door to Glass Car Dor No 1.0 0.0 TOTAL 0.0 Note 1. This statement will not be considered for comparative evaluation of Price Bid. 2. The price quoted in this statement shall be Including all taxes and duties, except GST. Pricing for Unqualified Withdrawal of Conditions, Qualifications, Deviations etc.(Appendix 13A : Statement of Deviations) Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN-12 Name of the Bidder/ Bidding Firm / Company : 0.0 Item Condition, Qualification, Deviation etc. Key date affected by each condition, qualification, deviation etc. Increase or Decrease for unqualified withdrawal of each conditions, qualification, deviation etc. INR Statement No Total 0.0 Note: 1.0 In this Appendix, the Tenderer shall indicate every key date that will be affected by each remark, comment, condition, qualifications or deviation, etc. that has been specified in Appendix-13 Vol-I. 2.0 Prices for unqualified withdrawal of each remark, comment, condition, qualifications or deviation, etc. that has been specified in Appendix 13 Vol-I shall be quoted in this Appendix, clearly indicating the Statement No. to which it will be allocated. The 'Lump Sum Price' quoted by the Tenderer in 'TT' Page shall not include the Price for withdrawal of remark, comment, condition, qualifications or deviation etc. quoted in this Appendix. 3.0 In case price for unqualified withdrawal of any remark, comment, condition, qualification or deviation etc. indicated in Appendix-13 of Vol-1 is not quoted in Appendix, it shall be considered that the remark, comment, condition, qualification or deviation is unconditionally withdrawn without any financial implication. However, Employer at its sole discretion and option may assess the financial implication of the said remark, comment, condition, qualification or deviation etc. based on best engineering principles and concepts, which shall be binding on the Tenderer, and the same may be considered by Employer for Price Bid evaluation. 4.0 It is certified that Annexure annexed in Technical Bid (First envelope) is a \\"TRUE COPY\\" (with prices left blank) of the said Annexure in the Price Bid (Second envelope).\\" Annexure-A Statement of Tax Breakup Tender Inviting Authority: Madhya Pradesh Metro Rail Corporation Limited Name of Work: \\"Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy-Duty Machine Room-Less & Gear-Less Lifts and Heavy-Duty Escalators along with two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) for Indore Metro Rail Project\\" Contract No: IN 12 Name of the Bidder/ Bidding Firm / Company: 0.0 Annexure-AStatement of Tax Breakup Item No. Quoted Bid Price without Taxes and Duties Taxes, Duties, Levies etc. (Rate in % and Amount in INR) Total Amount of all Taxes / Duties / Levies / CessINR Quoted Bid Price inclusive of Taxes and Duties Custom Duty Goods and Service tax (GST) Any other Taxes / Duties / Levies / Labour Cess etc. Basic Custom Duty Social Welfare Surcharges IGST CGST SGST IGST Rate (%) Amount Rate (%) Amount Rate (%) Amount Rate (%) Amount Rate (%) Amount Rate (%) Amount Rate (%) Amount (A) (B) (C) (D) (E) = (B) + (C) + (D) (F) = (A) + (E) IN E 1 0.0 0.0 IN E 2 0.0 0.0 IN E 3 0.0 0.0 IN E 4 0.0 0.0 IN E 5 0.0 0.0 IN L1 0.0 0.0 IN L2 0.0 0.0 IN L3 0.0 0.0 IN L4 0.0 0.0 IN L5 0.0 0.0 Total 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
| 8 | Click here to download tender document | Tender Documents |
| 9 | Click here to download tender document | Tender Documents |
| 10 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail