Name of Work:- Placing of Tetrapods in the alignment of Breakwater at Hut Bay.
Sl. No.
Item Description
1
Loading, conveying and placing the tetrapods weighing 8T from casting yards to breakwater site and placing the same in two layers as per the approved design in the seaside of breakwater to form the armour layers to breakwater as directed by the EIC including the transportation charges, cost of POL, for crane which will be issued by the department on free of cost at ALHW Mech sub-division, Hut Bay, but including cost of hire charges of track with POL all labours, crane operator and diver charges, cost of Slings, lifting tackles, minor tools etc.,complete. Dock wall expansion joint with SS bolt & nutsProviding and fixing of grade SS 304 bolts and nuts, size 200 mm long & 20 mm dia @ 600 mm c/c spacing on the dock side wall of the new portion of Dry dock as per the drawing ad as directed by the EICCosts:The rate quoted by the bidder shall include cost of all materials, fixing, fasteners, welding, including preparation of template, all machinery, scaffolding, transportation, all cost of labour charges, tools and plant, Labour welfare cess, GST, etc, complete. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.