| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR SUPPLY AND INSTALLATION OF 33 KV RING MAIN UNIT AT 33/11 KV SUB-STATION, IT PARK FOR CONNECTING 33/11 KV SUB-STATION, NALAPANI UNDER EDSD, IT PARK UNDER EDD, RAIPUR AGAINST E-TENDER SPECIFICATION NO.08/EDCRDDUN/2026-27 Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Qty Rate Amount Part [A] (Supply Portion) |
| 2 | Cable Holding Clamp with N&B |
| 3 | Holding Clamp for ST Pole SP-55 with N&B |
| 4 | Nut & Bolts |
| 5 | 33 KV HS Cable END Termination Kit 3x400 sqmm. Outdoor |
| 6 | 33 KV Touch Proof Pushon Termination Kit Indoor |
| 7 | 33 KV Ring Main Unit |
| 8 | Al. Crimping Type Lugs 400 sqmm. |
| 9 | MS Flat 40x6 mm Total - Part [A] 0.0 Part [B] (Labour Portion) |
| 10 | Cartage of ST pole from store centre to construction site with loading, unloading at both points. (loading, unloading pluse carriage per pole) and proper stacking. (0-20 Km.) SP-55 Nos 2.0 0.0 |
| 11 | Cartage of other material (other than poles) by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends. (0-20 Km.) Rs.Per Qtl. Qtl 35.0 0.0 |
| 12 | Head load cartage of following Poles from road to site Upto 0 to 1 Km. SP-55 Nos 2.0 0.0 |
| 13 | Head load cartage of Small material. Rates are per Km/Quintal including loading and Unloading. Upto 0 to 1 Km. Qtl 35.0 0.0 |
| 14 | Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I. Strip (to be supplied by contractor ) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm. |
| 15 | Making open trench in rocky area including laying of 33 KV underground cable in trench of 2 mtr. Depth below ground level and connecting HDPE pipe. |
| 16 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESPO sehedule and local approved drawing. |
| 17 | Fixing of GI Pipe |
| 18 | Excavation of earth for pole pit of size 0.9X0.6X1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. |
| 19 | Erection of following Double support pole in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESPO construction Manual. SP-55 Nos 1.0 0.0 |
| 20 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction Manual. |
| 21 | Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc. |
| 22 | Painting of poles with angle and channel and all steel part by one coat of Rod Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level. ST Pole SP-55 Mtr 2.0 0.0 |
| 23 | Making of Seciton Pole |
| 24 | Supply and Laying of HDPE Pipe |
| 25 | HIPOT Cable Testing before Energizing |
| 26 | Laying of 33 KV Cable for pole rising O/H |
| 27 | Installation of 3 Way RMU and other work |
| 28 | Installation of Jointing Kit 33 KV 3x400 sqmm. O/D |
| 29 | Making Loop of 33 KV XLPE Cable |
| 30 | Mounting Fixing Test with all Connection 3 Way RMU Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |