| 1 | Brooming & cleaning of floors of workshop, Regional store & other places in industrial area including spreading of sand, lime, saw dust over oily surface, scrapping, removal and dosposal of the same upto a lead of 100m all complete as per instruction of EIC (Excluding the cost of saw dust, lime & sand) |
| 2 | Brooming and Cleaning of all roads within the premises of service building and other places as required with all tools & tackles and stacking the garbage at specified place as per instruction of EIC. |
| 3 | Cleaning of toilets with attached with hostel rooms, office chambers etc. including cleaning of floors, skirting & dado, WC Pan(Indian/European type), wash basin, shelves, mirror and other fittings, if any, by hand dusting and cleaning with soap solutions, acids, deodrants, phenyl etc. to make the toilet clean and jhygenic and providing napthelene balls in urinals complete with all tools, tackles and consumables as per instruction of EIC (for community and service building) |
| 4 | Cleaning of general/common toilets including cleaning of WC Pan(Indian/European type), wash basin, urinals by hand dusting and cleaning with soap solutions, acids, deodrants, phenyl etc. to make the toilet clean and jhygenic and providing napthelene balls in urinals complete with all tools, tackles and consumables as per instruction of EIC |
| 5 | Cleaning of inspection chamber of all sizes and disposal of sludge etc. all specified place outside the colony with all leads including removal & replacing of top cover, mending the damages of cover and chamber, if any etc. as per instruction of EIC |
| 6 | Disposal of dead animal including transporting to the specified place, making earth pit, disposal of dead animal into pit with adequate quantity of salt, lime, bleaching powder etc. and refilling the pit with earth all complete with tools & tackles consumables as per instruction of EIC. Big animal (Cow, buffalo, ox and the like) |
| 7 | Disposal of dead animal including transporting to the specified place, making earth pit, disposal of dead animal into pit with adequate quantity of salt, lime, bleaching powder etc. and refilling the pit with earth all complete with tools & tackles consumables as per instruction of EIC. Small animals (Dog, Cat, fox, pig, bird and the like) |
| 8 | Cleaning of surface drain including disposal of muck/sludge through trolly or other arrangement to a specified place ( in no case it should be kept on drain bank) within a lead of 1 Km complete with all tools & tackles as per instruction of EIC.Upto 300mm wide |
| 9 | Cleaning of surface drain including disposal of muck/sludge through trolly or other arrangement to a specified place ( in no case it should be kept on drain bank) within a lead of 1 Km complete with all tools & tackles as per instruction of EIC. Above 300mm and upto 600mm wide |
| 10 | Cleaning of surface drain including disposal of muck/sludge through trolly or other arrangement to a specified place ( in no case it should be kept on drain bank) within a lead of 1 Km complete with all tools & tackles as per instruction of EIC. Above 600mm |
| 11 | Cleaning, mopping & washing of floor of public buildings other places neatly with detergents, bleaching powder etc all complete with tools, tackles and consumable to make the floor clean & hygenic as per instruction of EIC |
| 12 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil |
| 13 | Extra rates for quantities of works, executed : Note for item no. 2.24:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level upto the centre of gravity of the quantity executed in difficult conditions. The depth shall be reckoned correct to 0.1 metre. 0.05 metre or more shall be taken as 0.1 metre and less than 0.05 metre ignored.In or under water and/or liquid mud, including pumping out water as required. |
| 14 | Carriage of materials by Mechanical Transport including loading, unloading and stacking. Earth Lead - 3 Km |
| 15 | Cleaning of chocked sewer line and sludge line of all dia meters including removal of earth opening of joints, cleaning of pipeline, making joint leak proof etc. all complete including disposal of sludge materialsoutside the colony with all leads at specific place with tools & tackels as per instructio of EIC. |
| 16 | Cleaning of Septic tank of 20 users capacity with tools & tackles including disposal of sludge material outside the periphery of colony with all leads at a specified place complete as per instruction of EIC. |
| 17 | Supplying and stacking of sand |
| 18 | Cleaning of door shutter , Window shutters including chowkhats , window grill , glass panels,cobwebs etc of service/community buildings with neccesary detergent , chemical etc. Complete as per instructions of EIC |
| 19 | Cleaning of all types of roof including removal of dry leaves, weedings and cleaning dram holes, brooming etc. all complete with tools & tackles and stacking the garbage at specified places as per instruction of EIC. |
| 20 | Cleaning of roof top water tank, including draining out water, cleaning, disinfecting the tank, by bleaching power etc. and washing the tanks with fresh water, writing of cleaning date with paint on the outer face of the tank all complete with tools, tackles and consumables as per instruction of EIC. |
| 21 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil |
| 22 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 23 | Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) Lead upto 3.00 KM |
| 24 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |