| 1 | Description |
| 2 | Demolishing RCC work manually/ by mechanical means including stacking of steel bars and disposal of uerviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge |
| 3 | Providing and laying cement concrete 1:3:6( 1cement:3 sand: 6 graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth with in all leads and lifts as per the direction of Engineer-in-Charge. |
| 4 | Providing and laying cement concrete 1:1.5:3 ( 1 cement : 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinth. |
| 5 | Providing tor steel reinforcement for RCC work including bending,binding and placing in position compete upto floor two levels. |
| 6 | Removal of slips in all kinds of soil (including saturated soil but excluding boulders and rocky portion requiring blasting upto a distance of 20 metres dosposing of un-serviceable materials, stacking serviceable neatly dressing the surface.materials and neatly dressing the surface. |
| 7 | Providing and laying cement concrete 1:2:4 work (1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- Slab |
| 8 | Foundation and Plinth |
| 9 | White Washing with lime on undercoated wall surfaces two coat to give and even shade including thoroughly brooming the surfece to remove all dirt dust and other foreign matter |
| 10 | Providing and laying in trenches to be leveled to grades,IS marked GI pipes GMS ( Heavy / Medium grade) of following diameters conforming to IS 1239-1991 ( PartII ) latest with up to date amendments ) having minimum wall thickness as for class of pipe specified below jointed with pipe conforming to tables as specified below of BIS 6392-1971 ( Lautest with up to date amendments ) butt. welded at Both ends according to relevant BISstandards & detailed specifications complete in all respect of technical specifications as per site conditions including flushingt,cleaning & hydraulic testing complete to the best satisfaction of Engineer in charge. 125mm Dia (H.G) |
| 11 | Rewinding of 75HP Marathon make motor with super enamalled copper winding wire of reputed make complete in all respect |
| 12 | Provinding & Fixing of new glass wire for main lead complete in all respect |
| 13 | Providing & fixing of fiber stick for motor slots complete in all respect |
| 14 | Provinding & Fixing of new terminal plate for 75 HP motor complete in all respect |
| 15 | Provinding & Fixing of new ball bearing 6312 SKF & 6310 SKF complete in all respect |
| 16 | Providing & Fixing of stamping slot and chemical wash of motor complete in all respect. |
| 17 | Repair of sleeve and making as per size ball bearing complete in all respect |
| 18 | Providing & fixing of motor painting complete in all respect |
| 19 | Carriage of motor from site to workshop and back to site with testing complete in all respect |
| 20 | Providing & fixing of voltage meter 0 to 500 complete in all respect |
| 21 | Providing & fixing of ampere meter 0 to 300 complete in all respect |
| 22 | Providing & Fixing of copper finger complete in all respect |
| 23 | Providing & Fixing of copper gutka complete in all respect |
| 24 | Providing & fixing of starter oil complete in all respect |
| 25 | Providing & fixing of Aluminium Armoured cable 3 core 70mm Sqm for motor & Pump Set complete with all respect as per entire satisfaction of Engineer-in-charge |
| 26 | Provinding 3 phase mono submersible pump set of reputed and approved make i.e. KSB/Hindustan model MR-3 confirming to latest BIS specification i.e. 8304. The pump set shall be fixed with free flow impellers of suitable allow as per BIS 8631-1976 with upto date amendments for lifting raw water lubricated bush bearing of suitable alloy and shaft protection sleeves the pump shall be fitted coupled to submersible required cage motor cum pump to BIS 9283-1995 with upto date amendments corresponding to pump, fitted with water lubricated bush bearing alloys and shaft protection sleeve arrangement to counter balance the thrust caused due to water column in rising main and having cooling arrangement. The pump set should include the water level gaurd, errection clamps, cable clips and capable of following performances. |
| 27 | Static Head = 15 mtrs |
| 28 | Discharge = 13.50 LPS |
| 29 | Dia of Rising Main = 125 mm |
| 30 | Length = 50 Mtr |
| 31 | Pumping hours = 8 hours |
| 32 | P/F 3 core copper cable wire 6mm Sqm (Flat submersible Cable) |
| 33 | P/F control panel for 7.5 HP three phase with Ampere meter, Volt Meter, starter MCB water level guard |
| 34 | Installation of Pump set i/c cutting, welding, jointing, compltete in all respect at site. |
| 35 | Carriage of Pump Set & other accessories Please Enable Macros to View BoQ information |