| 1 | Erection Part for 3-Phase LT line |
| 2 | Erection of LT line.Digging of pit of stay, Erection of Steel Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 3 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 4 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 5 | Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of new 3-Phase LT line complete in all respect. |
| 6 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 7 | Dismentalling of existing L.T conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect |
| 8 | Supply Part for new 3-Phase LT line |
| 9 | Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage} |
| 10 | Prov. ST Pole 9 mtr.long alongwith baseplate complete in all respect. |
| 11 | Prov. RCC Muffs with concrete filling complete in all respect. |
| 12 | Prov. Angle iron (75x75x6) Length 1.5 mtr. + 0.2 mtr. |
| 13 | Prov. Shackle Insulator (16 Kn) |
| 14 | Prov. D-Iron (U-Clamps) |
| 15 | Prov. Earth Knob |
| 16 | Prov. LT Stay Set |
| 17 | Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set |
| 18 | Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set] |
| 19 | Prov. Earthing Set complete |
| 20 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 21 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 22 | Prov. Spiral PVC Spacer (16 Nos Supply by HPSEBL) |
| 23 | Prov. Aluminium Paint |
| 24 | Prov. Red Oxide |
| 25 | Transportation and Loading of LT lines materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of LT line allied Material For Average Distance From Road To Site Of Work .(If required as per site). |
| 26 | Erection/Shifting Part of 11/0.4 KV Transformer at Tatehra |
| 27 | Erection of S/Stn. Str.:-Digging of Pit for S/T Pole, Preparation of Platform, earthing of substation and Filling of Muffs with PCC and Erection/Shifting of Existing DTR Str, painting, erection of Stay Set, earthing conn. to T/F G.O Switch lightning etc, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. |
| 28 | Dismantlling of S/Stn. Str.:- Dismantlling Existing DTR Str Complete in All respect. |
| 29 | Prov. Pipe Earthing Set |
| 30 | Prov. 6 SWG GI wire For Earthing |
| 31 | Prov. Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures) |
| 32 | Erection Part for 3-Phase LT line at Tatehra |
| 33 | Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 34 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 35 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 36 | Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of new 3-Phase LT line complete in all respect. |
| 37 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 38 | Dismentalling of existing L.T conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect |
| 39 | Supply Part for new 3-Phase LT line |
| 40 | Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage} |
| 41 | Prov. ST Pole 8 mtr.long alongwith baseplate complete in all respect. |
| 42 | Prov. RCC Muffs with concrete filling complete in all respect. |
| 43 | Prov. Angle iron (75x75x6) Length 1.5 mtr. + 0.2 mtr. |
| 44 | Prov. Shackle Insulator (16 Kn) |
| 45 | Prov. D-Iron (U-Clamps) |
| 46 | Prov. Earth Knob |
| 47 | Prov. LT Stay Set |
| 48 | Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set |
| 49 | Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set] |
| 50 | Prov. Earthing Set complete |
| 51 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 52 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 53 | Prov. Spiral PVC Spacer (8 Nos Supply by HPSEBL) |
| 54 | Prov. Aluminium Paint |
| 55 | Prov. Red Oxide |
| 56 | Transportation and Loading of LT lines materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of LT line allied Material For Average Distance From Road To Site Of Work .(If required as per site). Please Enable Macros to View BoQ information |