| 1 | Supply,Installation.Testing and Commissioning of below mentioned items |
| 2 | 11/0.433kV, 25 kVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, and with LV Cable Box having detachable Aluminium Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. |
| 3 | 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
| 4 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 5 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 6 | 70mm² Single-Core Cable,1.1kV Grade XLPE Insulated Stranded Conductor FRLS type |
| 7 | 9 Mtr. Long Pole,(ST-410 SP33) |
| 8 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 9 | GI Channel/Angle/Flat of sizes including clamps |
| 10 | Galvinized Nuts and Bolts. |
| 11 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 12 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 13 | LT Distribution Box for 25 kVA DTR with 40 Amp MCCB 3P 16 kA for incomer & 25 Amp MCCB 3P 16 kA/10 kA 1 No each (=2No.) for Outgoing Circuits . |
| 14 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 )mm, nut-bolts, 2 Nos turn- buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 15 | Anti-Climbing Device with Clamps |
| 16 | 3-Ø, 4-Wire Trivector Meter with suitable ring type CT |
| 17 | Cement bottoming 1:2:4 mix as per Standards 0.5cum /pole |
| 18 | Painting of Poles with Red Oxide and Aluminium Paint |
| 19 | Sundry items like Aluminium lugs, Jumpers, Binding Tape etc |
| 20 | 35 mm2 Cable (4C) from LTDB to BTS site r,1.1kVGrade, Armoured,XLPE Insulated StrandedConductor FRLS type |
| 21 | GI V cross-arm / side cross arm with top Bracket including clamp including back clamps |
| 22 | 50 mm² ACSR Conductor |
| 23 | PG Clamps for 50 mm² ACSR Conductor |
| 24 | Galvanized Nuts and Bolts |
| 25 | Danger Plates with Clamps |
| 26 | Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm |
| 27 | 11 kV Isolator, Double Break,3-pole, 630Amp, horizontal mounting Type, with Earth Switch. Please Enable Macros to View BoQ information |