| 1 | The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 2 | 33 KV VCB with Steel Structure as per Required Size |
| 3 | 33 KV Control Pannel for Double Power Transformer |
| 4 | 33 KV Control Pannel for Single Power Transformer |
| 5 | 33 KV CT as per Required Size |
| 6 | 33 KV Metering Cubical Unit Required as per Size |
| 7 | 33 KV CT/PT Metering Pole Mounted Unit Required as per Size |
| 8 | 33 KV Outdoor Jointing Kit Required as per Size |
| 9 | 33 KV Indoor Jointing Kit Required as per Size |
| 10 | 33 KV XLPE Cable 3x120 Sqmm |
| 11 | 33 KV XLPE Cable 3x185 Sqmm |
| 12 | 33 KV XLPE Cable 3x300 Sqmm |
| 13 | 250 KVA Distribution Transformer |
| 14 | 100 KVA Distribution Transformer |
| 15 | 63 KVA Distribution Transformer |
| 16 | 25 KVA Distribution Transformer |
| 17 | 10 KVA Distribution Transformer |
| 18 | PCC Pole 8.5/9.0 Meter |
| 19 | STP Pole 11 Meter |
| 20 | STP Pole 13 Meter |
| 21 | ACSR Weasel Conductor |
| 22 | ACSR Dog Conductor |
| 23 | ACSR Rabbit Conductor |
| 24 | 11 KV XLPE Cable 3x70 Sqmm |
| 25 | 11 KV XLPE Cable 3x120 Sqmm |
| 26 | 11 KV XLPE Cable 3x185 Sqmm |
| 27 | 11 KV XLPE Cable 3x300 Sqmm |
| 28 | 11 KV FUSE SET |
| 29 | 11 KV TPMO |
| 30 | 11 KV CT/PT Combiend Unit Required as per Size |
| 31 | 11 KV PILFER RESISTANT Meter Cubical Required as per Size |
| 32 | 11 KV Outdoor Jointing Kit Required as per Size |
| 33 | 11 KV Indoor Jointing Kit Required as per Size |
| 34 | 11 KV VCB I/C & O/G as per Required Size |
| 35 | LT PVC Cable 3.5x70/150/240/400 mm |
| 36 | LT ABC 1x16+1x25 Sqmm |
| 37 | LT ABC 3x50+1x35+1x16 Sqmm |
| 38 | LT ABC 3x95+1x70+1x16 Sqmm |
| 39 | LT ABC 3x120+1x95+1x16 Sqmm |
| 40 | 1Ph Distribution Box |
| 41 | 3Ph Distribution Box |
| 42 | LINE MATERIAL (Pin/Disc Insulator, X-Arm, ANGLE, CHANNEL ETC.) |
| 43 | Complete work of installing the electrical material received from the store center at the site. |
| 44 | Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the established electric poles installed as per RESPO norms. |
| 45 | Complete work of Laying/Installing ACSR DOG CONDUCTOR on the established electric poles installed as per RESPO norms. |
| 46 | Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the established electric poles installed as per RESPO norms. |
| 47 | Complete work of 33 KV XLPE CABLE 3x120 Sqmm on the established electric poles installed as per RESPO norms. |
| 48 | Complete work of 33 KV XLPE CABLE 3x185 Sqmm on the established electric poles installed as per RESPO norms. |
| 49 | Complete work of 33 KV XLPE CABLE 3x300 Sqmm on the established electric poles installed as per RESPO norms. |
| 50 | Complete work of 11 KV XLPE CABLE 3x70 Sqmm on the established electric poles installed as per RESPO norms. |
| 51 | Complete work of 11 KV XLPE CABLE 3x120 Sqmm on the established electric poles installed as per RESPO norms. |
| 52 | Complete work of 11 KV XLPE CABLE 3x185 Sqmm on the established electric poles installed as per RESPO norms. |
| 53 | Complete work of 11 KV XLPE CABLE 3x300 Sqmm on the established electric poles installed as per RESPO norms. |
| 54 | Complete work of LT ABC 1x16+1x25 Sqmm on the established electric poles installed as per RESPO norms. |
| 55 | Complete work of LT ABC 3x50+1x35+1x16 Sqmm on the established electric poles installed as per RESPO norms. |
| 56 | Complete work of LT ABC 3x95+1x70+1x16 Sqmm on the established electric poles installed as per RESPO norms. |
| 57 | Complete work of LT ABC 3x120+1x95+1x16 Sqmm on the established electric poles installed as per RESPO norms. |
| 58 | Digging & laying of 11 KV Cable (Single ckt) in trench with sand & brick and back filling as per RESPO norms. Sand & Brick other necessary Decentralized material will be provide by the Contractor/Firm. |
| 59 | Digging & laying of 11 KV Cable (Double ckt) in trench with sand & brick and back filling as per RESPO norms. Sand & Brick other necessary Decentralized material will be provide by the Contractor/Firm. |
| 60 | Laying of HDPE Pipe for laying of XLPE Cable( as per Required size) with HDD (trenchless) method including cable laying for Road crossing. Necessary Decentralized material will be provide by the Contractor/Firm. |
| 61 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 62 | Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 63 | Work of Fixing/Installing Try Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm. |
| 64 | Work of Fixing/Installing Four Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm. |
| 65 | Work of Fixing/Installing Single Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 66 | Work of Fixing/Installing Double Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 67 | Work of Fixing/Installing Try Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm. |
| 68 | Work of Fixing/Installing Four Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm. |
| 69 | Complete construction work of Plinth and Foundation / Structure for installing 33 KV VCB as per RESPO standards. In which bricks, sand, cement and other decentralized materials will be provide by the contractor / Firm. |
| 70 | Complete work of installation and commissioning of 33 KV VCB as per RESPO standards. |
| 71 | Complete work of installation and commissioning of 33 KV Control Pannel for Double TF as per RESPO standards. |
| 72 | Complete work of installation and commissioning of 33 KV Control Paneel for Single TF as per RESPO standards. |
| 73 | Complete work of installation and commissioning of New 33 KV CT. as per RESPO standards. |
| 74 | Complete work of installation and commissioning of 11 KV VCB. as per RESPO standards. |
| 75 | Complete work of Installing and Commissioning 10 KVA Distribution Transformer on established Single pole as per RESPO standards. |
| 76 | Complete work of Installing and Commissioning 25 KVA Distribution Transformer on established Double pole as per RESPO standards. |
| 77 | Complete work of Installing and Commissioning 63 KVA Distribution Transformer on established Double pole as per RESPO standards. |
| 78 | Complete work of Installing and Commissioning 100 KVA Distribution Transformer on established Double pole as per RESPO standards. |
| 79 | Complete work of Installing and Commissioning 250 KVA Distribution Transformer on established Plinth as per RESPO standards. |
| 80 | 25 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards. |
| 81 | 63 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards. |
| 82 | 100 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards. |
| 83 | Complete work of Making New plinth (Size 2x2x1.5 Meter) for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm. |
| 84 | Complete work of Making New Fencing for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm. |
| 85 | Complete work of Installing and Commissioning LT FUSE SET with SMC BOX on established 25 KVA, 63 KVA & 100 KVA Distribution Transformer. as per RESPO standards. necessary Decentralized material will be provide by the Contractor/Firm. |
| 86 | Complete work of Installing and Commissioning LT incoming panel with metering equipment, Fuse & fixing arrangement (LS) on established 160 KVA, 250 KVA, 400 KVA & Above Distribution Transformer as per RESPO standards. |
| 87 | Complete work of Installing and Commissioning Tailless Fuse Unit Installation (Marble Stone Distribution Board Double Ckt with M S Angle Frame Complete in all Respect and all necessary decentralized material will be provide by the Contractor/Firm.) on established 11/0.4 KV 160 KVA & 250 KVA Distribution Transformer as per RESPO standards. |
| 88 | Complete work of Installing and Commissioning 33 KV CT/PT Pole Mounted Unit on established Double pole as per RESPO standards. |
| 89 | Complete work of Installing and Commissioning 33 KV METERING CUBICAL UNIT as per RESPO standards. |
| 90 | Complete work of Installing and Commissioning 33 KV Outdoor Jointing Kit as per RESPO standards. |
| 91 | Complete work of Installing and Commissioning 33 KV Indoor Jointing Kit as per RESPO standards. |
| 92 | Complete work of Installing and Commissioning 11 KV CT/PT Pole Mounted Unit on established Double pole as per RESPO standards. |
| 93 | Complete work of Installing and Commissioning 11 KV PILFER RESISTANT Meter Cubical as per RESPO standards. |
| 94 | Complete work of Installing and Commissioning LT 1P Distribution Box as per RESPO standards. |
| 95 | Complete work of Installing and Commissioning LT 3P Distribution Box as per RESPO standards. |
| 96 | Complete work of Installing and Commissioning 11 KV Outdoor Jointing Kit as per RESPO standards. |
| 97 | Complete work of Installing and Commissioning 11 KV Indoor Jointing Kit as per RESPO standards. |
| 98 | Complete work of Installing and Commissioning 11 KV Fuse Set as per RESPO standards. |
| 99 | Complete work of Installing and Commissioning 11 KV TPMO as per RESPO standards. |
| 100 | Complete work of installation of Stay Set Complete with Concreting on established Double pole & Single Pole of Line As per the RESPO standards. |
| 101 | Complete work of Pipe Earthing (upto Water Level) of established Distribution Transformer / CT/PT UNIT & Meter Cubicle as per RESPO standards. |
| 102 | Complete work of Chemical Earthing of established Distribution Transformer / CT/PT UNIT & Meter Cubicle as per RESPO standards. |
| 103 | Complete work of straightening slanted electric pole as per RESPO standards. |
| 104 | Complete work of Pole concreting on established Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
| 105 | Complete work of Earthing completing by establishing earthing road of Stablished Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 106 | Complete work of guarding on the established Pole of the Line as per RESPO standards. by GI wire and MS angle as per size. In which decentralized material will be provide by the Contractor/Firm. |
| 107 | Complete work of dismantling L.T. Line to be shifted as per RESPO standards from safety point of view. Electric poles/conductors etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work. |
| 108 | Complete work of dismantling 11 KV Line to be shifted as per RESPO standards from safety point of view. Electric poles/conductors etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work. |
| 109 | Complete work of dismantling 33 KV Line to be shifted as per RESPO standards from safety point of view. Electric poles/conductors etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work. |
| 110 | Complete work of Pulling / Resaging the Span wires by shifting the Line / Electric pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 111 | Complete work of Road Restoration Charges for Footpath Side as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 112 | Complete work of Tying/Binding Number Plate on establishing Four Pole/ Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 113 | Complete work of Tying/Binding Danger Board on establishing Four Pole /Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 114 | Complete work of Tying Barbed Wire on establishing Four Pole/ Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 115 | Complete work of Pole Painting (Aluminium Paint) on establishing Four Pole/ Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 116 | Complete work of Pole Painting (Red Oxide Paint) on establishing Four Pole/ Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 117 | Complete work of cutting and pruning the branches of trees standing between the Line installed and shifting place/route. |
| 118 | Supply of Nut & Bolts as per RESPO standards |
| 119 | Supply of Dead & Clamp as per RESPO standards |
| 120 | Supply of LT Clamp as per RESPO standards |
| 121 | Supply of Suspension Clamp as per RESPO standards |
| 122 | Supply of Piercing Clamp as per RESPO standards |
| 123 | Supply of Top Clamp as per RESPO standards |
| 124 | Supply of DP Clamp as per RESPO standards |
| 125 | Supply of LT Shakle Insulator as per RESPO standards |
| 126 | Supply of X-Arm Holding Clamp as per RESPO standards |
| 127 | Supply of Crimping Lugs as per RESPO standards |
| 128 | Supply of F-Clamp / F-Bracket as per RESPO standards |
| 129 | Supply of Stone Pad as per RESPO standards |
| 130 | Supply of P.G. Clamp as per RESPO standards |
| 131 | Supply of J-Hook as per RESPO standards |
| 132 | Supply of Packing piece and clamp for above with Nut & Bolts as per RESPO standards |
| 133 | Supply of Earth wire Clamp with Nut & Bolts as per RESPO standards |
| 134 | Supply of Amour rod with ferules for DOG as per RESPO standards |
| 135 | Supply of Bolt Nut & Washer as per RESPO standards |
| 136 | Supply of Clamp for Ms Angle as per RESPO standards |
| 137 | Supply of Clamp for Top Channel as per RESPO standards |
| 138 | Supply of Aluminium Tape as per RESPO standards |
| 139 | Supply of Number Plate as per RESPO standards |
| 140 | Supply of Danger Board with Clamp as per RESPO standards |
| 141 | Supply of Barbed wire as per RESPO standards |
| 142 | Supply of Aluminium Paint as per RESPO standards |
| 143 | Supply of Red Oxide Paint as per RESPO standards |
| 144 | Supply of Control Cable 2x2.5 Sqmm as per RESPO standards |
| 145 | Supply of Control Cable 4x2.5 Sqmm as per RESPO standards |
| 146 | Supply of HDPE PIPE 120 mm as per RESPO standards |
| 147 | Supply of HDPE PIPE 140 mm as per RESPO standards |
| 148 | Supply of GI PIPE 6\\"DIA as per RESPO standards |
| 149 | Supply of Incoming Stud for 400 Amp for Tailless Unit. as per RESPO standards |
| 150 | Supply of Outgoing Stud for 400 Amp for Tailless Unit. as per RESPO standards |
| 151 | Supply of Copper Bus Bar for Dist. Board Double Circuit for Tailless Unit. as per RESPO standards |
| 152 | Supply of Copper Fuse Strip 240x10x3 mm for Tailless Unit. as per RESPO standards |
| 153 | Supply of Crimping Lugs for Tailless Unit. as per RESPO standards |
| 154 | Supply of Nut & Bolts for Tailless Unit. as per RESPO standards |
| 155 | LT Fuse Set with SMC Box inculde Clamp with Nut & Bolts as per RESPO standards |
| 156 | LT incoming panel with metering equipment, Fuse & fixing arrangement (LS) |
| 157 | Sundry Items for Line Shifting Work |
| 158 | Sundry Items for New Connection on LT Voltage |
| 159 | Sundry Items for New Connection on 11 KV Voltage |
| 160 | Sundry Items for New Connection on 33 KV Voltage |
| 161 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 162 | 25 KVA Distribution Transformer Old & Used / Damage |
| 163 | 63 KVA Distribution Transformer Old & Used / Damage |
| 164 | 100 KVA Distribution Transformer Old & Used / Damage |
| 165 | 250 KVA Distribution Transformer Old & Used / Damage |
| 166 | ST Pole Old & Used / Damage |
| 167 | PCC Pole Old & Used / Damage |
| 168 | Weasel Conductor Old & Used / Damage |
| 169 | Dog Conductor Old & Used / Damage |
| 170 | Rabbit Conductor Old & Used / Damage |
| 171 | XLPE Cable Old & Used / Damage |
| 172 | LT Cable Old & Used / Damage |
| 173 | Line Material (Insulator, Disc, X-Arm, Angle, Channel ETC.) Old & Used / Damage Please Enable Macros to View BoQ information |