| 1 | Digging of pit and pulling out of 33KV XLPE cable up to 3x300sqmm for tracking of fault along the length of cable afterwords unwinding the loops. |
| 2 | Digging of pit and pulling out of 11KV XLPE cable up to 3x300sqmm for tracking of fault along the length of cable afterwords unwinding the loops at per site conditions. |
| 3 | Providing and filling of 33KV straight through cable joiting kit complete with all respect after that meggering of cable and restoring the supply. (a) 33KV straight through 3x300mm. |
| 4 | (b) 33KV straight through 3x185mm. |
| 5 | (c) 33KV straight through 3x120mm. |
| 6 | (d) 33KV straight through 3x50mm. |
| 7 | Providing and filling of 11KV straight through cable jointing kit complete with all respect after that Meggering of cable and restoring the supply. (a) 11KV straight through 3x300mm. |
| 8 | (b) 11KV straight through 3x185mm. |
| 9 | (c) 11KV straight through 3x120mm. |
| 10 | (d) 11KV straight through 3x70mm. |
| 11 | Providing and filling of 33KV outdoor cable end terminal complete with all respect after that meggering of cable and restoring the supply.(a) 33KV O/D cable end terminal 3x300mm. |
| 12 | (b) 33KV O/D cable end terminal 3x185mm. |
| 13 | (c) 33KV O/D cable end terminal 3x120mm. |
| 14 | (d) 33KV O/D cable end terminal 3x50mm. |
| 15 | Providing and filling fo 11KV Outdoor cable end terminal complete with all respect after that meggering of cable and restoring the supply. (a) 11KV O/D cable end terminal 3x300mm. |
| 16 | (b) 11KV O/D cable end terminal 3x185mm. |
| 17 | (c) 11KV O/D cable end terminal 3x120mm. |
| 18 | (d) 11KV O/D cable end terminal 3x50mm. |
| 19 | Providing and filling fo 33KV indoor cable end terminal complete with all respect after that meggering of cable and restoring the supply. (a) 33KV I/D cable end terminal 3x300mm. |
| 20 | (b) 33KV I/D cable end terminal 3x185mm. |
| 21 | (c) 33KV I/D cable end terminal 3x120mm. |
| 22 | (d) 33KV I/D cable end terminal 3x70mm. |
| 23 | Providing and filling fo 11KV indoor cable end terminal complete with all respect after that meggering of cable and restoring the supply. (a) 11KV I/D cable end terminal 3x300mm. |
| 24 | (b) 11KV I/D cable end terminal 3x185mm. |
| 25 | (c) 11KV I/D cable end terminal 3x120mm. |
| 26 | (d) 11KV I/D cable end terminal 3x70mm. |
| 27 | Back filling of digged pit after laying/insertion of cable having straight through 33KV cable jointing kit including ramming of earth properly. |
| 28 | Back filling of digged pit after laying/insertion of cable having straight through 11KV cable jointing kit including ramming of earth properly as per site. |
| 29 | Hanging of 33KV cable on double pole after outdoor termination kit work as per site condition. |
| 30 | Hanging of 11KV cable on double pole after outdoor termination kit work as per site condition. Please Enable Macros to View BoQ information |