|
| 1 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.On bituminous surface @ 0.25kg/sqm to 0.30 kg/sqm |
| 2 | Providing and laying dense graded Bituminous macadam with higher capacity batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site , laying with a hydrostatic paver finisher with sensor control to the required garade, level and alignment , rolliong with smooth wheeled , vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects. |
| 3 | Providing and laying Bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder @ 5.4per cent of mix and filler, transporting the hot mix to work site , laying with a hydrostatic paver finisher with sensor control to the required garade, level and alignment , rolliong with smooth wheeled , vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. |
| 4 | Providing and laying bitumen mastic wearing course (as perspecifications) with industrial bitumen of grade 85/25 conforming to IS : 702, prepared by using mastic cooker and laid to required leveland slope, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of approved size at the rate of 0.005 cum per 10 sqm and at approximate spacing of 10 cm centre to centre in both directions, pressed into surface protruding 1 mm to 4 mm over mastic surface 40 mm thick |
| 5 | Construction of granular sub-base by providing close graded Material, Spreading in Uniform Layers with Motor Grader on prepared surface , mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density , complete as per clause 401 |
| 6 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gatesand similar works |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum.Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level |
| 9 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size |
| 10 | Supply of Tractor Trolley on hire charge including Fuel & lubricant charge operator and all T&P etc as required |
| 11 | Supply of labour complete at Site on etc. in all respect as per direction of Engineering in-Charge |
| 12 | supply of Mobile Hydraulic crane 35 Tonne Capacity (173 H) |
| 13 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. Please Enable Macros to View BoQ information |