|
| 1 | Temporary Civil Works |
| 2 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0\\" min. ht.) roof should be projected upto 2'0\\" from all walling. (Payment will be made as per floor area). |
| 3 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0\\" min. ht.) Roof should be projected upto 2'0\\" from all walling. (Payment will be made as per floor area) |
| 4 | Inside walling and ceiling with clean white or colour washed cloth with bamboo/ sal framing and post complete (Restricted item). |
| 5 | Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete (Restricted item). |
| 6 | Walling with clean G.C.I. Sheets with bamboo/sal frame and post complete as per direction (8'0\\" to 10'0\\" ht.). |
| 7 | Fitting, fixing in position of collapsible gate (on hire basis) as per direction.(Payment will be made as per opening length). |
| 8 | Hire and labour charges for bamboo barricading with sal post of 4\\" dia @4' c/c including necessary frame works complete upto 3'0\\" to 4'0\\" ht with 3 rows. |
| 9 | Making of wooden platform upto 1'0\\" ht. Including supply of wooden planks and necessary frame works with post as per direction (Restricted item). |
| 10 | Supplying and laying of tarpaulin as per direction. |
| 11 | Supplying and laying of Carpet (good quality) as per direction. |
| 12 | Gap covering with wooden planks including framing works complete as per direction. |
| 13 | Supplying and fixing in position of door/window curtain. |
| 14 | Hire and labour charges for providing 'Drop Gate' with 15cm. Dia. Salbullah of length not less than 8 mtr. Including hoisting and fitting fixing with bolts and nuts to vertical post (100 mm dia 2 nos. of each flank embedded 750 mm below ground level) and providing counter load of concrete or stone or iron block at the fulcrum end including painting 2 coats in alternate band providing 'stop' plate, jute rope of necessary length etc. complete including dismantling and remove as per direction. |
| 15 | Making of display board with local wood and ply board of size 3'0\\"x2'0\\" with display matters. A. With Stand |
| 16 | Making of display board with local wood and ply board of size 4'0\\"x3'0\\" with display matters. A. With Stand |
| 17 | Hire charges of wooden table on hire basis of size 5'0\\"x3'0\\". |
| 18 | Hire charges of wooden table on hire basis of size 4'0\\"x2.5'0\\". |
| 19 | Hire charges of wooden table on hire basis of size 3'0\\"x2'0\\". |
| 20 | Hire charges of Coushion chair. |
| 21 | Hire charges of Polythene chair. |
| 22 | Hire charges of clean white table cloth. |
| 23 | Hire charges of plastic bucket with lid . |
| 24 | Hire charges of big size polythene drum for making waste paper basket. |
| 25 | Repairing any brick work or concrete work with concrete or brick and make it worthy and safe for election purpose as per direction of EIC |
| 26 | Supplying E.C.Bullah and labour charges for scissors barricading with 75 to 100 mm dia resiting over the bullah post including necessary binding with wire or rope as per direction of EIC. |
| 27 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 28 | Supplying & Labour for laying soiling with bricks including carriage of bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled inandpackedwith local sandor powdered earthand including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used) |
| 29 | Supply of Daily labour Please Enable Macros to View BoQ information |