| 1 | Design, Construction, Supply, Erection, Testing, Commissioning of 4.5 MLD average flow with peak factor Main Pumping Station (MPS) and 4.5 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology along with Tertiary Treatment complete in all respect including Landscaping, all other contingent i.e. Civil, Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS at STP including Tertiary treatment, Entire infrastructure including construction of Staff quarter, Administrative building cum Laboratory with equipment and tools, Boundary wall and plants as per detail given in the bid document comprises of 900 mm dia incoming sewer lines to be connected with last Manhole prior to MPS, Main Receiving Chamber Bv Pass Channel. Inlet Chamber, Coarse Screen Chamber, Distribution Chamber, wet well sump suitable for 4.5 MLD average flow with peak factor including Providing and installing non clog sewage submersible pump sets each equipped with VFD and suitable LT panel boards, all safety devices. automatic capacitor bank and suitable size submersible cable from LT panel to pumps, K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISl marked D.1. fittings, Knife gate valves non-return valves as per requirements even for bye-pass arrangements along with necessary Knife gate valves etc., Piping Gallery, Stilling Chamber, Fine Screen Chamber, Grit Chamber, SBR Basin, Sludge Thickener, Necessary piping work with the required DI D/F Resilient seated Sluice Valve and sluice Valve Chambers, Belt Filter Press including Belt Filter Press feed pump, Chlorine Contact Tank, Chlorinator room,Pressure Sand Filter and Activated Carbon filters, Providing and laying of RCC pipe cater 4.5 MLD flow with peak factor as per CPHEEO manual from plant outlet to disposal point (Existing Nalla, named as Drain no. 6) for Disposal of Treated effluent of 4.5 MLD, complete in all respects as per complete scope of work mentioned in Annexure-l including 6 Years Defect Liability-cum-Maintenance Period (after 3 Months trial run) at Devru, Sonipat town. (a) Entire Civil works, mechanical, electric and instrumentation works as per DNIT (As per detail attached at annexure- A and inclusive of O and M).Detail of components are attached as annexure A1Unit: 01 Job Brake up of cost for payment plan:- Capital work 80%DLP-cum-maintenance period 20% Scheduled of payment for DLP-cum-maintenance period is attached with DNITO and M includes all the scope of work included in the DNIT Payment scheduled is attached as annexure A2Main-Component: Civil works/ Process UnitMain Pumping StationStilling ChamberFine Screen ChamberGrit ChamberSBR BasinChlorination Disinfection TankBelt filter feed sumpPolyelectrolyte Dosing TankMain-Component: Civil Works/ Building WorksChlorination cum Chlorine Tonner HouseMCC and SCADA BuildingCentrifugal BuildingCentrifugal Feed Pump House (Sludge Pump and Blower House)SBR Air BloweAdmin BuildingHT SubstationDG RoomThickened Sludge Storage ShedGuard RoomStore roomStaff QuartersBoundary WallElectrical WorksElectric Estimate STPMain-Component: Mechanical WorksMain Pumping StationInlet Chamber and fine Screen Chamber at STPGrit Chamber at STPSBR Basin at STPChlorination DisinfectionSludge ThickenerBelt Filter PressPressure Sand FilterMain-Component: Instrumentation WorksInstrumentation WorksMain-Component: 6 years defect liabilitv-cum-maintenance period 6 years defect liability-cum-maintenance period. |