| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in- charge within a distance of 60 metre (200 feet). PWD SOR 2022 17.3 |
| 2 | Desposal of refused material/malwa distance up to 8 km etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2020 /231( a). |
| 3 | Providing and applying tack coat with bitumen VG - 10 grade using bitumen pressure distributor at the rate of .30 kg per sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as per technical specification |
| 4 | Recycling pavement by cold milling of existing bituminous layers, Using by Bituminous Concrete (Grading-II) using bitumen VG-30 content is 5.4% bitumen weight of mix. For reclaimed material, fresh bitumen will be required to the extent of 60% of normal requirement., planning the surface after cold milling, reclaiming excavated material to the extent of 30% of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as MoRT&H specified in clause 519. |
| 5 | S/L Hot applied Thermo Plastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area thick ness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35. the finished surface to be level uniform and free from streak and holes. rates all including of all taxes royality vat etc all t & p /machine material and lobour required for proper complition of work. (AS PER PWD SOR |
| 6 | Reflective Raised pavement marker providing and fixing of raised pavment markers (cat eye) type x ASTMD - 4956-04 avery dennission /3m (USA make) having moulded body of polycabonate ASA, HIPS or ABS able to support a load of 13.635 MT tested in accordance with ASTMD 4280 type H and other requirement mentioned in MoRT&H circular its reflective lens made of micro prismatic lens (capable of providing total internal reflection of light ), electronically welded to the body etc all complete as per specification or |
| 7 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.DSR 2023 16.83 |
| 8 | Supply of 22.4 to 53 mm gauge stone ballast with stacking for measurment etc all complete as per the direction of engineer in charge.RMR |
| 9 | Supply of Screeing material with stacking for measurment etc all complete as per the direction of engineer in charge.RMR |
| 10 | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405.(SOR 2022 SI. N. 20.02 ITEM N. 752) |
| 11 | Supply & laying 80 mm thick Precase cement concrete ishape interlocking paver block (Grey color) with top layer of minimum 8 mm thickness having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish,skid resistant manufacturered from rubber moulds M-30 GRADE AS PER SOR 2022. |
| 12 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer - in - charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) |
| 13 | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM ) |
| 14 | S/L C:C (1:2:4) with 20 mm stone grit, coarse sand & cement etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.07 ITEM NO 279(a).] |
| 15 | DPR CHARGE etc all completed as per the direction of engineer - in - charge. |
| 16 | SIGN BOARD etc all completed as per the direction of engineer - in - charge. |
| 17 | LESS OLD TILES |
| 18 | GST Please Enable Macros to View BoQ information |