|
| 1 | Temporary Civil Works |
| 2 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0\\" min. ht.) roof should be projected upto 2'0\\" from all walling. (Payment will be made as per floor area). |
| 3 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0\\" min. ht.) Roof should be projected upto 2'0\\" from all walling. (Payment will be made as per floor area) |
| 4 | Inside walling and ceiling with clean white or colour washed cloth with bamboo/ sal framing and post complete (Restricted item). |
| 5 | Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete (Restricted item). |
| 6 | Walling with clean G.C.I. Sheets with bamboo/sal frame and post complete as per direction (8'0\\" to 10'0\\" ht.). |
| 7 | Fitting, fixing in position of collapsible gate (on hire basis) as per direction.(Payment will be made as per opening length). |
| 8 | Hire and labour charges for bamboo barricading with sal post of 4\\" dia @4' c/c including necessary frame works complete upto 3'0\\" to 4'0\\" ht with 3 rows. |
| 9 | Making of wooden platform upto 1'0\\" ht. Including supply of wooden planks and necessary frame works with post as per direction (Restricted item). |
| 10 | Supplying and laying of tarpaulin as per direction. |
| 11 | Supplying and laying of Carpet (good quality) as per direction. |
| 12 | Making of square or hexagonal mesh netting with wooden frame and bamboo / wooden post as per direction upto 3'0\\" ht. |
| 13 | Gap covering with wooden planks including framing works complete as per direction. |
| 14 | Supplying and fixing in position of door/window curtain. |
| 15 | Making of EVM racks as per drawing and direction including hiring charges of local woods supplying of all other necessary materials and labour complete. |
| 16 | Hire charges of wooden table on hire basis of size 5'0\\"x3'0\\". |
| 17 | Hire charges of wooden table on hire basis of size 4'0\\"x2.5'0\\". |
| 18 | Hire charges of wooden table on hire basis of size 3'0\\"x2'0\\". |
| 19 | Hire charges of Coushion chair. |
| 20 | Hire charges of Polythene chair. |
| 21 | Hire charges of single Sofa. |
| 22 | Hire charges of double Sofa. |
| 23 | Hire charges of Centre table of standard size. |
| 24 | Hire charges of clean white table cloth. |
| 25 | Hire charges of Ceramic flower vase. |
| 26 | Repairing any brick work or concrete work with concrete or brick and make it worthy and safe for election purpose as per direction of EIC |
| 27 | Repairing the wooden chair and table by replacing wooden bar, hinge, clamp etc. as necessary fitting, fixing completed as per direction of EIC |
| 28 | 75 mm. thick brick work with 1st class bricks set in cement, sand mortar (1:4) in ground floor |
| 29 | 125mm. thickbrickworkwith1st class bricks incementmortar (1:4) in ground floor. |
| 30 | Plaster (to wall, floor, ceiling etc.)with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (b) 15 mm thick plaster - 1:4 Proportion |
| 31 | Supply of Daily labour |
| 32 | Supplying & setting of Course Sand bag for Baricading purpose (Inclusive cost of Sand bag ) Please Enable Macros to View BoQ information |