| 1 | Re-org. of 3-phase LT line in Awahdevi market & replacement of bare conductor with AB cable near Awahdevi Tmple in Elect. Sec. Tikkari UESD HPSEBL, Tauni Devi. RCC Muff 2000 mm long with concrete filling material |
| 2 | Channel iron Iron (75X40x5 mm), ( Length-1.50Mtr+0.2Mtr)mm x1 Nos. Per Pole |
| 3 | Shackle Insulator (16 kN) |
| 4 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 5 | LT Stay Set Complete i/c stay clamp) |
| 6 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 7 | Half Clamp made of MS Flat 50x6mm |
| 8 | Façade hook |
| 9 | Anchoring Assembly |
| 10 | Suspension Assembly |
| 11 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 12 | Aluminium Paint |
| 13 | LT egg insulator |
| 14 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 15 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 16 | Erection of (LT cable as per latest standard practices /specification of REC / HPSEBL laying, stringing sagging complete in all respect. |
| 17 | Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 50mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 18 | Prov. 1-ph LT line ext. to left out houses at Ghalot and Dhangu RCC Muff 2000 mm long with concrete filling material |
| 19 | Channel iron Iron 75*40*4.8 mm), 850 mm |
| 20 | Shackle Insulator (16 kN) |
| 21 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 22 | Earh Knob |
| 23 | LT Stay Set Complete i/c stay clamp) |
| 24 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 25 | Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). |
| 26 | Half Clamp made of MS Flat 50x6mm |
| 27 | Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m} |
| 28 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 29 | Aluminium Paint |
| 30 | LT egg insulator |
| 31 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 32 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 33 | Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 50mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 34 | Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. |
| 35 | Add loading/unloading charges of material from Store to site & sie to store including manual carriage as directed by site incharge for complete job. Please Enable Macros to View BoQ information |